1
|
Azamgarh
|
GA INFRA - BABA (JV)
|
MADHANAPAR WATER SUPPLY SCHEME
|
Madhanapar
|
20049909/01
|
Public Hindrance / Local Hindrance
|
04-Feb-2024
|
-
|
Pending
|
Tubewell work done but Public does not allow to start work of other component
|
|
2
|
Azamgarh
|
GAJA - SGIPL (JV)
|
KADSARA WATER SUPPLY SCHEME
|
Kadsara
|
20087245/01
|
Public Hindrance / Local Hindrance
|
03-Dec-2025
|
-
|
Pending
|
Kadsara scheme is in Court Case
|
|
3
|
Azamgarh
|
GAJA - SGIPL (JV)
|
UARI SHIRI WATER SUPPLY SCHEM
|
Umari Shri
|
20101001/01
|
Public Hindrance / Local Hindrance
|
15-Dec-2024
|
-
|
Pending
|
Approach Road not Available (ROW)
|
|
4
|
Azamgarh
|
M/s Sudhakara Infratech Pvt. Ltd
|
BADHARIYA
|
Badhariya
|
20081466/01
|
Public Hindrance / Local Hindrance
|
04-Aug-2026
|
-
|
Pending
|
Public Hindrance
|
|
5
|
Azamgarh
|
M/s Sudhakara Infratech Pvt. Ltd
|
SIDHARI WATER SUPPLY SCHEME
|
Sidhari
|
20100596/01
|
Public Hindrance / Local Hindrance
|
04-Aug-2026
|
-
|
Pending
|
Public Hindrance
|
|
6
|
Azamgarh
|
M/s Sudhakara Infratech Pvt. Ltd
|
Rampur2 water supply scheme
|
Rampur
|
20085943/01
|
Public Hindrance / Local Hindrance
|
04-Aug-2026
|
-
|
Pending
|
public hindrance
|
|
7
|
Azamgarh
|
SIEPL – BRCCPL (JV) / SKYLARK
|
Alampur Water Supply Scheme
|
Alampur
|
20082028/01
|
Public Hindrance / Local Hindrance
|
05-Aug-2026
|
-
|
Pending
|
Tubewell choked by bricks and bottles as construction work was almost 80% done
|
|
8
|
Azamgarh
|
SIEPL – BRCCPL (JV) / SKYLARK
|
Fareedpur Water Supply Scheme
|
Fareedpur
|
20085703/01
|
Public Hindrance / Local Hindrance
|
05-Aug-2026
|
-
|
Pending
|
Tubewell choked by bricks and bottles as construction work was almost 80% done
|
|
9
|
Azamgarh
|
SIEPL – BRCCPL (JV) / SKYLARK
|
Noniya Dih Water Supply Scheme
|
Noniyadih
|
20085956/01
|
Public Hindrance / Local Hindrance
|
05-Aug-2026
|
-
|
Pending
|
Tubewell choked by bricks and bottles as construction work was almost 80% done
|
|
10
|
Azamgarh
|
SIEPL – BRCCPL (JV) / SKYLARK
|
Shekhpur pipri water supply scheme
|
Sasna
|
20101263/01
|
Public Hindrance / Local Hindrance
|
05-Aug-2026
|
-
|
Pending
|
500m laying not proceed as villagers deny to lay pipe in Koirana ( Sasna )
|
|
11
|
Azamgarh
|
SIEPL – BRCCPL (JV) / SKYLARK
|
Muhuwara Khurd Water Supply Scheme
|
Muhuwara Khurd
|
20086080/01
|
Public Hindrance / Local Hindrance
|
05-Aug-2026
|
-
|
Pending
|
Tubewell was choked by local villagers and pipeline work almost completed.
|
|
12
|
Azamgarh
|
VIKRAN-VPRPL (JV)
|
BASTI KA PURI GRAM PANCHAYAT WATER SUPPLY SCHEME
|
Basti Kapuri
|
20088712/01
|
Public Hindrance / Local Hindrance
|
23-Jan-2024
|
-
|
Pending
|
Given land is surrounded by private land, No Approach road available.
|
|
13
|
Azamgarh
|
VIKRAN-VPRPL (JV)
|
NASHOPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
|
Nashopur
|
20100719/01
|
Public Hindrance / Local Hindrance
|
02-Dec-2023
|
-
|
Pending
|
Given Land is Surrounded by private land, No approach road available to reach the campus.
|
|
14
|
Azamgarh
|
VIKRAN-VPRPL (JV)
|
KHARAILA GRAM PANCHAYAT WATER SUPPLY SCHEME
|
Khetla
|
20099262/01
|
Public Hindrance / Local Hindrance
|
13-Nov-2023
|
-
|
Pending
|
Given land is surrounded by private land, No Approach road is available to reach the land.
|
|
15
|
Baghpat
|
LC INFRA
|
GOSPUR W/S SCHEME
|
Gospur
|
20080088/01
|
Public Hindrance / Local Hindrance
|
24-Nov-2025
|
-
|
Pending
|
Local issues of land dispute is there, Therefore, additional time is required to resolve the issue and complete the scheme.
|
|
16
|
Baghpat
|
LC INFRA
|
Subhanpur W/S SCHEME
|
Subhanpur
|
20093570/01
|
Public Hindrance / Local Hindrance
|
16-Nov-2025
|
-
|
Pending
|
Local issues of land dispute is there, Therefore, additional time is required to resolve the issue and complete the scheme.
|
|
17
|
Baghpat
|
LC INFRA
|
GORIPUR JAWAHARNAGAR
|
GORIPUR JAWAHAR NAGAR
|
8361859/01
|
Public Hindrance / Local Hindrance
|
03-Nov-2025
|
-
|
Resolved
|
Local issues of land dispute is there, Therefore, additional time is required to resolve the issue and complete the scheme.
|
|
18
|
Baghpat
|
LC INFRA
|
Fatehpur Poothi WSS
|
FATEHPUR POOTHI
|
20073134/01
|
Public Hindrance / Local Hindrance
|
20-Oct-2025
|
-
|
Pending
|
Local issues of land dispute is there, Therefore, additional time is required to resolve the issue and complete the scheme.
|
|
19
|
Baghpat
|
LC INFRA
|
ahera w/s scheme
|
AHERA
|
20085475/01
|
Public Hindrance / Local Hindrance
|
15-Oct-2025
|
-
|
Pending
|
Local issues of land dispute is there, Therefore, additional time is required to resolve the issue and complete the scheme.
|
|
20
|
Baghpat
|
LC INFRA
|
Biharipur W/S SCHEME
|
BIHARIPUR
|
20093495/01
|
Public Hindrance / Local Hindrance
|
23-Sep-2025
|
-
|
Pending
|
Local issues of land dispute is there, Therefore, additional time is required to resolve the issue and complete the scheme.
|
|
21
|
Baghpat
|
LC INFRA
|
Mansoorpur W/S SCHEME
|
Mansoorpur
|
20093619/01
|
Public Hindrance / Local Hindrance
|
16-Sep-2025
|
-
|
Pending
|
Local issues of land dispute is there, Therefore, additional time is required to resolve the issue and complete the scheme.
|
|
22
|
Baghpat
|
LC INFRA
|
Anandpur Urf Bandpur W/S SCHEME
|
Anandpur Urf Bandpur
|
20093485/01
|
Public Hindrance / Local Hindrance
|
23-Aug-2025
|
-
|
Pending
|
Local issues of land dispute is there, Therefore, additional time is required to resolve the issue and complete the scheme.
|
|
23
|
Baghpat
|
LC INFRA
|
Ramala W/S Scheme
|
Ramala
|
20014308/01
|
Public Hindrance / Local Hindrance
|
11-Aug-2025
|
-
|
Pending
|
Local issues of land dispute is there, Therefore, additional time is required to resolve the issue and complete the scheme.
|
|
24
|
Baghpat
|
LC INFRA
|
Rasoolpur Sankal Poothi wss
|
Rasoolpur Sankal Poothi
|
20060291/01
|
Public Hindrance / Local Hindrance
|
01-Aug-2025
|
-
|
Pending
|
Local issues of land dispute is there, Therefore, additional time is required to resolve the issue and complete the scheme.
|
|
25
|
Baghpat
|
LC INFRA
|
Qyampur W/S SCHEME
|
QYAMPUR
|
20093516/01
|
Public Hindrance / Local Hindrance
|
19-Jul-2025
|
-
|
Pending
|
Local issues of land dispute is there, Therefore, additional time is required to resolve the issue and complete the scheme.
|
|
26
|
Baghpat
|
LC INFRA
|
Barwala W/S SCHEME
|
Barwala
|
20077050/01
|
Public Hindrance / Local Hindrance
|
15-Jul-2025
|
-
|
Pending
|
Local issues of land dispute is there, Therefore, additional time is required to resolve the issue and complete the scheme.
|
|
27
|
Baghpat
|
LC INFRA
|
Khaila W/S SCHEME
|
Khaila
|
20093509/01
|
Public Hindrance / Local Hindrance
|
15-Jul-2025
|
-
|
Pending
|
Local issues of land dispute is there, Therefore, additional time is required to resolve the issue and complete the scheme.
|
|
28
|
Baghpat
|
LC INFRA
|
Nibali W/S SCHEME
|
NIWALI
|
20023770/01
|
Public Hindrance / Local Hindrance
|
10-Jul-2025
|
-
|
Resolved
|
Local issues of land dispute is there, Therefore, additional time is required to resolve the issue and complete the scheme.
|
|
29
|
Baghpat
|
LC INFRA
|
NIWARA W/S SCHEME
|
NIWARA
|
20080099/01
|
Public Hindrance / Local Hindrance
|
25-Jun-2025
|
-
|
Pending
|
Local issues of land dispute is there, Therefore, additional time is required to resolve the issue and complete the scheme.
|
|
30
|
Baghpat
|
LC INFRA
|
GUANA
|
Gauna
|
8362518/01
|
Public Hindrance / Local Hindrance
|
20-Jun-2025
|
-
|
Pending
|
Local issues of land dispute is there, Therefore, additional time is required to resolve the issue and complete the scheme.
|
|
31
|
Baghpat
|
LC INFRA
|
shahpur baroli w/s scheme
|
Shahpur Baroli
|
20014263/01
|
Public Hindrance / Local Hindrance
|
18-Jun-2025
|
-
|
Pending
|
Local issues of land dispute is there, Therefore, additional time is required to resolve the issue and complete the scheme.
|
|
32
|
Baghpat
|
LC INFRA
|
Bali W/S Scheme
|
BALI
|
20014195/01
|
Public Hindrance / Local Hindrance
|
08-Jun-2025
|
-
|
Pending
|
Local issues of land dispute is there, Therefore, additional time is required to resolve the issue and complete the scheme.
|
|
33
|
Baghpat
|
LC INFRA
|
Lohadda
|
Lohadda
|
20033429/01
|
Public Hindrance / Local Hindrance
|
25-May-2025
|
-
|
Pending
|
Local issues of land dispute is there, Therefore, additional time is required to resolve the issue and complete the scheme.
|
|
34
|
Baghpat
|
LC INFRA
|
Fakhapur Mohammad Shahpur W/S SCHEME
|
Fakharpur Mohammad Shahpur
|
20080085/01
|
Public Hindrance / Local Hindrance
|
21-May-2025
|
-
|
Pending
|
Local issues of land dispute is there, Therefore, additional time is required to resolve the issue and complete the scheme.
|
|
35
|
Baghpat
|
LC INFRA
|
rustampur
|
Rustampur
|
20014266/01
|
Public Hindrance / Local Hindrance
|
19-May-2025
|
-
|
Pending
|
Local issues of land dispute is there, Therefore, additional time is required to resolve the issue and complete the scheme.
|
|
36
|
Baghpat
|
LC INFRA
|
chaubli
|
Chaubli
|
20014243/01
|
Public Hindrance / Local Hindrance
|
15-May-2025
|
-
|
Pending
|
Local issues of land dispute is there, Therefore, additional time is required to resolve the issue and complete the scheme.
|
|
37
|
Baghpat
|
LC INFRA
|
Sanjarpur Kaidwa
|
Sanjarpur Kaidwa
|
20023772/01
|
Public Hindrance / Local Hindrance
|
13-May-2025
|
-
|
Pending
|
Local issues of land dispute is there, Therefore, additional time is required to resolve the issue and complete the scheme.
|
|
38
|
Baghpat
|
LC INFRA
|
Alawalpur W/S Scheme
|
Alawalpur
|
20014239/01
|
Public Hindrance / Local Hindrance
|
07-May-2025
|
-
|
Pending
|
Local issues of land dispute is there, Therefore, additional time is required to resolve the issue and complete the scheme.
|
|
39
|
Baghpat
|
LC INFRA
|
Norozpur Aima W/S Scheme
|
Norozpur Aima
|
20097145/01
|
Public Hindrance / Local Hindrance
|
21-Apr-2025
|
-
|
Pending
|
Local issues of land dispute is there, Therefore, additional time is required to resolve the issue and complete the scheme.
|
|
40
|
Baghpat
|
LC INFRA
|
Khaspur W/S Scheme
|
Khaspur
|
20099959/01
|
Public Hindrance / Local Hindrance
|
27-Mar-2025
|
-
|
Pending
|
Local issues of land dispute is there, Therefore, additional time is required to resolve the issue and complete the scheme.
|
|
41
|
Baghpat
|
LC INFRA
|
Tanda W/S Scheme
|
Tanda
|
20014289/01
|
Public Hindrance / Local Hindrance
|
26-Mar-2025
|
-
|
Pending
|
Local issues of land dispute is there, Therefore, additional time is required to resolve the issue and complete the scheme.
|
|
42
|
Baghpat
|
LC INFRA
|
Faizpur Ninana w/s scheme
|
FAIZPUR NINANA
|
20014199/01
|
Public Hindrance / Local Hindrance
|
20-Mar-2025
|
-
|
Pending
|
Local issues of land dispute is there, Therefore, additional time is required to resolve the issue and complete the scheme.
|
|
43
|
Baghpat
|
LC INFRA
|
MURADGAON URF ROSHNGARH W/S Scheme
|
Muradgaon Urf Roshangarh
|
20014207/01
|
Public Hindrance / Local Hindrance
|
17-Mar-2025
|
-
|
Pending
|
Local issues of land dispute is there, Therefore, additional time is required to resolve the issue and complete the scheme.
|
|
44
|
Baghpat
|
LC INFRA
|
Dattnagar
|
Latifpur Dattnagar
|
20014206/01
|
Public Hindrance / Local Hindrance
|
21-Feb-2025
|
-
|
Pending
|
Local issues of land dispute is there, Therefore, additional time is required to resolve the issue and complete the scheme.
|
|
45
|
Baghpat
|
LC INFRA
|
Kheda Islampur W/S SCHEME
|
KHERAE ISLAMPUR
|
20014194/01
|
Public Hindrance / Local Hindrance
|
13-Feb-2025
|
-
|
Pending
|
Local issues of land dispute is there, Therefore, additional time is required to resolve the issue and complete the scheme.
|
|
46
|
Baghpat
|
LC INFRA
|
sadakpur jonmana w/s scheme
|
Sadakpur Jonmana
|
20014251/01
|
Public Hindrance / Local Hindrance
|
10-Feb-2025
|
-
|
Resolved
|
Local issues of land dispute is there, Therefore, additional time is required to resolve the issue and complete the scheme.
|
|
47
|
Baghpat
|
LC INFRA
|
Rajpur Khampur
|
RAJPUR KHAMPUR
|
20016331/01
|
Public Hindrance / Local Hindrance
|
23-Jan-2025
|
-
|
Pending
|
Local issues of land dispute is there, Therefore, additional time is required to resolve the issue and complete the scheme.
|
|
48
|
Baghpat
|
LC INFRA
|
Dhanaura Silvernagar W/S Scheme
|
DHANAURA SILVERNAGAR
|
20014606/01
|
Public Hindrance / Local Hindrance
|
26-Dec-2024
|
-
|
Resolved
|
Local issues of land dispute is there, Therefore, additional time is required to resolve the issue and complete the scheme.
|
|
49
|
Barabanki
|
Megha
|
Sukhipur Water Supply Scheme
|
Sukhipur
|
20068871/01
|
Public Hindrance / Local Hindrance
|
20-Aug-2025
|
-
|
Resolved
|
Local people
|
|
50
|
Barabanki
|
Megha
|
Twndwa Water Supply Scheme
|
Tendwa
|
20057467/01
|
Public Hindrance / Local Hindrance
|
13-Jun-2025
|
-
|
Resolved
|
Local People
|
|
51
|
Budaun
|
PNC-SPML-JV
|
KHURDI JAILAL WATER SUPPLY SCHEME
|
Khurdi
|
20085854/01
|
Public Hindrance / Local Hindrance
|
23-Aug-2023
|
-
|
Pending
|
Villagers are not taking FHTC's.
|
|
52
|
Budaun
|
PNC-SPML-JV
|
MUDA PUKHTA WATER SUPPLY SCHEME
|
Mudha Pukhta
|
20067093/01
|
Public Hindrance / Local Hindrance
|
04-Jul-2023
|
-
|
Pending
|
Villagers are not taking FHTC's claiming that they don't need it.
|
|
53
|
Budaun
|
PNC-SPML-JV
|
BHUJPURA TAPPA JAMINI
|
Gadanpur Sakatpur
|
20024309/01
|
Public Hindrance / Local Hindrance
|
02-Feb-2023
|
-
|
Pending
|
Local people are not allowing to lay pipeline.
|
|
54
|
Etawah
|
Indian Hume Pipe
|
Ayara Luhia PWS
|
Ayara Luhia
|
20024538/01
|
Public Hindrance / Local Hindrance
|
04-Aug-2026
|
-
|
Resolved
|
Baundary wall construction not completed due to public hindrance.
|
|
55
|
Etawah
|
Indian Hume Pipe
|
Pilkhar PWS
|
Pilkhar
|
20022489/01
|
Public Hindrance / Local Hindrance
|
04-Aug-2026
|
-
|
Resolved
|
Baundary wall construction not completed due to public hindrance.
|
|
56
|
Farrukhabad
|
Vindhya-GAJA (JV)
|
BHATPURA SVS
|
Bhatpura
|
20076798/01
|
Public Hindrance / Local Hindrance
|
03-Aug-2026
|
-
|
Pending
|
Main pipeline laying and jointing work pending due to local public not allowing for PWD and Gram panchyat road trench cutting.
|
|
57
|
Farrukhabad
|
Vindhya-GAJA (JV)
|
NAGRIYA JAWAHAR & BHUDHIYA BHERA MVS
|
NAGRIYA JAWAHAR
|
20092981/01
|
Public Hindrance / Local Hindrance
|
03-Aug-2026
|
-
|
Pending
|
Main pipeline laying and jointing work pending due to Gram Pradhan and local public not allowing for Gram panchyat road trench cutting.
|
|
58
|
Gautam Buddha Nagar
|
LC INFRA
|
MEWLA GOPALGARH
|
Mewla Gopalgarh
|
20017820/01
|
Public Hindrance / Local Hindrance
|
24-Dec-2024
|
-
|
Pending
|
Public and pradhan Ji not agree
|
|
59
|
Ghaziabad
|
LC INFRA
|
INAYATPUR PWS SCHEME
|
Inayatpur
|
20021389/01
|
Public Hindrance / Local Hindrance
|
05-Aug-2026
|
20-Sep-2026
|
Pending
|
gram pradhan
|
|
60
|
Ghaziabad
|
LC INFRA
|
BHIKKANPUR PWS SCHEME
|
Bhikkanpur
|
20025892/01
|
Public Hindrance / Local Hindrance
|
05-Aug-2026
|
30-Sep-2026
|
Pending
|
public hindrance on campus
|
|
61
|
Ghaziabad
|
LC INFRA
|
Ravli Kalan village Water Supply Scheme
|
Raoli Kalan
|
20070236/01
|
Public Hindrance / Local Hindrance
|
05-Aug-2026
|
30-Sep-2026
|
Pending
|
Campus hindrances
|
|
62
|
Ghaziabad
|
LC INFRA
|
KUNHAIDA PIPE WATER SUPPLY SCHEME
|
Kunhaida
|
20093533/01
|
Public Hindrance / Local Hindrance
|
05-Aug-2026
|
30-Sep-2026
|
Resolved
|
campus hindrance
|
|
63
|
Ghaziabad
|
LC INFRA
|
MOHAMMADPUR DWEDHA VILLAGE WATER SUPPLY SCHEME
|
Mohammadpur Dahedha
|
20090203/01
|
Public Hindrance / Local Hindrance
|
05-Aug-2026
|
30-Oct-2026
|
Pending
|
campus hindrances
|
|
64
|
Ghaziabad
|
LC INFRA
|
MEWALA BHATTI
|
Mewala Bhatti
|
GZB-03
|
Public Hindrance / Local Hindrance
|
05-Aug-2026
|
30-Dec-2026
|
Pending
|
campus hindrances
|
|
65
|
Ghaziabad
|
LC INFRA
|
SHARIFABAD RAJAPUR
|
Sharifabad Rajapur
|
GZB-10
|
Public Hindrance / Local Hindrance
|
05-Aug-2026
|
30-Sep-2026
|
Resolved
|
Local issues of land disputes is there
|
|
66
|
Ghaziabad
|
LC INFRA
|
AURANGABAD RISTAL
|
Aurangabad Ristal
|
GZB-06
|
Public Hindrance / Local Hindrance
|
05-Aug-2026
|
31-Oct-2026
|
Pending
|
Local issues of land disputes is there
|
|
67
|
Ghaziabad
|
LC INFRA
|
SULTANPUR
|
Sultanpur
|
GZB-29
|
Public Hindrance / Local Hindrance
|
05-Aug-2026
|
30-Nov-2026
|
Pending
|
Pradhan issue
|
|
68
|
Ghaziabad
|
LC INFRA
|
MAHMOODPUR
|
Mahmoodpur
|
GZB-16
|
Public Hindrance / Local Hindrance
|
05-Aug-2026
|
30-Aug-2026
|
Resolved
|
Local issues of land disputes is there
|
|
69
|
Ghaziabad
|
LC INFRA
|
KAJAMPUR PWS SCHEME
|
Kajampur
|
GZB-34
|
Public Hindrance / Local Hindrance
|
05-Aug-2026
|
30-Sep-2026
|
Resolved
|
Local issues of land disputes is there
|
|
70
|
Ghaziabad
|
LC INFRA
|
JALALABAD PWS SCHEME
|
Jalalabad
|
20021475/01
|
Public Hindrance / Local Hindrance
|
05-Aug-2026
|
31-Aug-2026
|
Pending
|
Local issues of land disputes is there
|
|
71
|
Ghaziabad
|
LC INFRA
|
DINANATHPUR POOTHI PWS SCHEME
|
DINANATHPUR PUTHI
|
20021483/01
|
Public Hindrance / Local Hindrance
|
05-Aug-2026
|
31-Aug-2026
|
Resolved
|
Local issues of land disputes is there
|
|
72
|
Ghaziabad
|
LC INFRA
|
SADAT NAGAR IKLA PWS SCHEME
|
Sadat Nagar Ikla
|
20022910/01
|
Public Hindrance / Local Hindrance
|
05-Aug-2026
|
31-Aug-2026
|
Resolved
|
Local issues of land disputes is there
|
|
73
|
Ghaziabad
|
LC INFRA
|
SIRORA SALEMPUR PWS SCHEME
|
Sirora Salempur
|
20023594/01
|
Public Hindrance / Local Hindrance
|
05-Aug-2026
|
30-Sep-2026
|
Resolved
|
Local issues of land disputes is there
|
|
74
|
Ghaziabad
|
LC INFRA
|
NAGLA FIROZ MOHANPUR PWS SCHEME
|
Nagla Firoj Mohanpur
|
20023620/01
|
Public Hindrance / Local Hindrance
|
05-Aug-2026
|
30-Sep-2026
|
Resolved
|
Local issues of land disputes is there
|
|
75
|
Ghaziabad
|
LC INFRA
|
AGROULA PWS SCHEME
|
Agraula
|
20025882/01
|
Public Hindrance / Local Hindrance
|
05-Aug-2026
|
31-Dec-2026
|
Pending
|
Local issues of land disputes is there
|
|
76
|
Ghaziabad
|
LC INFRA
|
FATIYABAD NIHAURA PWS SCHEME
|
Fatiyabad Nitora
|
GZB-08
|
Public Hindrance / Local Hindrance
|
05-Aug-2026
|
31-Aug-2026
|
Resolved
|
Local issues of land disputes is there
|
|
77
|
Ghaziabad
|
LC INFRA
|
KILHAUDA PWS SCHEME
|
Kilhauda
|
GZB-09
|
Public Hindrance / Local Hindrance
|
05-Aug-2026
|
31-Aug-2026
|
Resolved
|
Local issues of land disputes is there
|
|
78
|
Ghaziabad
|
LC INFRA
|
SIKRIKHURD PWS SCHEME
|
Sikri Khurd
|
GZB-27
|
Public Hindrance / Local Hindrance
|
05-Aug-2026
|
30-Sep-2026
|
Resolved
|
Local issues of land disputes is there
|
|
79
|
Ghaziabad
|
LC INFRA
|
PANCHAYARA PWS SCHEME
|
Panchayara
|
GZB-28
|
Public Hindrance / Local Hindrance
|
05-Aug-2026
|
29-Sep-2026
|
Resolved
|
Local issues of land disputes is there
|
|
80
|
Ghaziabad
|
LC INFRA
|
NANU PWS SCHEME
|
Nanu
|
20026204/01
|
Public Hindrance / Local Hindrance
|
05-Aug-2026
|
31-Aug-2026
|
Resolved
|
Local issues of land disputes is there
|
|
81
|
Ghaziabad
|
LC INFRA
|
BADSHAHPUR SIROLI PWS SCHEME
|
Badshahpur Sirouli
|
20026223/01
|
Public Hindrance / Local Hindrance
|
05-Aug-2026
|
30-Sep-2026
|
Resolved
|
Local issues of land disputes is there
|
|
82
|
Ghaziabad
|
LC INFRA
|
BARKA ARIFPUR PWS SCHEME
|
Badka Arifpur
|
20026225/01
|
Public Hindrance / Local Hindrance
|
05-Aug-2026
|
31-Aug-2026
|
Resolved
|
BARKA ARIFPUR PWS SCHEME
|
|
83
|
Ghaziabad
|
LC INFRA
|
AFJALPUR PWS SCHEME
|
Afzalpur
|
20026568/01
|
Public Hindrance / Local Hindrance
|
05-Aug-2026
|
30-Nov-2026
|
Resolved
|
Local issues of land disputes is there
|
|
84
|
Hathras
|
BGCCPL-Ramky (JV)
|
DAUDA BANKA WATER SUPPLY SCHEME
|
DAUDA
|
20098369/01
|
Public Hindrance / Local Hindrance
|
16-Sep-2024
|
-
|
Resolved
|
electric Connection still Pending
|
|
85
|
Jaunpur
|
Welspun Kaveri Infraprojects JV
|
Kuchhmuchh Scheme-2
|
Kuchhmuchh
|
20089696/01
|
Public Hindrance / Local Hindrance
|
15-Mar-2023
|
-
|
Pending
|
Work Hampered due to Local Hindrance for laying the Pipeline network
|
|
86
|
Jaunpur
|
Welspun Kaveri Infraprojects JV
|
Kewtli
|
Kewtli
|
20089691/01
|
Public Hindrance / Local Hindrance
|
15-Mar-2023
|
-
|
Pending
|
Boundary wall construction work hampered due to local public hindrance.
|
|
87
|
Jaunpur
|
Welspun Kaveri Infraprojects JV
|
DEORAM PUR
|
Deoram Pur
|
20064889/01
|
Public Hindrance / Local Hindrance
|
27-Jan-2023
|
-
|
Pending
|
Boundary wall Construction Work Hampered due to local public hindrance. (Reorganisation Scheme)
|
|
88
|
Jaunpur
|
Welspun Kaveri Infraprojects JV
|
Badouli Ahiran
|
Badouli Ahiran
|
20067727/01
|
Public Hindrance / Local Hindrance
|
27-Jan-2023
|
-
|
Pending
|
Work Hampered due to Local Hindrance for laying the Pipeline network
|
|
89
|
Kanpur Nagar
|
Vindhya-GAJA (JV)
|
SUBHANPUR MURADNAGAR & BIBIPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
|
Subhanpur Muradnagar
|
VTL_KN_247
|
Public Hindrance / Local Hindrance
|
26-May-2023
|
-
|
Pending
|
Approach Road Issue
|
|
90
|
Kushi Nagar
|
NCC Ltd.
|
SIKTA GOGP
|
Pipraicha
|
20078358-OHT1
|
Public Hindrance / Local Hindrance
|
04-Jul-2024
|
20-Oct-2026
|
Resolved
|
3500 Mtr GOGP Issue by Local villagers.Not allowing to work in this Revenue Village.
|
|
91
|
Kushi Nagar
|
NCC Ltd.
|
Rampur Gonha
|
Rampur Gonha
|
20050005-OHT1
|
Public Hindrance / Local Hindrance
|
15-Jun-2024
|
25-Nov-2026
|
Resolved
|
Parlallel along Railway Line & Pradhan Issue.2360 Mtr Pipe Laying affected.
|
|
92
|
Kushi Nagar
|
NCC Ltd.
|
SARISWA
|
Khiriya
|
20078851-OHT1
|
Public Hindrance / Local Hindrance
|
10-Jun-2024
|
10-Oct-2026
|
Resolved
|
Due to GOGP Issue 7000 mtr Pipe laying work stopped by Local Villagers.
|
|
93
|
Kushi Nagar
|
NCC Ltd.
|
BARWA RATANPURA RO
|
Barwa Ratanpur
|
20098935-OHT1
|
Public Hindrance / Local Hindrance
|
04-Jun-2024
|
15-Oct-2026
|
Resolved
|
Local Hindarance up to 3400 Mtr by Local Villagers.
|
|
94
|
Kushi Nagar
|
NCC Ltd.
|
MITHHA MAFI
|
MITHHA MAFI
|
20042197-OHT1
|
Public Hindrance / Local Hindrance
|
04-Jun-2024
|
25-Sep-2026
|
Resolved
|
GOGP Issue approx 4030 Mtr .Villagers not allowing Pipe laying Work.
|
|
95
|
Kushi Nagar
|
NCC Ltd.
|
SINGAHA
|
Sigha
|
20101604-OHT1
|
Public Hindrance / Local Hindrance
|
04-Jun-2024
|
20-Nov-2026
|
Resolved
|
Loacal Hindarance Pipe laying 4104 Mtr .Pipe line laying stop by local villagers.
|
|
96
|
Kushi Nagar
|
NCC Ltd.
|
SOHASAPATTI GOUSI GOGP
|
Sohsa Patti Gausi
|
20078357-OHT1
|
Public Hindrance / Local Hindrance
|
04-Jun-2024
|
20-Oct-2026
|
Resolved
|
Gram pradhan row by Local Hindrance 1920 Mtr
|
|
97
|
Kushi Nagar
|
NCC Ltd.
|
MAHUA DIH LAUNGRAPUR GOGP
|
Baidauli Mahua Dih
|
20078331-OHT1
|
Public Hindrance / Local Hindrance
|
04-Apr-2024
|
20-Oct-2026
|
Resolved
|
GOGP Issue of 10147 Mtr.Pipe laying not done due GOGP Issue by Local Villagers
|
|
98
|
Kushi Nagar
|
NCC Ltd.
|
LALIPAR GOGP
|
Chhitauni
|
20078318-OHT1
|
Public Hindrance / Local Hindrance
|
10-Feb-2024
|
15-Oct-2026
|
Resolved
|
Local Hindarnce by 1660 Mtr .Pipe
|
|
99
|
Kushi Nagar
|
NCC Ltd.
|
MAHUI KHURD
|
Bharwalia
|
20081810-OHT1
|
Public Hindrance / Local Hindrance
|
05-Feb-2024
|
20-Nov-2026
|
Resolved
|
GOGP Issue of 4840 Mtr by Local Villagers.
|
|
100
|
Kushi Nagar
|
NCC Ltd.
|
NATWALIYA GOGP
|
Chirgoda
|
20076106-OHT1
|
Public Hindrance / Local Hindrance
|
04-Feb-2024
|
15-Oct-2026
|
Resolved
|
GOGP Issue of 7209 Mtr by Local Villagers.
|
|
101
|
Kushi Nagar
|
NCC Ltd.
|
KHOTAHI
|
Khotahi
|
20101616-OHT1
|
Public Hindrance / Local Hindrance
|
04-Feb-2024
|
15-Oct-2026
|
Resolved
|
Local Hinadance 4100 mtr by Villager Stop work.
|
|
102
|
Kushi Nagar
|
NCC Ltd.
|
PIPRAGHAT MUSTKIL R
|
Pipraghat Mustkil
|
20098907/01
|
Public Hindrance / Local Hindrance
|
04-Feb-2024
|
25-Sep-2026
|
Resolved
|
Gram Pradhan issue by 2000 mtr Pipe laying work stopped.
|
|
103
|
Kushi Nagar
|
NCC Ltd.
|
SANERAMAL CHHAPARA
|
Pakari Bangar
|
20081552-OHT1
|
Public Hindrance / Local Hindrance
|
04-Feb-2024
|
15-Sep-2026
|
Resolved
|
GOGP issue by Local Villagers approx 5000 Mtr Row by Local Villagers.
|
|
104
|
Kushi Nagar
|
NCC Ltd.
|
PAREWATER GOGP
|
Bhathahi Raja
|
20078353-OHT1
|
Public Hindrance / Local Hindrance
|
04-Feb-2024
|
10-Oct-2026
|
Resolved
|
GOGP issue by Local Villagers approx 3050 Mtr Pipe laying work stopped by Villagers.
|
|
105
|
Kushi Nagar
|
NCC Ltd.
|
Baghparna
|
Motipur
|
20039737-OHT1
|
Public Hindrance / Local Hindrance
|
04-Jan-2024
|
20-Sep-2026
|
Resolved
|
GOGP issue by Local Villagers approx 3010 mtr Pipe laying work stopped by villgers
|
|
106
|
Kushi Nagar
|
NCC Ltd.
|
JOGIA SHAMLI PATTI GROUP OF G.P.s
|
Jogia Hichharai
|
20077419-OHT1
|
Public Hindrance / Local Hindrance
|
04-Jul-2023
|
20-Oct-2026
|
Resolved
|
GOGP Issue in Jogia Hichharai .Pipe laying 7890 Mtr work stopped .
|
|
107
|
Kushi Nagar
|
NCC Ltd.
|
HARAIYA BUZURG
|
Kohra
|
20079384-OHT1
|
Public Hindrance / Local Hindrance
|
04-Jun-2023
|
15-Sep-2026
|
Resolved
|
GOGP Issue by Villagers approx 4000 Mtr Pipe laying work Stopped by Villagers
|
|
108
|
Maharajganj
|
Rithwik-Koya (JV)
|
MATIHANWA W/S Scheme
|
Mathihanwa
|
20097802/01
|
Public Hindrance / Local Hindrance
|
05-Jul-2026
|
30-Oct-2026
|
Pending
|
Personal Land
|
|
109
|
Muzaffarnagar
|
JMC - Lakshmi (JV)
|
Datiyana
|
Datiyana
|
20017605/01
|
Public Hindrance / Local Hindrance
|
04-Aug-2026
|
-
|
Pending
|
The Villagers are opposing the pipeline laying
|
|
110
|
Muzaffarnagar
|
JMC - Lakshmi (JV)
|
ABDULLA NAGAR URF SONTA MV WSS
|
Abdulla Nagar Urf Sonta
|
20080969/01
|
Public Hindrance / Local Hindrance
|
04-Aug-2026
|
-
|
Pending
|
Villagers hindrance
|
|
111
|
Pilibhit
|
PNC-SPML-JV
|
PARASI URF PARASIA VILLAGE WATER SUPPLY SCHEME
|
Parasi Urf Parasia
|
20013902/01
|
Public Hindrance / Local Hindrance
|
05-Aug-2025
|
-
|
Resolved
|
local people creating issue on pipelaying
|
|
112
|
Pilibhit
|
PNC-SPML-JV
|
NIZAM DANDI VILLAGE WATER SUPPLY SCHEME
|
Nizam Dandi
|
20013743/01
|
Public Hindrance / Local Hindrance
|
05-Aug-2025
|
-
|
Resolved
|
Local People issue for approach road to over head tank campus.
|
|
113
|
Pilibhit
|
PNC-SPML-JV
|
ARJUNPUR MUSTQIL
|
Arjunpur Must.
|
8389916/01
|
Public Hindrance / Local Hindrance
|
05-Aug-2025
|
-
|
Resolved
|
Local people oppose in Laying of Pipe.
|
|
114
|
Pilibhit
|
PNC-SPML-JV
|
SONDHA & BAGAR VILLAGE WATER SUPPLY SCHEME
|
Bangar
|
20013635/01
|
Public Hindrance / Local Hindrance
|
05-Aug-2024
|
-
|
Resolved
|
Local people do not agree to pipe laying.
|
|
115
|
Pilibhit
|
PNC-SPML-JV
|
NARAYANPUR VILLAGE WATER SUPPLY SCHEME
|
Narayanpur
|
20013668/01
|
Public Hindrance / Local Hindrance
|
05-Aug-2024
|
-
|
Resolved
|
Local people oppossing for Pipelaying.
|
|
116
|
Pilibhit
|
PNC-SPML-JV
|
RAMPURA NATTHU VILLAGE WATER SUPPLY SCHEME
|
Rampura Natthu
|
20013755/01
|
Public Hindrance / Local Hindrance
|
05-Aug-2024
|
-
|
Resolved
|
Local People oppossing for pipelaying.
|
|
117
|
Pilibhit
|
PNC-SPML-JV
|
HARDASPUR VILLAGE WATER SUPPLY SCHEME
|
Hardaspur
|
20013570/01
|
Public Hindrance / Local Hindrance
|
04-May-2023
|
-
|
Resolved
|
Local people oppose to lay the pipe in village.
|
|
118
|
Pilibhit
|
VISHVARAJ
|
BHINDARA GP WATER SUPPLY SCHEME
|
Bhindara
|
20057519/01
|
Public Hindrance / Local Hindrance
|
20-Dec-2024
|
-
|
Pending
|
The Chairman of the Nagar Panchayat has denied permission for the NH crossing jointing from the laid pipeline.
|
|
119
|
Pilibhit
|
VISHVARAJ
|
BAIBAHA +3 MULTI GP WATER SUPPLY SCHEME
|
Baibaha
|
20059990/01
|
Public Hindrance / Local Hindrance
|
25-Aug-2024
|
-
|
Pending
|
Sikh community is resisting dismantling-restoration and laying of pipeline work.
|
|
120
|
Pilibhit
|
VISHVARAJ
|
raipur + 2 multi gp water supply scheme
|
Raipur
|
20060430/01
|
Public Hindrance / Local Hindrance
|
14-Jun-2024
|
-
|
Pending
|
The Gram Pradhan is resisting CC dismantling -restoration and pipeline laying works.
|
|
121
|
Pilibhit
|
VISHVARAJ
|
BITHAURA KALAN GRAM PANCHAYAT WATER SUPPLY SCHEME
|
Bithaura Kalan
|
20060822/01
|
Public Hindrance / Local Hindrance
|
14-Jun-2024
|
-
|
Pending
|
Gram pradhan is resisting the dismantling -restoration and pipeline laying work.
|
|
122
|
Pilibhit
|
VISHVARAJ
|
GAJRAULA KALAN MUSTQIL GP WATER SUPPLY SCHEME
|
Gajraula Kalan Mustqil
|
20067506/01
|
Public Hindrance / Local Hindrance
|
14-Jun-2024
|
-
|
Pending
|
Pipeline laying is affected due to denial of CC dismantling - restoration by villagers.
|
|
123
|
Pilibhit
|
VISHVARAJ
|
LALPURIA SAHEB SINGH+ 1 MULTI GP WATER SUPPLY SCHEME
|
Lalpuria Saheb Singh
|
20096313/01
|
Public Hindrance / Local Hindrance
|
14-Jun-2024
|
-
|
Pending
|
Residents of Tirumala Colony have denied permission for dismantling- restoration and pipeline laying work.
|
|
124
|
Pilibhit
|
VISHVARAJ
|
NAGRA RATA +1MGP Water Supply Scheme
|
Nagra Rata
|
20067099/01
|
Public Hindrance / Local Hindrance
|
14-Jun-2024
|
-
|
Pending
|
Villagers are resisting CC dismantling- restoration and pipeline laying works.
|
|
125
|
Pilibhit
|
VISHVARAJ
|
BAREHPURA MARURI + 2 mULTI GP wATER SUPPLY SCHEME
|
Barhepura Marauri
|
20061462/01
|
Public Hindrance / Local Hindrance
|
14-Jun-2024
|
-
|
Pending
|
The Gram Pradhan is resisting CC dismantling - restoration and Pipelaying work.
|
|
126
|
Pilibhit
|
VISHVARAJ
|
Udara +1 GRAM PANCHAYAT WATER SUPPLY SCHEME
|
Udara
|
20060888/01
|
Public Hindrance / Local Hindrance
|
14-May-2024
|
-
|
Pending
|
Pipeline laying is affected due to resistance from the Sikh community.
|
|
127
|
Pilibhit
|
VISHVARAJ
|
ROOPPUR KRIPA GP WATER SUPPLY SCHEME
|
Roop Pur Kripa
|
20096347/01
|
Public Hindrance / Local Hindrance
|
17-Apr-2024
|
-
|
Pending
|
Gram pradhan is denying the cc restoration and jointing work, which is hampering water supply.
|
|
128
|
Pilibhit
|
VISHVARAJ
|
TANDA BIJAISI SAHRAI GRAM PANCHAYAT WATER SUPPLY SCHEME
|
Tanda Bijaisi Sahrai
|
20060909/01
|
Public Hindrance / Local Hindrance
|
14-Mar-2024
|
-
|
Pending
|
Pipeline laying and household connections are affected due to resistance from the Sikh community. Railway authorities have also denied permission for pipeline laying along the railway line.
|
|
129
|
Pilibhit
|
VISHVARAJ
|
PAREWA TA KISHANI +1 MULTI GP WATER SUPPLY SCHEME
|
Parewa T. Kishni
|
20060702/01
|
Public Hindrance / Local Hindrance
|
14-Mar-2024
|
-
|
Pending
|
The Gram Pradhan is resisting in dismantling -restoration & pipeline laying work.
|
|
130
|
Pilibhit
|
VISHVARAJ
|
CHURRA SAKATPUR + 1 MULTI GRAM PANCHAYAT WATER SUPPLY SCHEME
|
Churra Sakatpur
|
20060529/01
|
Public Hindrance / Local Hindrance
|
14-Mar-2024
|
-
|
Pending
|
The Gram Pradhan is resisting in dismantling-restoration and pipelaying work.
|
|
131
|
Pilibhit
|
VISHVARAJ
|
KADHER CHAURA T.GAJRAULA GP WATER SUPPLY SCHEME
|
KADHER CHAURA T. GAJRAULA
|
20060431/01
|
Public Hindrance / Local Hindrance
|
14-Mar-2024
|
-
|
Pending
|
Pipelaying works remains pending due to resistance from the Sikh community.
|
|
132
|
Pilibhit
|
VISHVARAJ
|
richola mustqil + 1 Multi GP water supply scheme
|
Richhola Mustqil
|
20056535/01
|
Public Hindrance / Local Hindrance
|
05-Jan-2024
|
-
|
Pending
|
Local villagers and Pradhan are restricting the laying of pipeline .
|
|
133
|
Pilibhit
|
VISHVARAJ
|
CHUTKUNA+ 1 MULTI GRAM PANCHAYAT WATER SUPPLY SCHEME
|
Chutkuna
|
20051097/01
|
Public Hindrance / Local Hindrance
|
22-Oct-2023
|
-
|
Pending
|
The Gram Pradhan is resisting dismantling - restoration and pipeline laying work.
|
|
134
|
Pilibhit
|
VISHVARAJ
|
BILHARI GRAM PANCHAYAT WATER SUPPLY SCHEME
|
Gadyana
|
20051048/01
|
Public Hindrance / Local Hindrance
|
22-Oct-2023
|
-
|
Pending
|
Pipeline in RV Gadiyana remains pending due to resistance from the Sikh community.
|
|
135
|
Pilibhit
|
VISHVARAJ
|
SARAINDA PATTI +1 MULTI GP WATER SUPPLY SCHEME
|
SARAINDA PATTI
|
20024032/01
|
Public Hindrance / Local Hindrance
|
05-Sep-2023
|
-
|
Pending
|
Local villagers denying for pipe laying work in entire Village (Saraidapatti).
|
|
136
|
Pilibhit
|
VISHVARAJ
|
BHARATPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
|
Bharatpur
|
20060918/01
|
Public Hindrance / Local Hindrance
|
14-Aug-2023
|
-
|
Pending
|
Pipeline laying of approximately 5 km is pending due to resistance from the Sikh community.
|
|
137
|
Pilibhit
|
VISHVARAJ
|
KANPARI +1 MULTI GP WATER SUPPLY SCHEME
|
Kanpari
|
20053324/01
|
Public Hindrance / Local Hindrance
|
20-Apr-2023
|
-
|
Pending
|
The Gram Pradhan is resisting dismantling -restoration and pipeline laying.
|
|
138
|
Pilibhit
|
VISHVARAJ
|
bangla urf mitrasen gp water supply scheme
|
Bangla Urf Mitrasen
|
20051205/01
|
Public Hindrance / Local Hindrance
|
05-Jan-2023
|
-
|
Pending
|
Local villagers and Pradhan are restricting the laying of pipeline in entire village(Abahipur)
|
|
139
|
Pilibhit
|
VISHVARAJ
|
AJITPUR BILHA+ 1 MULTI GP WATER SUPPLY SCHEME
|
Lukathai
|
20053229/01
|
Public Hindrance / Local Hindrance
|
21-Nov-2022
|
-
|
Pending
|
Pipeline laying in RV Lukthai is pending due to restrictions imposed by the Gram Pradhan, who is demanding a separate OHT for the village.
|
|
140
|
Raebareli
|
NCC Ltd.
|
RASI GAON WATER SUPPLY SCHEME
|
Rasi Gaon
|
20062154-OHT-01
|
Public Hindrance / Local Hindrance
|
-
|
-
|
Pending
|
Due to the Row by local villagers, we are unable to connect 100 meters with 2 Habitations (Lala Ka Purwa & Baba ka Purwa)
|
|
141
|
Raebareli
|
NCC Ltd.
|
CHHIVLA MAU
|
Chhivla Mau
|
8361773-OHT-01
|
Public Hindrance / Local Hindrance
|
-
|
-
|
Pending
|
ROW Approach road issue
|
|
142
|
Raebareli
|
NCC Ltd.
|
LOHANIPUR
|
Lohanipur
|
8361805/01
|
Public Hindrance / Local Hindrance
|
-
|
-
|
Pending
|
ROW obstruction of pipeline-laying work by pradhan
|
|
143
|
Rampur
|
OMIL-JWIL (JV)
|
Dhaki MV GP W/S SCHEME
|
Dhaki
|
R181
|
Public Hindrance / Local Hindrance
|
05-Aug-2026
|
-
|
Pending
|
The land allotted for the tubewell was claimed as a playground.
|
|
144
|
Rampur
|
OMIL-JWIL (JV)
|
HAMIDABAD SV W/S SCHEME
|
Hamidabad
|
R197
|
Public Hindrance / Local Hindrance
|
05-Aug-2026
|
-
|
Pending
|
Approach road not available for campus.
|
|
145
|
Rampur
|
OMIL-JWIL (JV)
|
NAGARIA KALAN GP W/S SCHEME
|
Nagaria Kalan
|
R216
|
Public Hindrance / Local Hindrance
|
05-Aug-2026
|
-
|
Pending
|
The land allotted for the tubewell work belongs to a private society.
|
|
146
|
Sant Kabeer Nagar
|
JAKSON
|
Kasauna Khurd GP WSS
|
KASAUNA KHURD
|
20084486/01
|
Public Hindrance / Local Hindrance
|
03-Jun-2023
|
-
|
Pending
|
yahan kafi lambe samay se alloted land par local public ka hinrance hai, kyonki ye SVS hai to yahan kary complete karne ka samay bhi bahut kam hai
|
|
147
|
Sant Kabeer Nagar
|
VISHVARAJ
|
Sais Rao Mafi GP WSS
|
Sahs Rauwa Maphi
|
20087676
|
Public Hindrance / Local Hindrance
|
05-Aug-2026
|
31-Oct-2026
|
Pending
|
The construction work could not be commenced due to encroachment on the village government approach road. However, the tube well has been constructed.
|
|
148
|
Sant Kabeer Nagar
|
VISHVARAJ
|
SIYARA SANTHA GP WSS
|
Siyara Santha
|
20085970
|
Public Hindrance / Local Hindrance
|
05-Aug-2026
|
31-Oct-2026
|
Pending
|
No approach road is available to the government land for construction activities. Although the tube well has been constructed, the remaining works could not be started due to the lack of an approach road.
|
|
149
|
Sant Kabeer Nagar
|
VISHVARAJ
|
TEJPUR GP WSS
|
Tejpur
|
20090056
|
Public Hindrance / Local Hindrance
|
05-Aug-2026
|
31-Oct-2026
|
Pending
|
No approach road is available to the government land for construction activities. Although the tube well has been constructed, the remaining works could not be started due to the lack of an approach road.
|
|
150
|
Sant Kabeer Nagar
|
VISHVARAJ
|
BACHCHAIPUR GP WSS
|
Bachhaipur
|
20086341
|
Public Hindrance / Local Hindrance
|
05-Aug-2026
|
30-Nov-2026
|
Pending
|
The tube well has been constructed; however, the remaining works could not be commenced due to the lack of a suitable approach road.
|
|
151
|
Sant Kabeer Nagar
|
VISHVARAJ
|
PADARAI WATER SUPPLY SCHEME
|
Paraisya
|
20093169
|
Public Hindrance / Local Hindrance
|
05-Aug-2026
|
30-Nov-2026
|
Pending
|
No approach road is available to the government land for carrying out the construction work. The village is under the land consolidation (Chakbandi) process. The tube well has been constructed; however, the remaining works could not be commenced due to the absence of an approach road.
|
|
152
|
Sant Kabeer Nagar
|
VISHVARAJ
|
BANTWAR & BELMA GOV WATER SUPPLY SCHEME
|
Bantwar
|
20094318
|
Public Hindrance / Local Hindrance
|
05-Aug-2026
|
30-Nov-2026
|
Pending
|
The residents of Belma village are demanding a separate overhead water tank, due to which they are obstructing the pipeline laying and household connection works.
|
|
153
|
Sant Kabeer Nagar
|
VISHVARAJ
|
RAJNAULI & SANTHI GP WSS
|
Rajnauli
|
20086765
|
Public Hindrance / Local Hindrance
|
05-Aug-2026
|
30-Nov-2026
|
Pending
|
The residents of Rajnauli village are demanding a separate overhead water tank, resulting in resistance to the pipeline laying and household connection works.
|
|
154
|
Sant Kabeer Nagar
|
VISHVARAJ
|
DARUA JAPTI ADALAT & SHIVAPAR GOV WSS
|
Darua Japti Adalat
|
20086124
|
Public Hindrance / Local Hindrance
|
05-Aug-2026
|
30-Nov-2026
|
Pending
|
No approach road is available to the government land for construction activities. The tube well has been constructed; however, the remaining works could not be carried out without obstruction due to the absence of an approach road.
|
|
155
|
Sant Kabeer Nagar
|
VISHVARAJ
|
ASHRAFABAD, MOHAMMADPUR & MOHIUDDINPUR GOV W/S Scheme
|
Asharfabad
|
20094214
|
Public Hindrance / Local Hindrance
|
05-Aug-2026
|
30-Nov-2026
|
Pending
|
No approach road is available to the government land at the 2nd land location for carrying out the construction work. Consequently, the construction work is being hindered.
|
|
156
|
Sant Kabeer Nagar
|
VISHVARAJ
|
TENUHARI DOEM
|
Tenuhari Doem
|
20085422
|
Public Hindrance / Local Hindrance
|
05-Aug-2026
|
18-Nov-2026
|
Pending
|
No approach road is available to the government land. Due to the absence of an approach road, the remaining works could not be commenced.
|
|
157
|
Sant Kabeer Nagar
|
VISHVARAJ
|
GANGAICHA & JATEDEEHA GOV WSS
|
Jatedeeha Dubaulia
|
20086874
|
Public Hindrance / Local Hindrance
|
05-Aug-2026
|
30-Oct-2026
|
Pending
|
The villagers are opposing the use of the private approach road, which is hindering the construction work.
|
|
158
|
Sant Kabeer Nagar
|
VISHVARAJ
|
Sehura & Koelsa GOV WSS
|
Sehura
|
20086908
|
Public Hindrance / Local Hindrance
|
05-Aug-2026
|
30-Nov-2026
|
Pending
|
No approach road is available to the government land. Consequently, the construction work cannot be executed smoothly due to the absence of an approach road.
|
|
159
|
Sant Kabeer Nagar
|
VISHVARAJ
|
Pipra Doman & Muradeeha Khurd GP WSS
|
Pipra Doman
|
20086895
|
Public Hindrance / Local Hindrance
|
05-Aug-2026
|
31-Dec-2026
|
Pending
|
No approach road is available to the government land.
|
|
160
|
Sant Kabeer Nagar
|
VISHVARAJ
|
CHAGERA MANGERA GP WSS
|
Chagera Mangera
|
20085382
|
Public Hindrance / Local Hindrance
|
05-Aug-2026
|
30-Nov-2026
|
Pending
|
The pipeline from Tube Well-2 to the Overhead Tank (OHT) campus could not be laid due to issues related to the availability of an approach route.
|
|
161
|
Shahjahanpur
|
NCC Ltd.
|
SITHARA GP MULTI VILLAGE WSS
|
Sithara
|
20093790/01
|
Public Hindrance / Local Hindrance
|
05-Aug-2026
|
30-Jun-2028
|
Pending
|
Local issues of land dispute is there, Therefore, additional time is required to resolve the issue and complete the scheme.
|
|
162
|
Shahjahanpur
|
NCC Ltd.
|
SHAHVEGNAGAR GRAM PANCHAYAT VILLAGE WATER SUPPLY SCHEME
|
Shahvegpur
|
20097898/01
|
Public Hindrance / Local Hindrance
|
05-Aug-2026
|
31-Oct-2027
|
Pending
|
Local issues of land dispute is there, Therefore, additional time is required to resolve the issue and complete the scheme.
|
|
163
|
Sultanpur
|
Gayatri Projects LTD
|
Ameremaon water supply scheme
|
Amaremaoo
|
20021207/01
|
Public Hindrance / Local Hindrance
|
31-Dec-2022
|
31-Aug-2026
|
Pending
|
For the 2nd bore land issue
|