1
|
Barabanki
|
Gayatri Projects LTD
|
Gangchauli G.P WSS Scheme
|
Gangchauli
|
20000645/01
|
Road Widening / Pipeline Damage
|
06-Aug-2026
|
06-Nov-2026
|
Pending
|
The pipeline for the Gangchauli scheme has been damaged during the widening of Kursi - Mahmudabad Road. Work on re-laying the pipe and jointing is currently in progress. The remaining pipeline work will be completed after receiving instructions from PWD
|
|
2
|
Barabanki
|
Gayatri Projects LTD
|
maujanipur water supply scheme
|
Maujanipur
|
8359240/01
|
Road Widening / Pipeline Damage
|
05-Aug-2026
|
05-Sep-2026
|
Resolved
|
The pipeline for the Maujanipur scheme has been damaged during the widening of Dewa to Sadruddinpur Road. Work on re-laying the pipe and jointing is currently in progress.
|
|
3
|
Barabanki
|
Megha
|
Sarai Barai Water Supply Scheme
|
Sarai Barai
|
20057372/01
|
Road Widening / Pipeline Damage
|
28-Jul-2026
|
-
|
Pending
|
Pipeline Damage
|
|
4
|
Barabanki
|
Megha
|
Khamoli Water Supply Scheme
|
Khamoli
|
20068943/01
|
Road Widening / Pipeline Damage
|
25-Jul-2026
|
-
|
Pending
|
Pipeline Damage
|
|
5
|
Barabanki
|
Megha
|
Sukhipur Water Supply Scheme
|
Sukhipur
|
20068871/01
|
Road Widening / Pipeline Damage
|
18-Jul-2026
|
-
|
Pending
|
Pipeline Damage
|
|
6
|
Barabanki
|
Megha
|
Neopura Water Supply Scheme
|
Neapura
|
20091503/01
|
Road Widening / Pipeline Damage
|
16-Jul-2026
|
-
|
Pending
|
Pipeline Damage
|
|
7
|
Barabanki
|
Megha
|
Puredalai Water Supply Scheme
|
Pureydalai
|
20057368/01
|
Road Widening / Pipeline Damage
|
15-Jul-2026
|
-
|
Pending
|
Pipeline Damage
|
|
8
|
Barabanki
|
Megha
|
Fatehpur Kalan Water Supply Scheme
|
Fattapur Kalan
|
20068834/01
|
Road Widening / Pipeline Damage
|
12-Jul-2026
|
-
|
Pending
|
Pipeline Damage
|
|
9
|
Barabanki
|
Megha
|
SaraiSauf Water Supply Scheme
|
Saraisaif
|
20057396/01
|
Road Widening / Pipeline Damage
|
10-Jul-2026
|
-
|
Pending
|
Pipeline Damage
|
|
10
|
Barabanki
|
Megha
|
Udaimau Water Supply Scheme
|
Udaimau
|
20068874/01
|
Road Widening / Pipeline Damage
|
05-Jul-2026
|
-
|
Pending
|
Pipeline Damage
|
|
11
|
Barabanki
|
Megha
|
Arsanda & Khutauli Water Supply Scheme
|
Arasanda
|
20057453/01
|
Road Widening / Pipeline Damage
|
30-Jun-2026
|
-
|
Pending
|
Pipeline Damage
|
|
12
|
Barabanki
|
Megha
|
Ajaimau Water Supply Scheme
|
Ajaimau
|
20057375/01
|
Road Widening / Pipeline Damage
|
25-Jun-2026
|
-
|
Pending
|
Pipeline Damage
|
|
13
|
Barabanki
|
Megha
|
Baghauli Water Supply Scheme
|
Baghauli
|
20068982/01
|
Road Widening / Pipeline Damage
|
22-Jun-2026
|
-
|
Pending
|
Pipeline Damage
|
|
14
|
Barabanki
|
Megha
|
Vidya Nagar water Supply Scheme
|
Vidhya Nagar
|
20068948/01
|
Road Widening / Pipeline Damage
|
20-Jun-2026
|
-
|
Pending
|
Pipeline Damage
|
|
15
|
Barabanki
|
Megha
|
Bhanpur & Mohammadpur Upadhyay Water Supply Scheme
|
Bhanpur
|
20045084/01
|
Road Widening / Pipeline Damage
|
17-Jun-2026
|
-
|
Pending
|
Pipeline Damage
|
|
16
|
Barabanki
|
Megha
|
Surajpur Water Supply Scheme
|
Surajpur
|
20057324/01
|
Road Widening / Pipeline Damage
|
09-Jun-2026
|
-
|
Pending
|
Pipeline Damage
|
|
17
|
Barabanki
|
Megha
|
Khusehati Water Supply Scheme
|
Khusehari
|
20097052/01
|
Road Widening / Pipeline Damage
|
07-May-2026
|
-
|
Pending
|
Pipeline damage
|
|
18
|
Barabanki
|
Megha
|
Ariya Mau & Jadwapur Water Supply Scheme
|
Ariya Mau
|
20057381/01
|
Road Widening / Pipeline Damage
|
14-Mar-2026
|
-
|
Pending
|
Pipeline Damage
|
|
19
|
Barabanki
|
Megha
|
Aganpur Water Supply Scheme
|
Agan Pur
|
20057463/01
|
Road Widening / Pipeline Damage
|
12-Mar-2026
|
-
|
Pending
|
Pipeline Damage
|
|
20
|
Barabanki
|
Megha
|
Jalapur Water Supply Scheme
|
Jalal Pur
|
20033678/01
|
Road Widening / Pipeline Damage
|
17-Dec-2025
|
-
|
Pending
|
Pipeline Damage
|
|
21
|
Barabanki
|
Megha
|
Kadirpur Water Supply Scheme
|
Qadir Pur
|
20057413/01
|
Road Widening / Pipeline Damage
|
10-Dec-2025
|
-
|
Pending
|
Pipeline Damage
|
|
22
|
Barabanki
|
Megha
|
Suswai Water Supply Scheme
|
Suswai
|
20033729/01
|
Road Widening / Pipeline Damage
|
22-Oct-2025
|
-
|
Pending
|
Pipeline Damage
|
|
23
|
Barabanki
|
Megha
|
Belhari Kila Noharepur & tarapur Water Supply Scheme
|
Tarapur
|
20057331/01
|
Road Widening / Pipeline Damage
|
20-Apr-2025
|
-
|
Pending
|
Pipeline Damage
|
|
24
|
Barabanki
|
Megha
|
Avasar Garh Water Supply Scheme
|
Avaser Garh
|
20045134/01
|
Road Widening / Pipeline Damage
|
20-Apr-2025
|
-
|
Pending
|
Pipeline Damage
|
|
25
|
Barabanki
|
Megha
|
TRIVEDIGANJWater Supply Scheme
|
Trivediganj
|
20095021/01
|
Road Widening / Pipeline Damage
|
13-Mar-2025
|
-
|
Resolved
|
UPEIDA NOC
|
|
26
|
Barabanki
|
Megha
|
Mehraura Water supply Scheme
|
Mehaura
|
20057328/01
|
Road Widening / Pipeline Damage
|
24-Jan-2025
|
-
|
Pending
|
Pipeline Damage
|
|
27
|
Barabanki
|
Megha
|
Kusmaur Water Supply Scheme
|
Kushmar
|
20068956/01
|
Road Widening / Pipeline Damage
|
04-Jan-2025
|
-
|
Pending
|
Pipeline Damage
|
|
28
|
Barabanki
|
Megha
|
Lalganj Water Supply Scheme
|
Lalganj
|
20057336/01
|
Road Widening / Pipeline Damage
|
15-Dec-2024
|
-
|
Pending
|
Pipeline Damage
|
|
29
|
Barabanki
|
Megha
|
Sarai Shah Alam Water Supply Scheme
|
Sarayshah Alam
|
20056279/01
|
Road Widening / Pipeline Damage
|
14-Dec-2024
|
-
|
Pending
|
Pipeline Damage
|
|
30
|
Barabanki
|
Megha
|
Aliabad Water Supply Scheme
|
Aliabad
|
20055952/01
|
Road Widening / Pipeline Damage
|
12-Dec-2024
|
-
|
Pending
|
Pipeline Damage
|
|
31
|
Barabanki
|
Megha
|
Beer Kidai Water Supply Scheme
|
Beer Kidai
|
20057349/01
|
Road Widening / Pipeline Damage
|
10-Dec-2024
|
-
|
Pending
|
Pipeline Damage
|
|
32
|
Barabanki
|
Megha
|
Sisauna Water Supply Scheme
|
Sisauna
|
20057338/01
|
Road Widening / Pipeline Damage
|
20-Jun-2024
|
-
|
Pending
|
Pipeline Damage
|
|
33
|
Barabanki
|
Megha
|
Saidkhanpur Water Supply Scheme
|
Said Khan Pur
|
20097073/01
|
Road Widening / Pipeline Damage
|
12-May-2023
|
-
|
Pending
|
Pipeline Damage
|
|
34
|
Barabanki
|
PNC-SPML-JV
|
Mallawa Water Supply Scheme
|
Mallawa
|
20038701/01
|
Road Widening / Pipeline Damage
|
04-Aug-2026
|
-
|
Pending
|
Baddurpur Road To Bajgahani Road
|
|
35
|
Barabanki
|
PNC-SPML-JV
|
Bajgahami Water Supply Scheme
|
Bajgahami
|
20075521/01
|
Road Widening / Pipeline Damage
|
04-Aug-2026
|
-
|
Resolved
|
Baddurpur Road To Bajgahani Road
|
|
36
|
Barabanki
|
PNC-SPML-JV
|
Bajgahami Water Supply Scheme
|
Bajgahami
|
20075521/01
|
Road Widening / Pipeline Damage
|
04-Aug-2026
|
-
|
Pending
|
Baddurpur Road To Bajgahani Road
|
|
37
|
Barabanki
|
PNC-SPML-JV
|
Khirjhna Water Supply Scheme
|
Khinjhna
|
20059196/01
|
Road Widening / Pipeline Damage
|
04-Aug-2026
|
-
|
Pending
|
Baddurpur Road To Bajgahani Road
|
|
38
|
Barabanki
|
PNC-SPML-JV
|
Saindar Water Supply Scheme
|
Sainder
|
20038677/01
|
Road Widening / Pipeline Damage
|
04-Aug-2026
|
-
|
Pending
|
Baddurpur Road To Bajgahani Road
|
|
39
|
Barabanki
|
PNC-SPML-JV
|
Salhepur Water Supply Scheme
|
Salhepur
|
20062354/01
|
Road Widening / Pipeline Damage
|
04-Aug-2026
|
-
|
Pending
|
Baddurpur Road To Bajgahani Road
|
|
40
|
Barabanki
|
PNC-SPML-JV
|
Udapur & Bhadesia Water Supply Scheme
|
Udapur
|
20059608/01
|
Road Widening / Pipeline Damage
|
04-Aug-2026
|
-
|
Pending
|
Baddurpur Road To Bajgahani Road
|
|
41
|
Barabanki
|
PNC-SPML-JV
|
Anwari Water Supply Scheme
|
Anwari
|
20076385/01
|
Road Widening / Pipeline Damage
|
04-Aug-2026
|
-
|
Pending
|
Kursi Road To Mahamoodabad Road
|
|
42
|
Barabanki
|
PNC-SPML-JV
|
Bahrouli Water Supply Scheme
|
Bahrauli
|
20085649/01
|
Road Widening / Pipeline Damage
|
04-Aug-2026
|
-
|
Pending
|
Kursi Road To Mahamoodabad Road
|
|
43
|
Barabanki
|
PNC-SPML-JV
|
Basara Water Supply Scheme
|
Basara
|
20071580/01
|
Road Widening / Pipeline Damage
|
04-Aug-2026
|
-
|
Resolved
|
Kursi Road To Mahamoodabad Road
|
|
44
|
Barabanki
|
PNC-SPML-JV
|
Bisain Water Supply Scheme
|
Bisain
|
20041700/01
|
Road Widening / Pipeline Damage
|
04-Aug-2026
|
-
|
Resolved
|
Kursi Road To Mahamoodabad Road
|
|
45
|
Barabanki
|
PNC-SPML-JV
|
Nindoora Water Supply Scheme
|
Nindoora
|
20077142/01
|
Road Widening / Pipeline Damage
|
04-Aug-2026
|
-
|
Pending
|
Kursi Road To Mahamoodabad Road
|
|
46
|
Barabanki
|
PNC-SPML-JV
|
Katurikala Water SUpply Scheme
|
Katurikala
|
20076375/01
|
Road Widening / Pipeline Damage
|
04-Aug-2026
|
-
|
Pending
|
Kursi Road To Mahamoodabad Road
|
|
47
|
Barabanki
|
PNC-SPML-JV
|
Goraicha & Dafarpur Water Supply Scheme
|
Goraicha
|
20059843/01
|
Road Widening / Pipeline Damage
|
04-Aug-2026
|
-
|
Pending
|
Kursi Road To Mahamoodabad Road
|
|
48
|
Barabanki
|
PNC-SPML-JV
|
Goraicha & Dafarpur Water Supply Scheme
|
Jianpur
|
20059843/01
|
Road Widening / Pipeline Damage
|
04-Aug-2026
|
-
|
Pending
|
Kursi Road To Mahamoodabad Road
|
|
49
|
Barabanki
|
PNC-SPML-JV
|
Amarsanda Water Supply Scheme
|
Amarsanda
|
20041709/01
|
Road Widening / Pipeline Damage
|
04-Aug-2026
|
-
|
Pending
|
Kursi Road To Mahamoodabad Road
|
|
50
|
Barabanki
|
PNC-SPML-JV
|
Giggaur Water Supply Scheme
|
Jugaur
|
20041359/01
|
Road Widening / Pipeline Damage
|
04-Aug-2026
|
-
|
Pending
|
Kursi Road To Mahamoodabad Road
|
|
51
|
Barabanki
|
PNC-SPML-JV
|
Panihal Water Supply Scheme
|
Panihal
|
20038782/01
|
Road Widening / Pipeline Damage
|
04-Aug-2026
|
-
|
Pending
|
Harakh Jaidpur Road
|
|
52
|
Barabanki
|
PNC-SPML-JV
|
Balchhat Water Supply Scheme
|
Balchhat
|
20075516/01
|
Road Widening / Pipeline Damage
|
04-Aug-2026
|
-
|
Pending
|
Bhanmau Jaidpur Road
|
|
53
|
Barabanki
|
PNC-SPML-JV
|
Bhanmau Water Supply Scheme
|
Bhanmau
|
20062712/01
|
Road Widening / Pipeline Damage
|
04-Aug-2026
|
-
|
Pending
|
Bhanmau Jaidpur Road
|
|
54
|
Barabanki
|
PNC-SPML-JV
|
Kondari Water Supply Scheme
|
Kondari
|
20041144/01
|
Road Widening / Pipeline Damage
|
04-Aug-2026
|
-
|
Pending
|
Dewa To Saddipur Road
|
|
55
|
Barabanki
|
PNC-SPML-JV
|
Jashanwara & Mandora Water supply Scheme
|
Jashanwara
|
20059594/01
|
Road Widening / Pipeline Damage
|
04-Aug-2026
|
-
|
Pending
|
Dewa To Saddipur Road
|
|
56
|
Barabanki
|
PNC-SPML-JV
|
Pataunja Water Supply Scheme
|
Pataunja
|
20062763/01
|
Road Widening / Pipeline Damage
|
04-Aug-2026
|
-
|
Pending
|
Fatehpur -Belhara-Mahmoodabad To Chedda Pataunja Marg
|
|
57
|
Barabanki
|
PNC-SPML-JV
|
Dhakwa Water Supply Scheme
|
Dhakwa
|
20090476/01
|
Road Widening / Pipeline Damage
|
04-Aug-2026
|
-
|
Pending
|
Suratganj To Hetmapur Marg
|
|
58
|
Barabanki
|
PNC-SPML-JV
|
Sisware & Tera Khurd Water Supply Scheme
|
Siswara
|
20037939/01
|
Road Widening / Pipeline Damage
|
04-Aug-2026
|
-
|
Resolved
|
Siswara To Banbaukha ( Village Internal Road)
|
|
59
|
Barabanki
|
PNC-SPML-JV
|
Salarpur Water Supply Scheme
|
Salarpur
|
20059228/01
|
Road Widening / Pipeline Damage
|
04-Aug-2026
|
-
|
Resolved
|
Dewa To Sadruddinpur Road
|
|
60
|
Barabanki
|
PNC-SPML-JV
|
Gothia Water Supply Scheme
|
Gothia
|
20058966/01
|
Road Widening / Pipeline Damage
|
04-Aug-2026
|
-
|
Pending
|
Jaidpur Safdarganj Road
|
|
61
|
Barabanki
|
PNC-SPML-JV
|
Kola Gahbadi Water Supply Scheme
|
Kola Gah Badi
|
20062704/01
|
Road Widening / Pipeline Damage
|
04-Aug-2026
|
-
|
Pending
|
Palhari Jaidpur Road
|
|
62
|
Barabanki
|
PNC-SPML-JV
|
Daulatpur & Rahemabad Water Supply Scheme
|
Daulat Pur
|
20038686/01
|
Road Widening / Pipeline Damage
|
04-Aug-2026
|
-
|
Resolved
|
Ramsaran Verma Road
|
|
63
|
Barabanki
|
PNC-SPML-JV
|
Bhateta Water Supply Scheme
|
Bhateta
|
20040609/01
|
Road Widening / Pipeline Damage
|
24-Feb-2026
|
-
|
Resolved
|
Dewa to Barabanki road
|
|
64
|
Barabanki
|
PNC-SPML-JV
|
Karaunda Water Supply Scheme
|
Karaunda
|
20038601/01
|
Road Widening / Pipeline Damage
|
24-Feb-2026
|
-
|
Resolved
|
Dewa to Chinhat road
|
|
65
|
Barabanki
|
PNC-SPML-JV
|
Balloopur & Kyotali Water Supply Scheme
|
Balloopur
|
20059210/01
|
Road Widening / Pipeline Damage
|
24-Feb-2026
|
-
|
Resolved
|
Fatehpur to Suratganj road
|
|
66
|
Barabanki
|
PNC-SPML-JV
|
Balloopur & Kyotali Water Supply Scheme
|
Kyotali
|
20059210/01
|
Road Widening / Pipeline Damage
|
24-Feb-2026
|
-
|
Resolved
|
Fatehpur to Suratganj road
|
|
67
|
Barabanki
|
PNC-SPML-JV
|
Bhitauli khurd Water Supply Scheme
|
Kayampur
|
20037961/01
|
Road Widening / Pipeline Damage
|
20-Feb-2026
|
-
|
Resolved
|
Dewa to Kursi road
|
|
68
|
Barabanki
|
PNC-SPML-JV
|
Gangvara Water Supply Scheme
|
Kharehta
|
20041724/01
|
Road Widening / Pipeline Damage
|
20-Feb-2026
|
-
|
Resolved
|
Dewa-Kursi road
|
|
69
|
Barabanki
|
PNC-SPML-JV
|
Sipahiya Water Supply Scheme
|
Sipahiya
|
20041721/01
|
Road Widening / Pipeline Damage
|
20-Feb-2026
|
-
|
Resolved
|
Dewa-Chinhat road
|
|
70
|
Barabanki
|
PNC-SPML-JV
|
Basara Water Supply Scheme
|
Basara
|
20071580/01
|
Road Widening / Pipeline Damage
|
20-Feb-2026
|
-
|
Resolved
|
Lucknow to Mahmudabad road
|
|
71
|
Barabanki
|
PNC-SPML-JV
|
Bisain Water Supply Scheme
|
Bisain
|
20041700/01
|
Road Widening / Pipeline Damage
|
20-Feb-2026
|
-
|
Resolved
|
Lucknow to Mahmudabad road
|
|
72
|
Barabanki
|
PNC-SPML-JV
|
Ojhiapur & Dhadhara Water Supply Scheme
|
Ojhiapur
|
20059879/01
|
Road Widening / Pipeline Damage
|
20-Feb-2026
|
-
|
Resolved
|
Lucknow to Mahmudabad road
|
|
73
|
Barabanki
|
PNC-SPML-JV
|
Bada Gaon Water Supply Scheme
|
Badagaon
|
20059837/01
|
Road Widening / Pipeline Damage
|
20-Feb-2026
|
-
|
Resolved
|
Lucknow to Mahmudabad road
|
|
74
|
Barabanki
|
PNC-SPML-JV
|
BehtaKazi & Jharsawa Water Supply Scheme
|
Prempur
|
20077075/01
|
Road Widening / Pipeline Damage
|
20-Feb-2026
|
-
|
Resolved
|
Lucknow to Mahmudabad road
|
|
75
|
Barabanki
|
PNC-SPML-JV
|
Kondri Gopalpur & Baddupur Water Supply Scheme
|
Baddupur
|
20059903/01
|
Road Widening / Pipeline Damage
|
20-Feb-2026
|
-
|
Resolved
|
Lucknow to Mahmudabad road
|
|
76
|
Barabanki
|
PNC-SPML-JV
|
Tandawa nankari Water Supply Scheme
|
Bhawanipur
|
20038577/01
|
Road Widening / Pipeline Damage
|
20-Feb-2026
|
-
|
Resolved
|
Lucknow to Mahmudabad road
|
|
77
|
Barabanki
|
PNC-SPML-JV
|
Tandawa nankari Water Supply Scheme
|
Deoria
|
20038577/01
|
Road Widening / Pipeline Damage
|
20-Feb-2026
|
-
|
Resolved
|
Lucknow to Mahmudabad road
|