| 1 |
16-Oct-2026 |
Auto generate warning : Pump is not turned ON date :16-Oct-2026. |
Pending |
|
|
| 2 |
16-Oct-2026 |
Auto generate warning : Consumption of electricity data not received. |
Pending |
|
|
| 3 |
16-Oct-2026 |
Auto generate warning : CWR (CWR-01) Incomer electrical data not received. |
Pending |
|
|
| 4 |
16-Oct-2026 |
Auto generate warning : CWR (CWR-02) Incomer electrical data not received. |
Pending |
|
|
| 5 |
16-Oct-2026 |
Auto generate warning : CWR (CWR-03) Incomer electrical data not received. |
Pending |
|
|
| 6 |
16-Oct-2026 |
Auto generate warning : CWR (CWR-04) Incomer electrical data not received. |
Pending |
|
|
| 7 |
16-Oct-2026 |
Auto generate warning : CWR (CWR-01) Today flow data not received. |
Pending |
|
|
| 8 |
16-Oct-2026 |
Auto generate warning : CWR (CWR-02) Today flow data not received. |
Pending |
|
|
| 9 |
16-Oct-2026 |
Auto generate warning : CWR (CWR-01) Pump run hour data not received. |
Pending |
|
|
| 10 |
16-Oct-2026 |
Auto generate warning : CWR (CWR-02) Pump run hour data not received. |
Pending |
|
|
| 11 |
16-Oct-2026 |
Auto generate warning : OHT (ESR-11) supply is below 50% of the required daily demand. Supply is 0.00% against the expected 100%. |
Pending |
|
|
| 12 |
16-Oct-2026 |
Auto generate warning : OHT (ESR-02) supply is below 50% of the required daily demand. Supply is 0.94% against the expected 100%. |
Pending |
|
|
| 13 |
16-Oct-2026 |
Auto generate warning : OHT (ESR-08) supply is below 50% of the required daily demand. Supply is 0.00% against the expected 100%. |
Pending |
|
|
| 14 |
16-Oct-2026 |
Auto generate warning : OHT (ESR-09) supply is below 50% of the required daily demand. Supply is 0.00% against the expected 100%. |
Pending |
|
|
| 15 |
16-Oct-2026 |
Auto generate warning : OHT (ESR-05) supply is below 50% of the required daily demand. Supply is 0.00% against the expected 100%. |
Pending |
|
|
| 16 |
16-Oct-2026 |
Auto generate warning : OHT (ESR-10) supply is below 50% of the required daily demand. Supply is 4.13% against the expected 100%. |
Pending |
|
|
| 17 |
16-Oct-2026 |
Auto generate warning : OHT (ESR-01) supply is below 50% of the required daily demand. Supply is 16.98% against the expected 100%. |
Pending |
|
|
| 18 |
16-Oct-2026 |
Auto generate warning : OHT (ESR-04) supply is below 50% of the required daily demand. Supply is 0.00% against the expected 100%. |
Pending |
|
|
| 19 |
16-Oct-2026 |
Auto generate warning : OHT (ESR-06) supply is below 50% of the required daily demand. Supply is 0.00% against the expected 100%. |
Pending |
|
|
| 20 |
16-Oct-2026 |
Auto generate warning : OHT (ESR-03) supply has exceeded 150% of the required daily demand. Supply is 573.70% against the expected 100%. |
Pending |
|
|
| 21 |
16-Oct-2026 |
Auto generate warning : OHT (ESR-07) supply is below 50% of the required daily demand. Supply is 14.46% against the expected 100%. |
Pending |
|
|
| 22 |
15-Oct-2026 |
Auto generate warning : Pump is not turned ON date :15-Oct-2026. |
Pending |
|
|
| 23 |
15-Oct-2026 |
Auto generate warning : Consumption of electricity data not received. |
Pending |
|
|
| 24 |
15-Oct-2026 |
Auto generate warning : WTP clear water supply has exceeded 150% of the required clear daily demand. Supply is 164.62% against the expected 100%. |
Pending |
|
|
| 25 |
15-Oct-2026 |
Auto generate warning : CWR (CWR-01) Incomer electrical data not received. |
Pending |
|
|
| 26 |
15-Oct-2026 |
Auto generate warning : CWR (CWR-02) Incomer electrical data not received. |
Pending |
|
|
| 27 |
15-Oct-2026 |
Auto generate warning : CWR (CWR-03) Incomer electrical data not received. |
Pending |
|
|
| 28 |
15-Oct-2026 |
Auto generate warning : CWR (CWR-04) Incomer electrical data not received. |
Pending |
|
|
| 29 |
15-Oct-2026 |
Auto generate warning : CWR (CWR-01) Today flow data not received. |
Pending |
|
|
| 30 |
15-Oct-2026 |
Auto generate warning : CWR (CWR-02) Today flow data not received. |
Pending |
|
|
| 31 |
15-Oct-2026 |
Auto generate warning : CWR (CWR-01) Pump run hour data not received. |
Pending |
|
|
| 32 |
15-Oct-2026 |
Auto generate warning : CWR (CWR-02) Pump run hour data not received. |
Pending |
|
|
| 33 |
15-Oct-2026 |
Auto generate warning : OHT (ESR-02) supply is below 50% of the required daily demand. Supply is 0.14% against the expected 100%. |
Pending |
|
|
| 34 |
15-Oct-2026 |
Auto generate warning : OHT (ESR-12) supply is below 50% of the required daily demand. Supply is 7.43% against the expected 100%. |
Pending |
|
|
| 35 |
15-Oct-2026 |
Auto generate warning : OHT (ESR-09) supply is below 50% of the required daily demand. Supply is 0.00% against the expected 100%. |
Pending |
|
|
| 36 |
15-Oct-2026 |
Auto generate warning : OHT (ESR-08) supply is below 50% of the required daily demand. Supply is 41.98% against the expected 100%. |
Pending |
|
|
| 37 |
15-Oct-2026 |
Auto generate warning : OHT (ESR-05) supply is below 50% of the required daily demand. Supply is 0.00% against the expected 100%. |
Pending |
|
|
| 38 |
15-Oct-2026 |
Auto generate warning : OHT (ESR-11) supply is below 50% of the required daily demand. Supply is 0.00% against the expected 100%. |
Pending |
|
|
| 39 |
15-Oct-2026 |
Auto generate warning : OHT (ESR-03) supply has exceeded 150% of the required daily demand. Supply is 712.57% against the expected 100%. |
Pending |
|
|
| 40 |
15-Oct-2026 |
Auto generate warning : OHT (ESR-07) supply is below 50% of the required daily demand. Supply is 7.18% against the expected 100%. |
Pending |
|
|
| 41 |
15-Oct-2026 |
Auto generate warning : OHT (ESR-01) supply is below 50% of the required daily demand. Supply is 27.91% against the expected 100%. |
Pending |
|
|
| 42 |
15-Oct-2026 |
Auto generate warning : OHT (ESR-04) supply is below 50% of the required daily demand. Supply is 0.00% against the expected 100%. |
Pending |
|
|
| 43 |
15-Oct-2026 |
Auto generate warning : OHT (ESR-06) supply is below 50% of the required daily demand. Supply is 0.00% against the expected 100%. |
Pending |
|
|
| 44 |
14-Oct-2026 |
Auto generate warning : Pump is not turned ON date :14-Oct-2026. |
Pending |
|
|
| 45 |
14-Oct-2026 |
Auto generate warning : Consumption of electricity data not received. |
Pending |
|
|
| 46 |
14-Oct-2026 |
Auto generate warning : WTP clear water supply has exceeded 150% of the required clear daily demand. Supply is 160.19% against the expected 100%. |
Pending |
|
|
| 47 |
14-Oct-2026 |
Auto generate warning : CWR (CWR-01) Incomer electrical data not received. |
Pending |
|
|
| 48 |
14-Oct-2026 |
Auto generate warning : CWR (CWR-02) Incomer electrical data not received. |
Pending |
|
|
| 49 |
14-Oct-2026 |
Auto generate warning : CWR (CWR-03) Incomer electrical data not received. |
Pending |
|
|
| 50 |
14-Oct-2026 |
Auto generate warning : CWR (CWR-04) Incomer electrical data not received. |
Pending |
|
|
| 51 |
14-Oct-2026 |
Auto generate warning : CWR (CWR-01) Today flow data not received. |
Pending |
|
|
| 52 |
14-Oct-2026 |
Auto generate warning : CWR (CWR-02) Today flow data not received. |
Pending |
|
|
| 53 |
14-Oct-2026 |
Auto generate warning : CWR (CWR-01) Pump run hour data not received. |
Pending |
|
|
| 54 |
14-Oct-2026 |
Auto generate warning : CWR (CWR-02) Pump run hour data not received. |
Pending |
|
|
| 55 |
14-Oct-2026 |
Auto generate warning : OHT (ESR-02) supply is below 50% of the required daily demand. Supply is 0.03% against the expected 100%. |
Pending |
|
|
| 56 |
14-Oct-2026 |
Auto generate warning : OHT (ESR-11) supply is below 50% of the required daily demand. Supply is 0.00% against the expected 100%. |
Pending |
|
|
| 57 |
14-Oct-2026 |
Auto generate warning : OHT (ESR-09) supply is below 50% of the required daily demand. Supply is 0.00% against the expected 100%. |
Pending |
|
|
| 58 |
14-Oct-2026 |
Auto generate warning : OHT (ESR-12) supply is below 50% of the required daily demand. Supply is 16.42% against the expected 100%. |
Pending |
|
|
| 59 |
14-Oct-2026 |
Auto generate warning : OHT (ESR-03) supply has exceeded 150% of the required daily demand. Supply is 528.04% against the expected 100%. |
Pending |
|
|
| 60 |
14-Oct-2026 |
Auto generate warning : OHT (ESR-05) supply is below 50% of the required daily demand. Supply is 0.00% against the expected 100%. |
Pending |
|
|
| 61 |
14-Oct-2026 |
Auto generate warning : OHT (ESR-10) supply is below 50% of the required daily demand. Supply is 38.23% against the expected 100%. |
Pending |
|
|
| 62 |
14-Oct-2026 |
Auto generate warning : OHT (ESR-01) supply is below 50% of the required daily demand. Supply is 29.57% against the expected 100%. |
Pending |
|
|
| 63 |
14-Oct-2026 |
Auto generate warning : OHT (ESR-04) supply is below 50% of the required daily demand. Supply is 0.00% against the expected 100%. |
Pending |
|
|
| 64 |
14-Oct-2026 |
Auto generate warning : OHT (ESR-06) supply is below 50% of the required daily demand. Supply is 0.00% against the expected 100%. |
Pending |
|
|
| 65 |
13-Oct-2026 |
Auto generate warning : Pump is not turned ON date :13-Oct-2026. |
Pending |
|
|
| 66 |
13-Oct-2026 |
Auto generate warning : Consumption of electricity data not received. |
Pending |
|
|
| 67 |
13-Oct-2026 |
Auto generate warning : CWR (CWR-01) Incomer electrical data not received. |
Pending |
|
|
| 68 |
13-Oct-2026 |
Auto generate warning : CWR (CWR-02) Incomer electrical data not received. |
Pending |
|
|
| 69 |
13-Oct-2026 |
Auto generate warning : CWR (CWR-03) Incomer electrical data not received. |
Pending |
|
|
| 70 |
13-Oct-2026 |
Auto generate warning : CWR (CWR-04) Incomer electrical data not received. |
Pending |
|
|
| 71 |
13-Oct-2026 |
Auto generate warning : CWR (CWR-01) Today flow data not received. |
Pending |
|
|
| 72 |
13-Oct-2026 |
Auto generate warning : CWR (CWR-02) Today flow data not received. |
Pending |
|
|
| 73 |
13-Oct-2026 |
Auto generate warning : CWR (CWR-01) Pump run hour data not received. |
Pending |
|
|
| 74 |
13-Oct-2026 |
Auto generate warning : CWR (CWR-02) Pump run hour data not received. |
Pending |
|
|
| 75 |
13-Oct-2026 |
Auto generate warning : OHT (ESR-12) supply is below 50% of the required daily demand. Supply is 49.17% against the expected 100%. |
Pending |
|
|
| 76 |
13-Oct-2026 |
Auto generate warning : OHT (ESR-02) supply is below 50% of the required daily demand. Supply is 0.03% against the expected 100%. |
Pending |
|
|
| 77 |
13-Oct-2026 |
Auto generate warning : OHT (ESR-09) supply is below 50% of the required daily demand. Supply is 0.00% against the expected 100%. |
Pending |
|
|
| 78 |
13-Oct-2026 |
Auto generate warning : OHT (ESR-08) supply is below 50% of the required daily demand. Supply is 42.93% against the expected 100%. |
Pending |
|
|
| 79 |
13-Oct-2026 |
Auto generate warning : OHT (ESR-05) supply is below 50% of the required daily demand. Supply is 0.00% against the expected 100%. |
Pending |
|
|
| 80 |
13-Oct-2026 |
Auto generate warning : OHT (ESR-10) supply is below 50% of the required daily demand. Supply is 36.42% against the expected 100%. |
Pending |
|
|
| 81 |
13-Oct-2026 |
Auto generate warning : OHT (ESR-01) supply is below 50% of the required daily demand. Supply is 32.28% against the expected 100%. |
Pending |
|
|
| 82 |
13-Oct-2026 |
Auto generate warning : OHT (ESR-04) supply is below 50% of the required daily demand. Supply is 0.00% against the expected 100%. |
Pending |
|
|
| 83 |
13-Oct-2026 |
Auto generate warning : OHT (ESR-06) supply is below 50% of the required daily demand. Supply is 0.00% against the expected 100%. |
Pending |
|
|
| 84 |
13-Oct-2026 |
Auto generate warning : OHT (ESR-11) supply is below 50% of the required daily demand. Supply is 0.00% against the expected 100%. |
Pending |
|
|
| 85 |
13-Oct-2026 |
Auto generate warning : OHT (ESR-03) supply is below 50% of the required daily demand. Supply is 0.00% against the expected 100%. |
Pending |
|
|
| 86 |
12-Oct-2026 |
Auto generate warning : Pump is not turned ON date :12-Oct-2026. |
Pending |
|
|
| 87 |
12-Oct-2026 |
Auto generate warning : Consumption of electricity data not received. |
Pending |
|
|
| 88 |
12-Oct-2026 |
Auto generate warning : Intake raw water supply has exceeded 150% of the required daily raw demand. Supply is 173.05% against the expected 100%. |
Pending |
|
|
| 89 |
12-Oct-2026 |
Auto generate warning : WTP clear water supply has exceeded 150% of the required clear daily demand. Supply is 203.54% against the expected 100%. |
Pending |
|
|
| 90 |
12-Oct-2026 |
Auto generate warning : CWR (CWR-01) Incomer electrical data not received. |
Pending |
|
|
| 91 |
12-Oct-2026 |
Auto generate warning : CWR (CWR-02) Incomer electrical data not received. |
Pending |
|
|
| 92 |
12-Oct-2026 |
Auto generate warning : CWR (CWR-03) Incomer electrical data not received. |
Pending |
|
|
| 93 |
12-Oct-2026 |
Auto generate warning : CWR (CWR-04) Incomer electrical data not received. |
Pending |
|
|
| 94 |
12-Oct-2026 |
Auto generate warning : CWR (CWR-01) Today flow data not received. |
Pending |
|
|
| 95 |
12-Oct-2026 |
Auto generate warning : CWR (CWR-02) Today flow data not received. |
Pending |
|
|
| 96 |
12-Oct-2026 |
Auto generate warning : CWR (CWR-01) Pump run hour data not received. |
Pending |
|
|
| 97 |
12-Oct-2026 |
Auto generate warning : CWR (CWR-02) Pump run hour data not received. |
Pending |
|
|
| 98 |
12-Oct-2026 |
Auto generate warning : OHT (ESR-09) supply is below 50% of the required daily demand. Supply is 0.00% against the expected 100%. |
Pending |
|
|
| 99 |
12-Oct-2026 |
Auto generate warning : OHT (ESR-08) supply is below 50% of the required daily demand. Supply is 40.13% against the expected 100%. |
Pending |
|
|
| 100 |
12-Oct-2026 |
Auto generate warning : OHT (ESR-11) supply is below 50% of the required daily demand. Supply is 0.00% against the expected 100%. |
Pending |
|
|
| 101 |
12-Oct-2026 |
Auto generate warning : OHT (ESR-02) supply is below 50% of the required daily demand. Supply is 0.02% against the expected 100%. |
Pending |
|
|
| 102 |
12-Oct-2026 |
Auto generate warning : OHT (ESR-12) supply is below 50% of the required daily demand. Supply is 29.72% against the expected 100%. |
Pending |
|
|
| 103 |
12-Oct-2026 |
Auto generate warning : OHT (ESR-05) supply is below 50% of the required daily demand. Supply is 0.00% against the expected 100%. |
Pending |
|
|
| 104 |
12-Oct-2026 |
Auto generate warning : OHT (ESR-10) supply is below 50% of the required daily demand. Supply is 31.95% against the expected 100%. |
Pending |
|
|
| 105 |
12-Oct-2026 |
Auto generate warning : OHT (ESR-03) supply has exceeded 150% of the required daily demand. Supply is 352.37% against the expected 100%. |
Pending |
|
|
| 106 |
12-Oct-2026 |
Auto generate warning : OHT (ESR-07) supply is below 50% of the required daily demand. Supply is 9.47% against the expected 100%. |
Pending |
|
|
| 107 |
12-Oct-2026 |
Auto generate warning : OHT (ESR-01) supply is below 50% of the required daily demand. Supply is 29.57% against the expected 100%. |
Pending |
|
|
| 108 |
12-Oct-2026 |
Auto generate warning : OHT (ESR-04) supply is below 50% of the required daily demand. Supply is 0.00% against the expected 100%. |
Pending |
|
|
| 109 |
12-Oct-2026 |
Auto generate warning : OHT (ESR-06) supply is below 50% of the required daily demand. Supply is 0.00% against the expected 100%. |
Pending |
|
|
| 110 |
11-Oct-2026 |
Auto generate warning : Pump is not turned ON date :11-Oct-2026. |
Pending |
|
|
| 111 |
11-Oct-2026 |
Auto generate warning : Consumption of electricity data not received. |
Pending |
|
|
| 112 |
11-Oct-2026 |
Auto generate warning : Intake raw water supply has exceeded 150% of the required daily raw demand. Supply is 170.51% against the expected 100%. |
Pending |
|
|
| 113 |
11-Oct-2026 |
Auto generate warning : WTP clear water supply has exceeded 150% of the required clear daily demand. Supply is 200.95% against the expected 100%. |
Pending |
|
|
| 114 |
11-Oct-2026 |
Auto generate warning : CWR (CWR-01) Incomer electrical data not received. |
Pending |
|
|
| 115 |
11-Oct-2026 |
Auto generate warning : CWR (CWR-02) Incomer electrical data not received. |
Pending |
|
|
| 116 |
11-Oct-2026 |
Auto generate warning : CWR (CWR-03) Incomer electrical data not received. |
Pending |
|
|
| 117 |
11-Oct-2026 |
Auto generate warning : CWR (CWR-04) Incomer electrical data not received. |
Pending |
|
|
| 118 |
11-Oct-2026 |
Auto generate warning : CWR (CWR-01) Today flow data not received. |
Pending |
|
|
| 119 |
11-Oct-2026 |
Auto generate warning : CWR (CWR-02) Today flow data not received. |
Pending |
|
|
| 120 |
11-Oct-2026 |
Auto generate warning : CWR (CWR-01) Pump run hour data not received. |
Pending |
|
|
| 121 |
11-Oct-2026 |
Auto generate warning : CWR (CWR-02) Pump run hour data not received. |
Pending |
|
|
| 122 |
11-Oct-2026 |
Auto generate warning : OHT (ESR-02) supply is below 50% of the required daily demand. Supply is 0.05% against the expected 100%. |
Pending |
|
|
| 123 |
11-Oct-2026 |
Auto generate warning : OHT (ESR-11) supply is below 50% of the required daily demand. Supply is 0.00% against the expected 100%. |
Pending |
|
|
| 124 |
11-Oct-2026 |
Auto generate warning : OHT (ESR-05) supply is below 50% of the required daily demand. Supply is 0.00% against the expected 100%. |
Pending |
|
|
| 125 |
11-Oct-2026 |
Auto generate warning : OHT (ESR-03) supply has exceeded 150% of the required daily demand. Supply is 811.59% against the expected 100%. |
Pending |
|
|
| 126 |
11-Oct-2026 |
Auto generate warning : OHT (ESR-01) supply is below 50% of the required daily demand. Supply is 15.72% against the expected 100%. |
Pending |
|
|
| 127 |
11-Oct-2026 |
Auto generate warning : OHT (ESR-04) supply is below 50% of the required daily demand. Supply is 0.00% against the expected 100%. |
Pending |
|
|
| 128 |
11-Oct-2026 |
Auto generate warning : OHT (ESR-06) supply is below 50% of the required daily demand. Supply is 0.00% against the expected 100%. |
Pending |
|
|
| 129 |
11-Oct-2026 |
Auto generate warning : OHT (ESR-12) supply is below 50% of the required daily demand. Supply is 9.88% against the expected 100%. |
Pending |
|
|
| 130 |
11-Oct-2026 |
Auto generate warning : OHT (ESR-09) supply is below 50% of the required daily demand. Supply is 0.00% against the expected 100%. |
Pending |
|
|
| 131 |
11-Oct-2026 |
Auto generate warning : OHT (ESR-08) supply is below 50% of the required daily demand. Supply is 46.68% against the expected 100%. |
Pending |
|
|