| 1 |
8175086 |
Amawar GOV |
OHT004 |
Sonbhadra |
Duddhi |
Joru Khar |
Joru Khar |
Damage Village Internal Works |
01-Nov-2025 |
15-Mar-2025 |
Damage to DI 250mm K9 Pipeline (Jorukhar Zone) Approximately 12 meters of DI 250mm K9 pipeline (Chainage: Jampani to Jorukhar) laid in Jorukhar Village has been severely damaged due to excavation activities undertaken by the Irrigation Department for canal construction along the same alignment. Multiple sections have been disturbed, with pipes displaced or discarded. Based on inspection, the damage is attributable to the bucket teeth of backhoe/excavators deployed during excavation. |
| 2 |
8175086 |
Amawar GOV |
OHT001 |
Sonbhadra |
Duddhi |
Amawar |
Amawar |
Damage Village Internal Works |
05-Sep-2025 |
15-Mar-2026 |
Damage to DI 350mm K9 Rising Main (WTP to Bagharu GLR-02) Further, the Rising Main line of DI 350mm K9 from WTP to Bagharu GLR-02 has been significantly damaged due to excavation activities executed by the UPPCL Department for pole erection. The contractor engaged by UPPCL carried out drilling without prior intimation or approval, thereby violating standard coordination protocols. The contractor has refused to undertake repairs, which is unacceptable. |
| 3 |
8175086 |
Amawar GOV |
OHT005 |
Sonbhadra |
Duddhi |
Jam Pani |
Jam Pani |
Damage Village Internal Works |
02-Feb-2026 |
15-Mar-2026 |
Damage to DI 450mm K9 Raising Main Further, the Raising Main line of DI 450mm K9 (WTP to GLR-1) Jampani Pump House has been severely damaged due to excavation activities undertaken by the Irrigation Department for canal construction along the same alignment. Multiple sections have been disturbed, with pipes displaced or discarded. Based on inspection, the damage is attributable to the bucket teeth of backhoe/excavators deployed during excavation. |
| 4 |
8175086 |
Amawar GOV |
OHT005 |
Sonbhadra |
Duddhi |
Pakari |
Pakari |
Damage Village Internal Works |
13-Feb-2026 |
15-Mar-2026 |
Damage to DI 200mm K7 Node No.(AV 09-AV10) Distribution Main Further, the Distribution line of DI 200mm K-7 to Jampani Distribution (Pakari) Village has been severely damaged due to excavation activities undertaken by the Irrigation Department for canal construction along the same alignment. Multiple sections have been disturbed, with pipes displaced or discarded. Based on inspection, the damage is attributable to the bucket teeth of backhoe/excavators deployed during excavation |