Regular Water Supply Issues Kuraicha GOV (8010037)

Sr No. Scheme Code Scheme Name OHT Code District Block Panchayat Village Issue Type Issue Date Expected Issue Resolve Date Remark
1 8010037 Kuraicha GOV 009 Jhansi Bangra Arjar Arjar Road Widening[PWD] 12-Jan-2024 PWD has damaged the pipeline, and the issue has remained unresolved for the last 2.5 years. After the intervention of the ACS Sir, a joint meeting of both departments was conducted by the DM, Jhansi. Thereafter, a joint site inspection was carried out by the Chief Engineer (CE), UPJN, and CE, PWD. It was mutually agreed that the pipeline-laying work would be carried out by PWD under the supervision of UPJN and the firm. Accordingly, PWD started the work on 01.05.2026. However, the work was stopped due to the rainy season and was not resumed thereafter. Following the intervention of the MD sir - UPJN (R), the DM - Jhansi, convened a meeting with both departments, and the work was resumed on 01.09.2026. The work is currently in progress. The completion date will be finalized during the meeting convened by the DM, Jhansi, on 23.09.2026.
2 8010037 Kuraicha GOV 009 Jhansi Bangra Arjar Rampura Road Widening[PWD] 16-Jan-2024 PWD has damaged the pipeline, and the issue has remained unresolved for the last 2.5 years. After the intervention of the ACS Sir, a joint meeting of both departments was conducted by the DM, Jhansi. Thereafter, a joint site inspection was carried out by the Chief Engineer (CE), UPJN, and CE, PWD. It was mutually agreed that the pipeline-laying work would be carried out by PWD under the supervision of UPJN and the firm. Accordingly, PWD started the work on 01.05.2026. However, the work was stopped due to the rainy season and was not resumed thereafter. Following the intervention of the MD sir - UPJN (R), the DM - Jhansi, convened a meeting with both departments, and the work was resumed on 01.09.2026. Water supply has been started partially and the work is currently in progress. The completion date will be finalized during the meeting convened by the DM, Jhansi, on 23.09.2026.
3 8010037 Kuraicha GOV 009 Jhansi Bangra Ninaura Ninaura Road Widening[PWD] 10-Jan-2024 PWD has damaged the pipeline, and the issue has remained unresolved for the last 2.5 years. After the intervention of the ACS Sir, a joint meeting of both departments was conducted by the DM, Jhansi. Thereafter, a joint site inspection was carried out by the Chief Engineer (CE), UPJN, and CE, PWD. It was mutually agreed that the pipeline-laying work would be carried out by PWD under the supervision of UPJN and the firm. Accordingly, PWD started the work on 01.05.2026. However, the work was stopped due to the rainy season and was not resumed thereafter. Following the intervention of the MD sir - UPJN (R), the DM - Jhansi, convened a meeting with both departments, and the work was resumed on 01.09.2026. Repair woks will be started in this village after completion of works at Arjar & Rampura Villages The completion date will be finalized during the meeting convened by the DM, Jhansi, on 23.09.2026.
4 8010037 Kuraicha GOV 009 Jhansi Bangra Arjar Rampura Road Widening[PWD] 05-Oct-2026 The damaged pipeline in Village Rampura has been repaired by the PWD, and water supply has been restored to 36 FHTCs. After completing the interconnection work of the village branch pipeline, 100% water supply can be ensured in the village. However, the PWD has stopped the work since 20 September, due to which the interconnection work of the branch pipeline remains pending and 100% water supply in the village could not be started.