Follow us on for latest updates.    |    To Lodge Complaint Call On 18001212164   or   visit   www.jalsamadhan.in

Regular Water Supply Supply Disruptions

Sr No. Scheme Code Scheme Name District Block Panchayat Village Code Village Issue Type Issue Date Expected Issue Resolve Date Remark
1 8010037 Kuraicha GOV Jhansi Bangra Bijaigarh 424200 Bagroni Jagir Theft 01-Aug-2025 Scada Instrument Panel Inverter & Battery Theft on 31-07-2025
2 8010037 Kuraicha GOV Jhansi Bangra Imilia 424211 Imilia Theft 01-Aug-2025 Scada Instrument Panel Inverter & Battery Theft on 31-07-2025
3 8010037 Kuraicha GOV Jhansi Bangra Charhrau Dhawari 424212 Satpura Theft 01-Aug-2025 Scada Instrument Panel Inverter & Battery Theft on 31-07-2025
4 8010037 Kuraicha GOV Jhansi Bangra Sanaura 424242 Amanpura Theft 01-Aug-2025 Scada Instrument Panel Inverter & Battery Theft on 31-07-2025
5 8010037 Kuraicha GOV Jhansi Bangra Sanaura 424243 Bar Urf Rampur Theft 01-Aug-2025 Scada Instrument Panel Inverter & Battery Theft on 31-07-2025
6 8010037 Kuraicha GOV Jhansi Bangra Arjar 424227 Rampura Road Widening[PWD] 01-Jul-2026 PWD Repairing work stopped due to rainy season.
7 8010037 Kuraicha GOV Jhansi Bangra Arjar 424227 Rampura Road Widening[PWD] 01-Jul-2026 PWD has damaged the pipeline from last 2.5 years. Work started on 01-05-2026 due to the intervention of ACS sir and DM Jhansi. However the same has been stopped due to rainy season.
8 8010037 Kuraicha GOV Jhansi Bangra Arjar 424226 Arjar Road Widening[PWD] 01-Jul-2026 PWD Repairing work stopped due to rainy season
9 8010037 Kuraicha GOV Jhansi Bangra Arjar 424226 Arjar Road Widening[PWD] 01-Jul-2026 PWD has damaged the pipeline from last 2.5 years. Work started on 01-05-2026 due to the intervention of ACS sir and DM Jhansi. However the same has been stopped due to rainy season.
10 8010037 Kuraicha GOV Jhansi Bangra Ninaura 424230 Ninaura Road Widening[PWD] 01-Jul-2026 PWD has damaged the pipeline from last 2.5 years. Work started on 01-05-2026 due to the intervention of ACS sir and DM Jhansi. However the same has been stopped due to rainy season.
11 8010037 Kuraicha GOV Jhansi Bangra Arjar 424226 Arjar Road Widening[PWD] 01-May-2026 PWD has damaged the pipeline from last 2.5 years. As per the instruction of ACS sir, joint meeting was conducted by DM Jhansi. There after joint site inspection was conducted by CE- UPJN and CE- PWD and there after work has been started by PWD.
12 8010037 Kuraicha GOV Jhansi Bangra Arjar 424226 Arjar Road Widening[PWD] 01-May-2026 PWD has started attending repairs after intervention of DM Jhansi
13 8010037 Kuraicha GOV Jhansi Bangra Arjar 424227 Rampura Road Widening[PWD] 01-May-2026 PWD has started attending repairs after intervention of DM Jhansi
14 8010037 Kuraicha GOV Jhansi Bangra Arjar 424227 Rampura Road Widening[PWD] 01-May-2026 PWD has damaged the pipeline from last 2.5 years. As per the instruction of ACS sir, joint meeting was conducted by DM Jhansi. There after joint site inspection was conducted by CE- UPJN and CE- PWD and there after work has been started by PWD.
15 8010037 Kuraicha GOV Jhansi Bangra Ninaura 424230 Ninaura Road Widening[PWD] 01-May-2026 PWD has damaged the pipeline from last 2.5 years. As per the instruction of ACS sir, joint meeting was conducted by DM Jhansi. There after joint site inspection was conducted by CE- UPJN and CE- PWD and there after work has been started by PWD at Arjar and Rampura. Work at Ninaura will be started after completion of above two villages.
16 8010037 Kuraicha GOV Jhansi Bangra Arjar 424227 Rampura Road Widening[PWD] 05-Oct-2026 The damaged pipeline in Village Rampura has been repaired by the PWD, and water supply has been restored to 36 FHTCs. After completing the interconnection work of the village branch pipeline, 100% water supply can be ensured in the village. However, the PWD has stopped the work since 20 September, due to which the interconnection work of the branch pipeline remains pending and 100% water supply in the village could not be started.
17 8010037 Kuraicha GOV Jhansi Bangra Ninaura 424230 Ninaura Road Widening[PWD] 10-Jan-2024 PWD has damaged the pipeline from last 2.5 years. As per the instruction of ACS sir, joint meeting was conducted by DM Jhansi. There after joint site inspection was conducted by CE- UPJN and CE- PWD and there after work has been started by PWD on 01-05-2026. However the work has been stopped due to rainy season for two months. Due to the intervention of MD-UPJN and DM Jhansi on 01-09-2026. Work at Ninaura will be started after completion of water supply to Arjar & Rampura. The completion date will be finalised during the meeting called by DM Jhansi on 23-09-2026.
18 8010037 Kuraicha GOV Jhansi Bangra Ninaura 424230 Ninaura Road Widening[PWD] 10-Jan-2024 PWD has damaged the pipeline from last 2.5 years. As per the instruction of ACS sir, joint meeting was conducted by DM Jhansi. There after joint site inspection was conducted by CE- UPJN and CE- PWD and there after work has been started by PWD on 01-05-2026. However the work has been stopped due to rainy season for two months. Due to the intervention of MD-UPJN and DM Jhansi on 01-09-2026 work at Arjar & Rampura started. Work at Ninaura will be started after completion of water supply to above two villages. The completion date will be finalised during the meeting called by DM Jhansi on 23-09-2026.
19 8010037 Kuraicha GOV Jhansi Bangra Ninaura 424230 Ninaura Road Widening[PWD] 10-Jan-2024 PWD has damaged the pipeline, and the issue has remained unresolved for the last 2.5 years. After the intervention of the ACS Sir, a joint meeting of both departments was conducted by the DM, Jhansi. Thereafter, a joint site inspection was carried out by the Chief Engineer (CE), UPJN, and CE, PWD. It was mutually agreed that the pipeline-laying work would be carried out by PWD under the supervision of UPJN and the firm. Accordingly, PWD started the work on 01.05.2026. However, the work was stopped due to the rainy season and was not resumed thereafter. Following the intervention of the MD sir - UPJN (R), the DM - Jhansi, convened a meeting with both departments, and the work was resumed on 01.09.2026. Repair woks will be started in this village after completion of works at Arjar & Rampura Villages The completion date will be finalized during the meeting convened by the DM, Jhansi, on 23.09.2026.
20 8010037 Kuraicha GOV Jhansi Bangra Ninaura 424230 Ninaura Road Widening[PWD] 10-Jan-2024 31-Oct-2026 PWD has damaged the pipeline, and the issue has remained unresolved for the last 2.5 years. After the intervention of the ACS Sir, a joint meeting of both departments was conducted by the DM, Jhansi. Thereafter, a joint site inspection was carried out by the Chief Engineer (CE), UPJN, and CE, PWD. It was mutually agreed that the pipeline-laying work would be carried out by PWD under the supervision of UPJN and the firm. Accordingly, PWD started the work on 01.05.2026. However, the work was stopped due to the rainy season and was not resumed thereafter. Following the intervention of the MD sir - UPJN (R), the DM - Jhansi, convened a meeting with both departments, and the work was resumed on 01.09.2026. The work is currently in progress. The completion date will be finalized during the meeting convened by the DM, Jhansi, on 23.09.2026.In this meeting DM has directed to PWD remaining works would be completed as soon as possible.In complaince PWD stated that the remaining works will take 1 month for complaince .
21 8010037 Kuraicha GOV Jhansi Bangra Ninaura 424230 Ninaura Road Widening[PWD] 10-Jan-2024 1. PWD has damaged the pipe line during road widening in 2024. and the issue has remained unresolved. 2. After the intervention of the ACS Sir, a joint meeting of both departments was conducted by the DM, Jhansi. 3. Thereafter, a joint site inspection was carried out by the Chief Engineer (CE), UPJN, and CE, PWD. 4. It was mutually agreed that the pipeline-laying work would be carried out by PWD under the supervision of UPJN and the firm. 5. Accordingly, PWD started the work on 01.05.2026. 6. The work was stopped due to the rainy season and was not resumed thereafter. 7. Following the intervention of the MD sir - UPJN (R), the DM - Jhansi, convened a meeting with both departments, and the work was resumed on 01.09.2026. But, once again stopped by PWD from 20.09.2026. 8. In the meeting convened by the DM, Jhansi, on 23.09.2026, DM directed PWD to complete remaining works immediately. PWD stated that the remaining works will be completed by 15.10.2026. 9. However, thereafter, the work has not been resumed and no work is in progress at present.
22 8010037 Kuraicha GOV Jhansi Bangra Ninaura 424230 Ninaura Road Widening[PWD] 10-Jan-2024

The pipeline work in Village Ninaura remains incomplete, resulting in the non-restoration of the full water supply to the village.


Key Details and Timeline

2024: The Public Works Department (PWD) damaged the pipeline during road-widening work.

May 1, 2026: The PWD commenced repair work under the supervision of UPJN but subsequently stopped the work due to the rainy season.

September 1, 2026: Work resumed following the intervention of the District Magistrate (DM), Jhansi. However, the PWD stopped the work again on September 20, 2026.

September 23, 2026: The DM directed the PWD to complete the work immediately, and the PWD assured completion by October 15, 2026.

Current Status (as of October 16, 2026)

The 150 mm diameter pipeline gap-closing work between Rampura and Arjar villages remains incomplete. The pending pipeline connection is essential to ensure that water reaches Village Ninaura and to restore the full water supply. Despite the assurance given by the PWD, the stipulated completion date of October 15, 2026, has passed, and no work is currently in progress at the site.

23 8010037 Kuraicha GOV Jhansi Bangra Ninaura 424230 Ninaura Road Widening[PWD] 10-Jan-2024

The pipeline work in Village Ninaura remains incomplete, resulting in the non-restoration of the full water supply to the village.Key Details and Timeline2024: The Public Works Department (PWD) damaged the pipeline during road-widening work.May 1, 2026: The PWD commenced repair work under the supervision of UPJN but subsequently stopped the work due to the rainy season.September 1, 2026: Work resumed following the intervention of the District Magistrate (DM), Jhansi. However, the PWD stopped the work again on September 20, 2026.September 23, 2026: The DM directed the PWD to complete the work immediately, and the PWD assured completion by October 15, 2026.Current Status (as of October 16, 2026)The 150 mm diameter pipeline gap-closing work between Rampura and Arjar villages remains incomplete. The pending pipeline connection is essential to ensure that water reaches Village Ninaura and to restore the full water supply. Despite the assurance given by the PWD, the stipulated completion date of October 15, 2026, has passed, and no work is currently in progress at the site.


24 8010037 Kuraicha GOV Jhansi Bangra Ninaura 424230 Ninaura Road Widening[PWD] 10-Jan-2024

The pipeline work in Village Ninaura remains incomplete, resulting in the non-restoration of the full water supply to the village.Key Details and Timeline2024: The Public Works Department (PWD) damaged the pipeline during road-widening work.May 1, 2026: The PWD commenced repair work under the supervision of UPJN but subsequently stopped the work due to the rainy season.September 1, 2026: Work resumed following the intervention of the District Magistrate (DM), Jhansi. However, the PWD stopped the work again on September 20, 2026.September 23, 2026: The DM directed the PWD to complete the work immediately, and the PWD assured completion by October 15, 2026.Current Status (as of October 16, 2026)The 150 mm diameter pipeline gap-closing work between Rampura and Arjar villages remains incomplete. The pending pipeline connection is essential to ensure that water reaches Village Ninaura and to restore the full water supply. Despite the assurance given by the PWD, the stipulated completion date of October 15, 2026, has passed, and no work is currently in progress at the site.

25 8010037 Kuraicha GOV Jhansi Bangra Ninaura 424230 Ninaura Road Widening[PWD] 10-Jan-2024

The pipeline work in Village Ninaura remains incomplete, resulting in the non-restoration of the full water supply to the village.Key Details and Timeline2024: The Public Works Department (PWD) damaged the pipeline during road-widening work.May 1, 2026: The PWD commenced repair work under the supervision of UPJN but subsequently stopped the work due to the rainy season.September 1, 2026: Work resumed following the intervention of the District Magistrate (DM), Jhansi. However, the PWD stopped the work again on September 20, 2026.September 23, 2026: The DM directed the PWD to complete the work immediately, and the PWD assured completion by October 15, 2026.Current Status (as of October 16, 2026)The 150 mm diameter pipeline gap-closing work between Rampura and Arjar villages remains incomplete. The pending pipeline connection is essential to ensure that water reaches Village Ninaura and to restore the full water supply. Despite the assurance given by the PWD, the stipulated completion date of October 15, 2026, has passed, and no work is currently in progress at the site.

26 8010037 Kuraicha GOV Jhansi Bangra Ninaura 424230 Ninaura Road Widening[PWD] 10-Jan-2024

The pipeline was damaged by the PWD during road-widening work in 2024. Despite repair work commencing on 01.05.2026 and the DM, Jhansi’s directions dated 23.09.2026 to complete the work by 15.10.2026, the 150 mm dia. pipeline gap-closing work between Rampura and Arjar remains incomplete. Work has been stopped since 20.09.2026, and the full water supply to Village Ninaura has not been restored.

27 8010037 Kuraicha GOV Jhansi Bangra Ninaura 424230 Ninaura Road Widening[PWD] 10-Jan-2024 Pwd has damaged the pipeline from last 1.5 years and still not repaired it till now.
28 8010037 Kuraicha GOV Jhansi Bangra Arjar 424226 Arjar Road Widening[PWD] 12-Jan-2024 Pwd has damaged the pipeline from last 1.5 years and not repaired it till now.
29 8010037 Kuraicha GOV Jhansi Bangra Arjar 424226 Arjar Road Widening[PWD] 12-Jan-2024 PWD has damaged the pipeline from last 2.5 years. As per the instruction of ACS sir, joint meeting was conducted by DM Jhansi. There after joint site inspection was conducted by CE- UPJN and CE- PWD and there after work has been started by PWD on 01-05-2026. However, the work has been stopped due to rainy season for two months. Due to the intervention of MD-UPJN and DM Jhansi on 01-09-2026 work re-started. The completion date will be finalised during the meeting called by DM Jhansi on 23-09-2026.
30 8010037 Kuraicha GOV Jhansi Bangra Arjar 424226 Arjar Road Widening[PWD] 12-Jan-2024 PWD has damaged the pipeline, and the issue has remained unresolved for the last 2.5 years. After the intervention of the ACS Sir, a joint meeting of both departments was conducted by the DM, Jhansi. Thereafter, a joint site inspection was carried out by the Chief Engineer (CE), UPJN, and CE, PWD. It was mutually agreed that the pipeline-laying work would be carried out by PWD under the supervision of UPJN and the firm. Accordingly, PWD started the work on 01.05.2026. However, the work was stopped due to the rainy season and was not resumed thereafter. Following the intervention of the MD sir - UPJN (R), the DM - Jhansi, convened a meeting with both departments, and the work was resumed on 01.09.2026. The work is currently in progress. The completion date will be finalized during the meeting convened by the DM, Jhansi, on 23.09.2026.
31 8010037 Kuraicha GOV Jhansi Bangra Arjar 424226 Arjar Road Widening[PWD] 12-Jan-2024 31-Oct-2026 PWD has damaged the pipeline, and the issue has remained unresolved for the last 2.5 years. After the intervention of the ACS Sir, a joint meeting of both departments was conducted by the DM, Jhansi. Thereafter, a joint site inspection was carried out by the Chief Engineer (CE), UPJN, and CE, PWD. It was mutually agreed that the pipeline-laying work would be carried out by PWD under the supervision of UPJN and the firm. Accordingly, PWD started the work on 01.05.2026. However, the work was stopped due to the rainy season and was not resumed thereafter. Following the intervention of the MD sir - UPJN (R), the DM - Jhansi, convened a meeting with both departments, and the work was resumed on 01.09.2026. The work is currently in progress. The completion date will be finalized during the meeting convened by the DM, Jhansi, on 23.09.2026.In this meeting DM has directed to PWD remaining works would be completed as soon as possible.In complaince PWD stated that the remaining works will take 1 month for complaince .
32 8010037 Kuraicha GOV Jhansi Bangra Arjar 424226 Arjar Road Widening[PWD] 12-Jan-2024 1. PWD has damaged the pipe line during road widening in 2024. and the issue has remained unresolved. 2. After the intervention of the ACS Sir, a joint meeting of both departments was conducted by the DM, Jhansi. 3. Thereafter, a joint site inspection was carried out by the Chief Engineer (CE), UPJN, and CE, PWD. 4. It was mutually agreed that the pipeline-laying work would be carried out by PWD under the supervision of UPJN and the firm. 5. Accordingly, PWD started the work on 01.05.2026. 6. The work was stopped due to the rainy season and was not resumed thereafter. 7. Following the intervention of the MD sir - UPJN (R), the DM - Jhansi, convened a meeting with both departments, and the work was resumed on 01.09.2026. But, once again stopped by PWD from 20.09.2026. 8. In the meeting convened by the DM, Jhansi, on 23.09.2026, DM directed PWD to complete remaining works immediately. PWD stated that the remaining works will be completed by 15.10.2026. 9. However, thereafter, the work has not been resumed and no work is in progress at present.
33 8010037 Kuraicha GOV Jhansi Bangra Arjar 424226 Arjar Road Widening[PWD] 12-Jan-2024

The pipeline repair work in Village Arjar remains incomplete, resulting in the continued disruption of the full water supply to the village and causing inconvenience to the residents.


Key Details and Timeline


2024: The Public Works Department (PWD) damaged the pipeline during road-widening work.


May 1, 2026: The PWD commenced repair work under the supervision of UPJN but subsequently stopped the work due to the rainy season.


September 1, 2026: Work resumed following the intervention of the District Magistrate (DM), Jhansi. However, the PWD stopped the work again on September 20, 2026.


September 23, 2026: The DM directed the PWD to complete the work immediately, and the PWD assured completion by October 15, 2026.


Current Status (as of October 16, 2026)


Approximately 600 metres of 150 mm DI pipeline, 2,000 metres of 50 mm GI pipeline, and the required interconnections remain incomplete. The water supply to the village has not been restored.


Despite the assurance given by the PWD to complete the work by October 15, 2026, the stipulated deadline has expired, and no repair work is currently in progress at the site

34 8010037 Kuraicha GOV Jhansi Bangra Arjar 424226 Arjar Road Widening[PWD] 12-Jan-2024

The pipeline repair work in Village Arjar remains incomplete, resulting in the continued disruption of the full water supply to the village and causing inconvenience to the residents.Key Details and Timeline2024: The Public Works Department (PWD) damaged the pipeline during road-widening work.May 1, 2026: The PWD commenced repair work under the supervision of UPJN but subsequently stopped the work due to the rainy season.September 1, 2026: Work resumed following the intervention of the District Magistrate (DM), Jhansi. However, the PWD stopped the work again on September 20, 2026.September 23, 2026: The DM directed the PWD to complete the work immediately, and the PWD assured completion by October 15, 2026.Current Status (as of October 16, 2026).Approximately 600 metres of 150 mm DI pipeline, 2,000 metres of 50 mm GI pipeline, and the required interconnections remain incomplete. The water supply to the village has not been restored.Despite the assurance given by the PWD to complete the work by October 15, 2026, the stipulated deadline has expired, and no repair work is currently in progress at the site.


35 8010037 Kuraicha GOV Jhansi Bangra Arjar 424226 Arjar Road Widening[PWD] 12-Jan-2024

The pipeline repair work in Village Arjar remains incomplete, resulting in the continued disruption of the full water supply to the village and causing inconvenience to the residents.Key Details and Timeline2024: The Public Works Department (PWD) damaged the pipeline during road-widening work.May 1, 2026: The PWD commenced repair work under the supervision of UPJN but subsequently stopped the work due to the rainy season.September 1, 2026: Work resumed following the intervention of the District Magistrate (DM), Jhansi. However, the PWD stopped the work again on September 20, 2026.September 23, 2026: The DM directed the PWD to complete the work immediately, and the PWD assured completion by October 15, 2026.Current Status (as of October 16, 2026).Approximately 600 metres of 150 mm DI pipeline, 2,000 metres of 50 mm GI pipeline, and the required interconnections remain incomplete. The water supply to the village has not been restored. Despite the assurance given by the PWD to complete the work by October 15, 2026, the stipulated deadline has expired, and no repair work is currently in progress at the site.

36 8010037 Kuraicha GOV Jhansi Bangra Arjar 424226 Arjar Road Widening[PWD] 12-Jan-2024

The pipeline repair work in Village Arjar remains incomplete, resulting in the continued disruption of the full water supply to the village and causing inconvenience to the residents.Key Details and Timeline2024: The Public Works Department (PWD) damaged the pipeline during road-widening work.May 1, 2026: The PWD commenced repair work under the supervision of UPJN but subsequently stopped the work due to the rainy season.September 1, 2026: Work resumed following the intervention of the District Magistrate (DM), Jhansi. However, the PWD stopped the work again on September 20, 2026.September 23, 2026: The DM directed the PWD to complete the work immediately, and the PWD assured completion by October 15, 2026.Current Status (as of October 16, 2026).Approximately 600 metres of 150 mm DI pipeline, 2,000 metres of 50 mm GI pipeline, and the required interconnections remain incomplete. The water supply to the village has not been restored. Despite the assurance given by the PWD to complete the work by October 15, 2026, the stipulated deadline has expired, and no repair work is currently in progress at the site.

37 8010037 Kuraicha GOV Jhansi Bangra Arjar 424226 Arjar Road Widening[PWD] 12-Jan-2024

PWD damaged the pipeline during road widening in 2024. Despite work commencing on 01.05.2026 and the DM, Jhansi’s direction dated 23.09.2026 to complete it by 15.10.2026, the work remains incomplete and has stopped again. Approximately 600 m of 150 mm DI pipeline, 2,000 m of 50 mm GI pipeline, and interconnections are pending

38 8010037 Kuraicha GOV Jhansi Bangra Arjar 424227 Rampura Road Widening[PWD] 16-Jan-2024 Pwd has damaged the pipeline from last 1.5 years and not repaired it till now
39 8010037 Kuraicha GOV Jhansi Bangra Arjar 424227 Rampura Road Widening[PWD] 16-Jan-2024 31-Oct-2026 PWD has damaged the pipeline, and the issue has remained unresolved for the last 2.5 years. After the intervention of the ACS Sir, a joint meeting of both departments was conducted by the DM, Jhansi. Thereafter, a joint site inspection was carried out by the Chief Engineer (CE), UPJN, and CE, PWD. It was mutually agreed that the pipeline-laying work would be carried out by PWD under the supervision of UPJN and the firm. Accordingly, PWD started the work on 01.05.2026. However, the work was stopped due to the rainy season and was not resumed thereafter. Following the intervention of the MD sir - UPJN (R), the DM - Jhansi, convened a meeting with both departments, and the work was resumed on 01.09.2026. The work is currently in progress. The completion date will be finalized during the meeting convened by the DM, Jhansi, on 23.09.2026.In this meeting DM has directed to PWD remaining works would be completed as soon as possible.In complaince PWD stated that the remaining works will take 1 month for complaince ..During site visit it is observe that the damaged pipeline in Village Rampura has been repaired by the PWD. 3 inter connection are left due to which 0nly partially water supply are resume.If this inter connection has been made than will get proper water supply in complete village. However, the PWD has stopped the work since 20 September, due to which the interconnection work of the branch pipeline remains pending and 100% water supply in the village could not be started.
40 8010037 Kuraicha GOV Jhansi Bangra Arjar 424227 Rampura Road Widening[PWD] 16-Jan-2024
  1. PWD has damaged the pipe line during road widening in 2024. and the issue has remained unresolved. 
  2. After the intervention of the ACS Sir, a joint meeting of both departments was conducted by the DM, Jhansi. 
  3. Thereafter, a joint site inspection was carried out by the Chief Engineer (CE), UPJN, and CE, PWD. 
  4. It was mutually agreed that the pipeline-laying work would be carried out by PWD under the supervision of UPJN and the firm. 
  5. Accordingly, PWD started the work on 01.05.2026. 
  6. The work was stopped due to the rainy season and was not resumed thereafter. 
  7. Following the intervention of the MD sir - UPJN (R), the DM - Jhansi, convened a meeting with both departments, and the work was resumed on 01.09.2026. But, once again    stopped by PWD from 20.09.2026.
  8. During site visit it is observed that the damaged pipeline in Village Rampura has been repaired by the PWD. 
  9. Three inter connections are left due to which 0nly partial water supply was resumed. Water supply in entire village can be resumed once the interconnections are made. 
  10. However, the PWD has stopped the work since 20 September, due to which the interconnection work of the branch pipeline remains pending and 100% water supply in the village could not be restored.
  11. In the meeting convened by the DM, Jhansi, on 23.09.2026, DM directed PWD to complete remaining works immediately. PWD stated that the remaining works will be completed by 15.10.2026.
  12. However, thereafter, the work has not been resumed and no work is in progress at present.
41 8010037 Kuraicha GOV Jhansi Bangra Arjar 424227 Rampura Road Widening[PWD] 16-Jan-2024

The pipeline work in Village Rampura remains incomplete, and only a partial water supply has been restored due to the stoppage of work by the Public Works Department (PWD).


Key Details and Timeline


2024: The PWD damaged the pipeline during road-widening work.


May 1, 2026: The PWD commenced repair work under the supervision of UPJN but stopped the work due to the rainy season.


September 1, 2026: Work resumed following the intervention of the District Magistrate (DM), Jhansi. However, the PWD stopped the work again on September 20, 2026.


September 23, 2026: The DM directed the PWD to complete the work immediately, and the PWD assured completion by October 15, 2026.


Current Status: Three critical interconnections are still pending, preventing the restoration of the full water supply. No work is currently in progress at the site.

42 8010037 Kuraicha GOV Jhansi Bangra Arjar 424227 Rampura Road Widening[PWD] 16-Jan-2024

The pipeline work in Village Rampura remains incomplete, and only a partial water supply has been restored due to the stoppage of work by the Public Works Department (PWD).Key Details and Timeline.2024: The PWD damaged the pipeline during road-widening work.May 1, 2026: The PWD commenced repair work under the supervision of UPJN but stopped the work due to the rainy season.September 1, 2026: Work resumed following the intervention of the District Magistrate (DM), Jhansi. However, the PWD stopped the work again on September 20, 2026.September 23, 2026: The DM directed the PWD to complete the work immediately, and the PWD assured completion by October 15, 2026.Current Status: Three critical interconnections are still pending, preventing the restoration of the full water supply. No work is currently in progress at the site.


43 8010037 Kuraicha GOV Jhansi Bangra Arjar 424227 Rampura Road Widening[PWD] 16-Jan-2024

The pipeline work in Village Rampura remains incomplete, and only a partial water supply has been restored due to the stoppage of work by the Public Works Department (PWD).Key Details and Timeline.2024: The PWD damaged the pipeline during road-widening work.May 1, 2026: The PWD commenced repair work under the supervision of UPJN but stopped the work due to the rainy season.September 1, 2026: Work resumed following the intervention of the District Magistrate (DM), Jhansi. However, the PWD stopped the work again on September 20, 2026.September 23, 2026: The DM directed the PWD to complete the work immediately, and the PWD assured completion by October 15, 2026.Current Status: Three critical interconnections are still pending, preventing the restoration of the full water supply. No work is currently in progress at the site.

44 8010037 Kuraicha GOV Jhansi Bangra Arjar 424227 Rampura Road Widening[PWD] 16-Jan-2024

The pipeline work in Village Rampura remains incomplete, and only a partial water supply has been restored due to the stoppage of work by the Public Works Department (PWD).Key Details and Timeline.2024: The PWD damaged the pipeline during road-widening work.May 1, 2026: The PWD commenced repair work under the supervision of UPJN but stopped the work due to the rainy season.September 1, 2026: Work resumed following the intervention of the District Magistrate (DM), Jhansi. However, the PWD stopped the work again on September 20, 2026.September 23, 2026: The DM directed the PWD to complete the work immediately, and the PWD assured completion by October 15, 2026.Current Status: Three critical interconnections are still pending, preventing the restoration of the full water supply. No work is currently in progress at the site.

45 8010037 Kuraicha GOV Jhansi Bangra Arjar 424227 Rampura Road Widening[PWD] 16-Jan-2024

The PWD damaged the pipeline during road-widening work in 2024. Despite resuming repairs on 01.09.2026 following the DM’s intervention and assuring completion by 15.10.2026, work was stopped again on 20.09.2026. Three critical interconnections remain pending, and full water supply has not been restored. No work is currently in progress.

46 8010037 Kuraicha GOV Jhansi Bangra Arjar 424227 Rampura Road Widening[PWD] 16-Jan-2024 PWD has damaged the pipeline from last 2.5 years. As per the instruction of ACS sir, joint meeting was conducted by DM Jhansi. There after joint site inspection was conducted by CE- UPJN and CE- PWD and there after work has been started by PWD on 01-05-2026. However, the work has been stopped due to rainy season for two months. Due to the intervention of MD-UPJN and DM Jhansi on 01-09-2026 work re-started. Partial water supply has been started at this village. The completion date will be finalised during the meeting called by DM Jhansi on 23-09-2026.
47 8010037 Kuraicha GOV Jhansi Bangra Arjar 424227 Rampura Road Widening[PWD] 16-Jan-2024 PWD has damaged the pipeline, and the issue has remained unresolved for the last 2.5 years. After the intervention of the ACS Sir, a joint meeting of both departments was conducted by the DM, Jhansi. Thereafter, a joint site inspection was carried out by the Chief Engineer (CE), UPJN, and CE, PWD. It was mutually agreed that the pipeline-laying work would be carried out by PWD under the supervision of UPJN and the firm. Accordingly, PWD started the work on 01.05.2026. However, the work was stopped due to the rainy season and was not resumed thereafter. Following the intervention of the MD sir - UPJN (R), the DM - Jhansi, convened a meeting with both departments, and the work was resumed on 01.09.2026. Water supply has been started partially and the work is currently in progress. The completion date will be finalized during the meeting convened by the DM, Jhansi, on 23.09.2026.
48 8010037 Kuraicha GOV Jhansi Bangra Ninaura 424230 Ninaura Road Widening[PWD] 19-Sep-2026 Pwd has damaged the pipeline from last 1.5 years and still not repaired it till now.
49 8010037 Kuraicha GOV Jhansi Bangra Arjar 424227 Rampura Road Widening[PWD] 19-Sep-2026 PWD-damaged pipeline has remained unresolved for the last 1.5 years. Repair work is now in progress. DM meeting is scheduled on 23-09-2026 with PWD officers for review.
50 8010037 Kuraicha GOV Jhansi Bangra Arjar 424226 Arjar Road Widening[PWD] 19-Sep-2026 PWD-damaged pipeline has remained unresolved for the last 1.5 years. Repair work is now in progress. DM meeting is scheduled on 23-09-2026 with PWD officers for review.