Sr No. Scheme Code Scheme Name OHT Code District Block Panchayat Village Code Village Issue Type Issue Date Expected Issue Resolve Date Remark
1 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-27 Banda Jaspura Amara 426117 Amara Power/Electrical Issue 01-Sep-2025 yesterday data could not be updated on the jjm portal due to power outages at wtp
2 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-53 Banda Tindwari Tara 426182 Tara Road Widening[PWD] 01-Apr-2026 30-Apr-2026 Distribution pipeline damaged by PWD, DIA 140mm, 05mtr.and 25nos HSC
3 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-62 Banda Badokhar Khurd Bilbai 426255 Bilbai Road Widening[Other] 01-Apr-2026 20-Apr-2026 Dia-160mm 03nos locations and 05mtr pipeline damaged by electrical department during pole fixing
4 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-45 Banda Baberu Umarahanee 426378 Umarahanee Damage Village Internal Works 01-Apr-2026 30-Apr-2026 Pipe line and HSC damaged by Padhanji during drainage construction.
5 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-46 Banda Baberu Rayan 426380 Rayan Damage Village Internal Works 01-Apr-2026 30-Apr-2026 Pipe line damaged by electrical department during pole erection.
6 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-46 Banda Baberu Rayan 426380 Rayan Damage Village Internal Works 01-Apr-2026 30-Apr-2026 Pipeline and HSC damaged by Pradhan ji during drainage construction.
7 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-46 Banda Baberu Kuchendo 426376 Kuchendo Damage Village Internal Works 01-Apr-2026 30-Apr-2026 Pipe line and HSC damage by Pradhanji during drainage construction
8 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-66 Banda Badokhar Khurd Lama 426239 Lama Road Widening[PWD] 01-Apr-2026 30-Apr-2026 Pipe line damaged by PWD near LAMA village.
9 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-11 Banda Jaspura Dandamau 426108 Dadamau Road Widening[PWD] 01-Feb-2026 30-Apr-2026 200 HSC was damaged by the PWD during CC road construction. Despite several follow‑ups, the connection has still not been repaired by them.
10 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-66 Banda Tindwari Atarahat 426204 Atarahat Road Widening[PWD] 01-Feb-2026 30-Apr-2026 60 HSC was damaged by the PWD during road widening and RCC drain construction. Despite several follow‑ups, the connection has still not been repaired by them.
11 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-53 Banda Tindwari Dohatara 426183 Khajuri Road Widening[PWD] 01-Feb-2026 28-Feb-2026 Distribution pipe line damaged by PWD
12 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-72 Banda Badokhar Khurd Palhari 426271 Palhari Road Widening[PWD] 01-Feb-2026 28-Feb-2026 Distribution pipeline damaged by PWD, Water supply disturbed in approx 100 FHTC
13 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-72 Banda Badokhar Khurd Gureh 426276 Gureh Road Widening[PWD] 01-Feb-2026 28-Feb-2026 Distribution pipeline damaged BY PWD, approx 100 FHTC not getting water and 15nos portal complain pending due to this reason.
14 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-38 Banda Baberu Patvan 426335 Patvan Road Widening[Other] 01-Feb-2026 28-Feb-2026 Pipeline damaged by Jila Panchayat, Approx-30FHTC water supply affected
15 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-75 Banda Badokhar Khurd Bharkhari 426265 Bharkhari Road Widening[PWD] 01-Feb-2026 28-Feb-2026 Pipe line damaged by PWD
16 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-42 Banda Baberu Bhadvari 426332 Bhadvari Road Widening[Other] 01-Feb-2026 28-Feb-2026 Pipe line damaged by Jila panchayat
17 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-55 Banda Tindwari Niwaich 426210 Niwaich Road Widening[PWD] 01-Feb-2026 28-Feb-2026 Pipe line Damaged BY PWD
18 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-67 Banda Tindwari Khaptiha Kalan 426217 Khaptiha Kalan Road Widening[PWD] 01-Feb-2026 28-Feb-2026 Pipe line Damaged By PWD
19 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-10 Banda Jaspura Padohara 426105 Padohara Road Widening[PWD] 01-Feb-2026 28-Feb-2026 Pipeline damaged By PWD. Approx 60 FHTC
20 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-52 Banda Tindwari Nari 426213 Nari Road Widening[PWD] 01-Feb-2026 28-Feb-2026 damaged BY PWD, Kachhara Dera water supply disturb
21 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. 426245 Banda Badokhar Khurd Mahokhar 426245 Mahokhar Road Widening[PWD] 01-Jan-2026 30-May-2026 Distribution pipeline damaged by PWD.
22 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-8 Banda Badokhar Khurd Chamraha 426289 Jakhaura Road Widening[PWD] 01-Oct-2025 31-Mar-2026 200mm HDPE pipeline damaged by PWD. water supply disturbed last 3 months in Hardoni majara of Mataundh gramin.
23 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-12 Banda Jaspura Lasada 426126 Lasada Road Widening[PWD] 02-Apr-2026 30-Apr-2026 Distribution pipeline damaged by PWD, Dia 75mm HDPE, 15mtr.
24 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-38 Banda Baberu Patvan 426335 Patvan Road Widening[PWD] 02-Apr-2026 20-Apr-2026 Dia-160mm , 05mtr pipeline damged by PWD.
25 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-10 Banda Jaspura Padohara 426105 Padohara Power/Electrical Issue 02-Aug-2025 04-Aug-2025 power supply issue .main cause of the transmission lines 33kv whitch supply power to the 11 kv substation at jaspura and kanakeda was submerged due heavy floods
26 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-11 Banda Jaspura Dandamau 426108 Dadamau Power/Electrical Issue 02-Aug-2025 04-Aug-2025 power supply issue .main cause of the transmission lines 33kv whitch supply power to the 11 kv substation at jaspura and kanakeda was submerged due heavy floods
27 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-12 Banda Jaspura Lasada 426126 Lasada Power/Electrical Issue 02-Aug-2025 04-Aug-2025 power supply issue .main cause of the transmission lines 33kv whitch supply power to the 11 kv substation at jaspura and kanakeda was submerged due heavy floods
28 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-13 Banda Jaspura Ichhawar 426139 Ichhawar Power/Electrical Issue 02-Aug-2025 04-Aug-2025 power supply issue .main cause of the transmission lines 33kv whitch supply power to the 11 kv substation at jaspura and kanakeda was submerged due heavy floods
29 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-15 Banda Jaspura Gadariya 426116 Gadariya Power/Electrical Issue 02-Aug-2025 04-Aug-2025 power supply issue .main cause of the transmission lines 33kv whitch supply power to the 11 kv substation at jaspura and kanakeda was submerged due heavy floods
30 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-20 Banda Jaspura Adari 426129 Pachkauri Power/Electrical Issue 02-Aug-2025 04-Aug-2025 Due to bad weather condition solar pumps not work efficient.
31 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-22 Banda Jaspura Barehta 426119 Barehta Power/Electrical Issue 02-Aug-2025 04-Aug-2025 power supply issue .main cause of the transmission lines 33kv whitch supply power to the 11 kv substation at jaspura and kanakeda was submerged due heavy floods
32 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-24 Banda Jaspura Rampur 426110 Rampur Power/Electrical Issue 02-Aug-2025 04-Aug-2025 power supply issue .main cause of the transmission lines 33kv whitch supply power to the 11 kv substation at jaspura and kanakeda was submerged due heavy floods
33 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-26 Banda Jaspura Narayarh 426111 Narayarh Power/Electrical Issue 02-Aug-2025 04-Aug-2025 power supply issue .main cause of the transmission lines 33kv whitch supply power to the 11 kv substation at jaspura and kanakeda was submerged due heavy floods
34 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-26 Banda Jaspura Narayarh 426111 Narayarh Power/Electrical Issue 02-Aug-2025 04-Aug-2025 power supply issue .main cause of the transmission lines 33kv whitch supply power to the 11 kv substation at jaspura and kanakeda was submerged due heavy floods
35 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-27 Banda Jaspura Amara 426117 Amara Power/Electrical Issue 02-Aug-2025 04-Aug-2025 power supply issue .main cause of the transmission lines 33kv whitch supply power to the 11 kv substation at jaspura and kanakeda was submerged due heavy floods
36 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-29 Banda Jaspura Khaptiha Khurd 426115 Khaptiha Khurd Power/Electrical Issue 02-Aug-2025 04-Aug-2025 power supply issue .main cause of the transmission lines 33kv whitch supply power to the 11 kv substation at jaspura and kanakeda was submerged due heavy floods
37 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-4 Banda Badokhar Khurd Mataundh(gramin) 426286 Mataundh(gramin) Power/Electrical Issue 02-Aug-2025 03-Aug-2025 Due to heavy rain, power fluctuations
38 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-17 Banda Jaspura Gauri Kalan 426104 Gauri Kalan Power/Electrical Issue 02-Aug-2025 03-Aug-2025 Due to bad weather condition solar pumps not work efficient.
39 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-19 Banda Jaspura Narjita 426123 Sikuwa Power/Electrical Issue 02-Aug-2025 03-Aug-2025 Due to bad weather condition solar pumps not work efficient.
40 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-23 Banda Jaspura Jaspura 426103 Jaspura Power/Electrical Issue 02-Aug-2025 03-Aug-2025 Due to bad weather condition solar pumps not work efficient.
41 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-28 Banda Jaspura Adari 426128 Adari Power/Electrical Issue 02-Aug-2025 04-Aug-2025 Due to bad weather condition solar pumps not work efficient.
42 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-9 Banda Jaspura Madauli Kalan 426135 Madauli Kalan Power/Electrical Issue 02-Aug-2025 03-Aug-2025 Due to bad weather condition solar pumps not work efficient.
43 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-62 Banda Baberu Aliha 426361 Aliha Power/Electrical Issue 02-Mar-2025 Power line connected with local Belgaun tube well feeder approx 6-8hrs electricity supply per day with maximum power cut.
44 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-78 Banda Badokhar Khurd Pandui 426297 Pandui Power/Electrical Issue 02-Mar-2025 Low voltage issue .
45 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-17 Banda Jaspura Gauri Kalan 426104 Gauri Kalan Local Repairing 02-Oct-2025 03-Oct-2025 NETWORK ISSUE
46 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-14 Banda Jaspura Baragaon 426132 Baragaon Local Repairing 02-Oct-2025 03-Oct-2025 NETWORK ISSUE
47 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. 426245 Banda Badokhar Khurd Mahokhar 426245 Mahokhar Power/Electrical Issue 02-Oct-2025 03-Jan-2025 33 KV Power outage from wtp and intake well locations
48 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-32 Banda Baberu Jalalpur 426340 Jalalpur Power/Electrical Issue 02-Oct-2025 03-Oct-2025 33 KV Power outage from wtp and intake well locations
49 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-33 Banda Tindwari Amli Kaur 426178 Amli Kaur Power/Electrical Issue 02-Oct-2025 03-Oct-2025 33 KV Power outage from wtp and intake well locations
50 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-36 Banda Baberu Badaulee 426343 Badaulee Power/Electrical Issue 02-Oct-2025 03-Oct-2025 33 KV Power outage from wtp and intake well locations
51 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-40 Banda Baberu Sanda 426305 Sanda Power/Electrical Issue 02-Oct-2025 03-Oct-2025 33 KV Power outage from wtp and intake well locations
52 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-43 Banda Baberu Achhah 426327 Achhah Power/Electrical Issue 02-Oct-2025 03-Oct-2025 33 KV Power outage from wtp and intake well locations
53 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-45 Banda Baberu Santar 426375 Santar Power/Electrical Issue 02-Oct-2025 03-Oct-2025 33 KV Power outage from wtp and intake well locations
54 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-46 Banda Baberu Kayal 426377 Kayal Power/Electrical Issue 02-Oct-2025 03-Oct-2025 33 KV Power outage from wtp and intake well locations
55 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-48 Banda Tindwari Bambiya 426197 Bhadauli Power/Electrical Issue 02-Oct-2025 03-Oct-2025 33 KV Power outage from wtp and intake well locations
56 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-50 Banda Tindwari Dhaunsar 426161 Dhaunsar Power/Electrical Issue 02-Oct-2025 03-Oct-2025 33 KV Power outage from wtp and intake well locations
57 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-51 Banda Tindwari Bhindaura 426168 Bhindaura Power/Electrical Issue 02-Oct-2025 03-Oct-2025 33 KV Power outage from wtp and intake well locations
58 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-54 Banda Tindwari Chilla 426179 Chilla Power/Electrical Issue 02-Oct-2025 03-Oct-2025 33 KV Power outage from wtp and intake well locations
59 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-55 Banda Tindwari Piparahari 426216 Piparahari Power/Electrical Issue 02-Oct-2025 03-Oct-2025 33 KV Power outage from wtp and intake well locations
60 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-56 Banda Tindwari Rahuta 426221 Rahuta Power/Electrical Issue 02-Oct-2025 03-Oct-2025 33 KV Power outage from wtp and intake well locations
61 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-57 Banda Tindwari Terahi Mafi 426153 Sonrahi Power/Electrical Issue 02-Oct-2025 03-Oct-2025 33 KV Power outage from wtp and intake well locations
62 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-58 Banda Tindwari Bahinga 426159 Arsaunda Power/Electrical Issue 02-Oct-2025 03-Oct-2025 33 KV Power outage from wtp and intake well locations
63 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-60 Banda Badokhar Khurd Saimara 426247 Saimara Power/Electrical Issue 02-Oct-2025 03-Oct-2025 33 KV Power outage from wtp and intake well locations
64 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-61 Banda Tindwari Bhujauli 426223 Bhujauli Power/Electrical Issue 02-Oct-2025 03-Oct-2025 33 KV Power outage from wtp and intake well locations
65 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-62 Banda Baberu Aliha 426361 Aliha Power/Electrical Issue 02-Oct-2025 03-Oct-2025 33 KV Power outage from wtp and intake well locations
66 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-65 Banda Tindwari Mahui 426209 Gohurwa Power/Electrical Issue 02-Oct-2025 03-Oct-2025 33 KV Power outage from wtp and intake well locations
67 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-67 Banda Tindwari Alona 426219 Alona Power/Electrical Issue 02-Oct-2025 03-Oct-2025 33 KV Power outage from wtp and intake well locations
68 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-68 Banda Badokhar Khurd Luktara 426229 Luktara Power/Electrical Issue 02-Oct-2025 03-Oct-2025 33 KV Power outage from wtp and intake well locations
69 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-69 Banda Badokhar Khurd Chheharao 426231 Chheharao Power/Electrical Issue 02-Oct-2025 03-Oct-2025 33 KV Power outage from wtp and intake well locations
70 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-70 Banda Badokhar Khurd Chahitara 426235 Chahitara Power/Electrical Issue 02-Oct-2025 03-Oct-2025 33 KV Power outage from wtp and intake well locations
71 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-71 Banda Badokhar Khurd Chakchatgan 426233 Chakchatgan Power/Electrical Issue 02-Oct-2025 03-Oct-2025 33 KV Power outage from wtp and intake well locations
72 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-72 Banda Badokhar Khurd Gureh 426276 Gureh Power/Electrical Issue 02-Oct-2025 03-Oct-2025 33 KV Power outage from wtp and intake well locations
73 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-73 Banda Badokhar Khurd Jaurahi 426251 Dadariya Power/Electrical Issue 02-Oct-2025 03-Oct-2025 33 KV Power outage from wtp and intake well locations
74 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-74 Banda Badokhar Khurd Doha 426254 Doha Power/Electrical Issue 02-Oct-2025 03-Oct-2025 33 KV Power outage from wtp and intake well locations
75 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-23 Banda Jaspura Jaspura 426103 Jaspura Power/Electrical Issue 02-Oct-2025 03-Oct-2025 Due to bad weather condition solar pumps not work efficient
76 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-3 Banda Badokhar Khurd Mataundh(gramin) 426286 Mataundh(gramin) Power/Electrical Issue 02-Oct-2025 03-Oct-2025 33 KV Power outage from wtp and intake well locations
77 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-4 Banda Badokhar Khurd Mataundh(gramin) 426286 Mataundh(gramin) Local Repairing 02-Oct-2025 03-Oct-2025 Network issue
78 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-5 Banda Badokhar Khurd Goyara Mugali 426284 Goyara Mugali Power/Electrical Issue 02-Oct-2025 03-Oct-2025 33 KV Power outage from wtp and intake well locations
79 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-6 Banda Badokhar Khurd Durendi 426293 Durendi Power/Electrical Issue 02-Oct-2025 03-Oct-2025 33 KV Power outage from wtp and intake well locations
80 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-21 Banda Jaspura Jhanjhari 426109 Jhanjhari Power/Electrical Issue 02-Sep-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
81 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-34 Banda Tindwari Lohari 426164 Lohari Power/Electrical Issue 02-Sep-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
82 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-30 Banda Kamasin Kuchouli 426450 Kuchouli Power/Electrical Issue 04-Aug-2025 03-Aug-2025 Due to bad weather condition solar pumps not work efficient.
83 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-21 Banda Jaspura Jhanjhari 426109 Jhanjhari Power/Electrical Issue 04-Aug-2025 04-Aug-2025 power supply issue .main cause of the transmission lines 33kv whitch supply power to the 11 kv substation at jaspura and kanakeda was submerged due heavy floods
84 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-17 Banda Jaspura Gauri Kalan 426104 Gauri Kalan Power/Electrical Issue 04-Aug-2025 03-Aug-2025 Due to bad weather condition solar pumps not work efficient.
85 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-79 Banda Badokhar Khurd Ganchha 426299 Kunwarpur Power/Electrical Issue 04-Jan-2025 05-Sep-2025 water is being physically supplied but due to power outages at the wate treatment plant(WTP) The actual water supply data has not been updated at JJM Portal
86 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-1 Banda Badokhar Khurd Marauli 426278 Marauli Power/Electrical Issue 04-Sep-2025 05-Sep-2025 water is being physically supplied but due to power outages at the wate treatment plant(WTP) The actual water supply data has not been updated at JJM Portal
87 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-12 Banda Jaspura Lasada 426126 Lasada Power/Electrical Issue 04-Sep-2025 05-Sep-2025 water is being physically supplied but due to power outages at the wate treatment plant(WTP) The actual water supply data has not been updated at JJM Portal
88 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-13 Banda Jaspura Ichhawar 426139 Ichhawar Power/Electrical Issue 04-Sep-2025 05-Sep-2025 water is being physically supplied but due to power outages at the wate treatment plant(WTP) The actual water supply data has not been updated at JJM Portal
89 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-14 Banda Jaspura Baragaon 426132 Baragaon Power/Electrical Issue 04-Sep-2025 05-Sep-2025 water is being physically supplied but due to power outages at the wate treatment plant(WTP) The actual water supply data has not been updated at JJM Portal
90 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-15 Banda Jaspura Gadariya 426116 Gadariya Power/Electrical Issue 04-Sep-2025 05-Sep-2025 water is being physically supplied but due to power outages at the wate treatment plant(WTP) The actual water supply data has not been updated at JJM Portal
91 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-16 Banda Jaspura Amara 426118 Madauli Khurd Power/Electrical Issue 04-Sep-2025 05-Sep-2025 water is being physically supplied but due to power outages at the wate treatment plant(WTP) The actual water supply data has not been updated at JJM Portal
92 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-17 Banda Jaspura Gauri Kalan 426104 Gauri Kalan Power/Electrical Issue 04-Sep-2025 05-Sep-2025 water is being physically supplied but due to power outages at the wate treatment plant(WTP) The actual water supply data has not been updated at JJM Portal
93 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-17 Banda Jaspura Gauri Kalan 426104 Gauri Kalan Power/Electrical Issue 04-Sep-2025 05-Sep-2025 water is being physically supplied but due to power outages at the wate treatment plant(WTP) The actual water supply data has not been updated at JJM Portal
94 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-18 Banda Jaspura Gadola 426147 Gadola Power/Electrical Issue 04-Sep-2025 05-Sep-2025 water is being physically supplied but due to power outages at the wate treatment plant(WTP) The actual water supply data has not been updated at JJM Portal
95 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-21 Banda Jaspura Jhanjhari 426109 Jhanjhari Power/Electrical Issue 04-Sep-2025 05-Sep-2025 water is being physically supplied but due to power outages at the wate treatment plant(WTP) The actual water supply data has not been updated at JJM Portal
96 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-22 Banda Jaspura Barehta 426119 Barehta Power/Electrical Issue 04-Sep-2025 05-Sep-2025 water is being physically supplied but due to power outages at the wate treatment plant(WTP) The actual water supply data has not been updated at JJM Portal
97 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-23 Banda Jaspura Jaspura 426103 Jaspura Power/Electrical Issue 04-Sep-2025 05-Sep-2025 water is being physically supplied but due to power outages at the wate treatment plant(WTP) The actual water supply data has not been updated at JJM Portal
98 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-28 Banda Jaspura Adari 426128 Adari Power/Electrical Issue 04-Sep-2025 05-Sep-2025 water is being physically supplied but due to power outages at the wate treatment plant(WTP) The actual water supply data has not been updated at JJM Portal
99 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-29 Banda Jaspura Khaptiha Khurd 426115 Khaptiha Khurd Power/Electrical Issue 04-Sep-2025 05-Sep-2025 water is being physically supplied but due to power outages at the wate treatment plant(WTP) The actual water supply data has not been updated at JJM Portal
100 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-3 Banda Badokhar Khurd Mataundh(gramin) 426286 Mataundh(gramin) Power/Electrical Issue 04-Sep-2025 05-Sep-2025 water is being physically supplied but due to power outages at the wate treatment plant(WTP) The actual water supply data has not been updated at JJM Portal
101 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-4 Banda Badokhar Khurd Mataundh(gramin) 426286 Mataundh(gramin) Power/Electrical Issue 04-Sep-2025 05-Sep-2025 water is being physically supplied but due to power outages at the wate treatment plant(WTP) The actual water supply data has not been updated at JJM Portal
102 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-5 Banda Badokhar Khurd Goyara Mugali 426284 Goyara Mugali Power/Electrical Issue 04-Sep-2025 05-Sep-2025 water is being physically supplied but due to power outages at the wate treatment plant(WTP) The actual water supply data has not been updated at JJM Portal
103 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-6 Banda Badokhar Khurd Durendi 426293 Durendi Power/Electrical Issue 04-Sep-2025 05-Sep-2025 water is being physically supplied but due to power outages at the wate treatment plant(WTP) The actual water supply data has not been updated at JJM Portal
104 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-9 Banda Jaspura Madauli Kalan 426135 Madauli Kalan Power/Electrical Issue 04-Sep-2025 05-Sep-2025 water is being physically supplied but due to power outages at the wate treatment plant(WTP) The actual water supply data has not been updated at JJM Portal
105 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-73 Banda Badokhar Khurd Jaurahi 426251 Dadariya Power/Electrical Issue 04-Sep-2025 05-Sep-2025 water is being physically supplied but due to power outages at the wate treatment plant(WTP) The actual water supply data has not been updated at JJM Portal
106 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. 426328 Banda Baberu Achhah 426328 Jugrehlee Power/Electrical Issue 04-Sep-2025 05-Sep-2025 water is being physically supplied but due to power outages at the wate treatment plant(WTP) The actual water supply data has not been updated at JJM Portal
107 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-32 Banda Baberu Jalalpur 426341 Gaura Power/Electrical Issue 04-Sep-2025 05-Sep-2025 water is being physically supplied but due to power outages at the wate treatment plant(WTP) The actual water supply data has not been updated at JJM Portal
108 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-33 Banda Tindwari Amli Kaur 426178 Amli Kaur Power/Electrical Issue 04-Sep-2025 05-Sep-2025 water is being physically supplied but due to power outages at the wate treatment plant(WTP) The actual water supply data has not been updated at JJM Portal
109 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-39 Banda Baberu Mantha 426313 Mantha Power/Electrical Issue 04-Sep-2025 05-Sep-2025 water is being physically supplied but due to power outages at the wate treatment plant(WTP) The actual water supply data has not been updated at JJM Portal
110 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-43 Banda Baberu Achhah 426327 Achhah Power/Electrical Issue 04-Sep-2025 05-Sep-2025 water is being physically supplied but due to power outages at the wate treatment plant(WTP) The actual water supply data has not been updated at JJM Portal
111 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-47 Banda Baberu Murwal 426359 Murwal Power/Electrical Issue 04-Sep-2025 05-Sep-2025 water is being physically supplied but due to power outages at the wate treatment plant(WTP) The actual water supply data has not been updated at JJM Portal
112 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-47 Banda Baberu Para Bihari 426366 Koraree Power/Electrical Issue 04-Sep-2025 05-Sep-2025 water is being physically supplied but due to power outages at the wate treatment plant(WTP) The actual water supply data has not been updated at JJM Portal
113 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-55 Banda Tindwari Piparahari 426216 Piparahari Power/Electrical Issue 04-Sep-2025 05-Sep-2025 water is being physically supplied but due to power outages at the wate treatment plant(WTP) The actual water supply data has not been updated at JJM Portal
114 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-56 Banda Tindwari Kukuwa Khas 426215 Kukuwa Khas Power/Electrical Issue 04-Sep-2025 05-Sep-2025 water is being physically supplied but due to power outages at the wate treatment plant(WTP) The actual water supply data has not been updated at JJM Portal
115 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-66 Banda Tindwari Paparenda 426199 Paparenda Power/Electrical Issue 04-Sep-2025 05-Sep-2025 water is being physically supplied but due to power outages at the wate treatment plant(WTP) The actual water supply data has not been updated at JJM Portal
116 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-69 Banda Badokhar Khurd Pachulla 426234 Pachulla Power/Electrical Issue 04-Sep-2025 05-Sep-2025 water is being physically supplied but due to power outages at the wate treatment plant(WTP) The actual water supply data has not been updated at JJM Portal
117 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-72 Banda Badokhar Khurd Palhari 426271 Palhari Power/Electrical Issue 04-Sep-2025 05-Sep-2025 water is being physically supplied but due to power outages at the wate treatment plant(WTP) The actual water supply data has not been updated at JJM Portal
118 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-74 Banda Badokhar Khurd Kul Kumhari 426262 Kul Kumhari Power/Electrical Issue 04-Sep-2025 05-Sep-2025 water is being physically supplied but due to power outages at the wate treatment plant(WTP) The actual water supply data has not been updated at JJM Portal
119 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-66 Banda Tindwari Parsaunda 426203 Barethi Ashkaran Road Widening[PWD] 05-Apr-2026 30-Apr-2026 Pipe damaged by PWD, Dia-160mm, 10mtr.
120 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-62 Banda Baberu Aliha 426361 Aliha Power/Electrical Issue 06-Aug-2025 19-Oct-2025 As informed by DVVNL the power connection for Aliha CWR will be shfited from belgov tube well feeder to Aliha
121 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-62 Banda Baberu Aliha 426361 Aliha Power/Electrical Issue 06-Aug-2025 08-Aug-2025 Power line connected with local Belgaun tube well feeder approx 6-8hrs electricity supply per day with maximum power cut.
122 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-17 Banda Jaspura Gauri Kalan 426104 Gauri Kalan Power/Electrical Issue 06-Nov-2025 07-Nov-2025 Due to bad weather condition solar pumps do not work efficient
123 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-23 Banda Jaspura Jaspura 426103 Jaspura Power/Electrical Issue 06-Nov-2025 07-Nov-2025 Due to bad weather condition solar pumps do not work efficient
124 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-8 Banda Badokhar Khurd Chamraha 426289 Jakhaura Local Repairing 06-Nov-2025 07-Nov-2025 Network issue
125 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. 426245 Banda Badokhar Khurd Mahokhar 426245 Mahokhar Power/Electrical Issue 06-Nov-2025 07-Nov-2025 power outage at baberu dehat cwr
126 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-66 Banda Badokhar Khurd Karahiya 426240 Karahiya Local Repairing 06-Nov-2025 07-Nov-2025 network issue
127 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-14 Banda Jaspura Baragaon 426132 Baragaon Local Repairing 06-Nov-2025 07-Nov-2025 Network issue
128 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-49 Banda Tindwari Mata 426166 Mata Local Repairing 06-Nov-2025 07-Nov-2025 Network issue
129 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-14 Banda Jaspura Baragaon 426132 Baragaon Power/Electrical Issue 06-Oct-2025 07-Oct-2025 power fluctuations
130 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-15 Banda Jaspura Gadariya 426116 Gadariya Power/Electrical Issue 06-Oct-2025 07-Oct-2025 network issue
131 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-17 Banda Jaspura Gauri Kalan 426104 Gauri Kalan Power/Electrical Issue 06-Oct-2025 07-Oct-2025 Due to bad weather condition solar pumps not work efficient
132 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-23 Banda Jaspura Jaspura 426103 Jaspura Power/Electrical Issue 06-Oct-2025 07-Oct-2025 Due to bad weather condition solar pumps not work efficient
133 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-4 Banda Badokhar Khurd Mataundh(gramin) 426286 Mataundh(gramin) Local Repairing 06-Oct-2025 07-Oct-2025 network issue
134 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-49 Banda Tindwari Jasaipur 426167 Kalyanpur Local Repairing 06-Oct-2025 07-Oct-2025 DI pipe leakage rectification work in progreses
135 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-78 Banda Badokhar Khurd Pandui 426297 Pandui Power/Electrical Issue 07-Aug-2025 15-Oct-2025 low voltage rectification work in progreases
136 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-78 Banda Badokhar Khurd Pandui 426297 Pandui Power/Electrical Issue 07-Aug-2025 08-Aug-2025 Low voltage issue .
137 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. 426245 Banda Badokhar Khurd Bargahani 426243 Bargahani Power/Electrical Issue 07-Sep-2025 09-Sep-2025 Due to raising main pipe line leak rectification work under progresses
138 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. 426245 Banda Badokhar Khurd Bargahani 426243 Bargahani Power/Electrical Issue 07-Sep-2025 09-Sep-2025 Due to raising main pipe line leak rectification work under progresses
139 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-33 Banda Tindwari Amli Kaur 426178 Amli Kaur Power/Electrical Issue 07-Sep-2025 09-Sep-2025 Due to raising main pipe line leak rectification work under progresses
140 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-43 Banda Baberu Achhah 426327 Achhah Power/Electrical Issue 07-Sep-2025 09-Sep-2025 Due to raising main pipe line leak rectification work under progresses
141 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-45 Banda Baberu Poon 426325 Poon Power/Electrical Issue 07-Sep-2025 09-Sep-2025 Due to raising main pipe line leak rectification work under progresses
142 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-46 Banda Baberu Kayal 426377 Kayal Power/Electrical Issue 07-Sep-2025 09-Sep-2025 Due to raising main pipe line leak rectification work under progresses
143 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-47 Banda Baberu Para Bihari 426366 Koraree Power/Electrical Issue 07-Sep-2025 09-Sep-2025 Due to raising main pipe line leak rectification work under progresses
144 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-51 Banda Tindwari Bhindaura 426168 Bhindaura Power/Electrical Issue 07-Sep-2025 09-Sep-2025 Due to raising main pipe line leak rectification work under progresses
145 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-61 Banda Tindwari Bhujauli 426223 Bhujauli Power/Electrical Issue 07-Sep-2025 09-Sep-2025 Due to raising main pipe line leak rectification work under progresses
146 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-63 Banda Baberu Ghan Saul 426365 Ghan Saul Power/Electrical Issue 07-Sep-2025 09-Sep-2025 Due to raising main pipe line leak rectification work under progresses
147 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-64 Banda Baberu Baroulee Azam 426371 Baroulee Azam Power/Electrical Issue 07-Sep-2025 09-Sep-2025 Due to raising main pipe line leak rectification work under progresses
148 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-65 Banda Tindwari Gokhrahi 426211 Gokhrahi Local Repairing 07-Sep-2025 09-Sep-2025 Due to raising main pipe line leak rectification work under progresses
149 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-66 Banda Tindwari Parsaunda 426201 Bachheura Local Repairing 07-Sep-2025 09-Sep-2025 Due to raising main pipe line leak rectification work under progresses
150 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. 426245 Banda Badokhar Khurd Bargahani 426243 Bargahani Local Repairing 07-Sep-2025 09-Sep-2025 Due to raising main pipe line leak rectification work under progresses
151 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. 426328 Banda Baberu Alampur 426356 Alampur Local Repairing 07-Sep-2025 09-Sep-2025 Due to raising main pipe line leak rectification work under progresses
152 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-33 Banda Tindwari Amli Kaur 426178 Amli Kaur Local Repairing 07-Sep-2025 09-Sep-2025 Due to raising main pipe line leak rectification work under progresses
153 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-43 Banda Baberu Achhah 426327 Achhah Local Repairing 07-Sep-2025 09-Sep-2025 Due to raising main pipe line leak rectification work under progresses
154 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-45 Banda Baberu Poon 426325 Poon Local Repairing 07-Sep-2025 09-Sep-2025 Due to raising main pipe line leak rectification work under progresses
155 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-46 Banda Baberu Kuchendo 426376 Kuchendo Local Repairing 07-Sep-2025 09-Sep-2025 Due to raising main pipe line leak rectification work under progresses
156 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-47 Banda Baberu Para Bihari 426366 Koraree Local Repairing 07-Sep-2025 09-Sep-2025 Due to raising main pipe line leak rectification work under progresses
157 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-51 Banda Tindwari Bhindaura 426168 Bhindaura Local Repairing 07-Sep-2025 09-Sep-2025 Due to raising main pipe line leak rectification work under progresses
158 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-61 Banda Tindwari Godhani 426227 Godhani Local Repairing 07-Sep-2025 09-Sep-2025 Due to raising main pipe line leak rectification work under progresses
159 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-63 Banda Baberu Ghan Saul 426364 Janvara Local Repairing 07-Sep-2025 09-Sep-2025 Due to raising main pipe line leak rectification work under progresses
160 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-64 Banda Baberu Baroulee Azam 426371 Baroulee Azam Power/Electrical Issue 07-Sep-2025 09-Sep-2025 Due to raising main pipe line leak rectification work under progresses
161 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-64 Banda Baberu Baroulee Azam 426371 Baroulee Azam Local Repairing 07-Sep-2025 09-Sep-2025 Due to raising main pipe line leak rectification work under progresses
162 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-48 Banda Tindwari Khaunda 426176 Datarauli Local Repairing 07-Sep-2025 09-Sep-2025 Due to raising main pipe line leak rectification work under progresses
163 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-74 Banda Badokhar Khurd Chhanehara Lalpur 426261 Chhanehara Lalpur Local Repairing 07-Sep-2025 09-Sep-2025 Due to raising main pipe line leak rectification work under progresses
164 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-77 Banda Badokhar Khurd Bandha Purwa 426296 Bandha Purwa Local Repairing 07-Sep-2025 09-Sep-2025 Due to raising main pipe line leak rectification work under progresses
165 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-79 Banda Badokhar Khurd Ganchha 426299 Kunwarpur Local Repairing 07-Sep-2025 09-Sep-2025 Due to raising main pipe line leak rectification work under progresses
166 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-80 Banda Badokhar Khurd Ladakapurwa 426272 Bhawani Purwa Local Repairing 07-Sep-2025 09-Sep-2025 Due to raising main pipe line leak rectification work under progresses
167 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-75 Banda Badokhar Khurd Bharkhari 426265 Bharkhari Local Repairing 07-Sep-2025 09-Sep-2025 Due to raising main pipe line leak rectification work under progresses
168 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-72 Banda Badokhar Khurd Gureh 426276 Gureh Local Repairing 07-Sep-2025 09-Sep-2025 Due to raising main pipe line leak rectification work under progresses
169 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-73 Banda Badokhar Khurd Jaurahi 426252 Jaurahi Local Repairing 07-Sep-2025 09-Sep-2025 Due to raising main pipe line leak rectification work under progresses
170 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-74 Banda Badokhar Khurd Chhanehara Lalpur 426261 Chhanehara Lalpur Local Repairing 07-Sep-2025 09-Sep-2025 Due to raising main pipe line leak rectification work under progresses
171 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-75 Banda Badokhar Khurd Bharkhari 426265 Bharkhari Local Repairing 07-Sep-2025 09-Sep-2025 Due to raising main pipe line leak rectification work under progresses
172 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-77 Banda Badokhar Khurd Bandha Purwa 426296 Bandha Purwa Local Repairing 07-Sep-2025 09-Sep-2025 Due to raising main pipe line leak rectification work under progresses
173 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-79 Banda Badokhar Khurd Ganchha 426299 Kunwarpur Local Repairing 07-Sep-2025 09-Sep-2025 Due to raising main pipe line leak rectification work under progresses
174 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-80 Banda Badokhar Khurd Ladakapurwa 426272 Bhawani Purwa Local Repairing 07-Sep-2025 09-Sep-2025 Due to raising main pipe line leak rectification work under progresses
175 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-17 Banda Jaspura Gauri Kalan 426104 Gauri Kalan Power/Electrical Issue 07-Sep-2025 09-Sep-2025 due to bad weather condition solar pumps not work efficient.
176 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-69 Banda Badokhar Khurd Pachulla 426234 Pachulla Road Widening[PWD] 08-Feb-2026 28-Feb-2026 Pipe line damaged by PWD
177 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-23 Banda Jaspura Jaspura 426103 Jaspura Power/Electrical Issue 08-Sep-2025 09-Sep-2025 due to bad weather condition solar pumps not work efficient.
178 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-25 Banda Jaspura Sikahula 426120 Sikahula Power/Electrical Issue 08-Sep-2025 09-Sep-2025 due to bad weather condition solar pumps not work efficient.
179 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-4 Banda Badokhar Khurd Mataundh(gramin) 426286 Mataundh(gramin) Power/Electrical Issue 08-Sep-2025 09-Sep-2025 due to bad weather condition solar pumps not work efficient.
180 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-6 Banda Badokhar Khurd Durendi 426293 Durendi Local Repairing 08-Sep-2025 09-Sep-2025 network issue
181 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-3 Banda Badokhar Khurd Mataundh(gramin) 426286 Mataundh(gramin) Local Repairing 08-Sep-2025 09-Sep-2025 net work isuue
182 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-13 Banda Jaspura Ichhawar 426139 Ichhawar Local Repairing 08-Sep-2025 09-Sep-2025 motor repaing work was completed
183 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-14 Banda Jaspura Baragaon 426132 Baragaon Local Repairing 08-Sep-2025 09-Sep-2025 network issue
184 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-15 Banda Jaspura Gadariya 426116 Gadariya Local Repairing 08-Sep-2025 09-Sep-2025 network issue
185 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-16 Banda Jaspura Amara 426118 Madauli Khurd Power/Electrical Issue 08-Sep-2025 09-Sep-2025 due to bad weather condition solar pumps not work efficient.
186 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-72 Banda Badokhar Khurd Palhari 426271 Palhari Road Widening[PWD] 09-Jan-2026 15-Jan-2025 Rising main Pipeline damaged by PWD due to road widening.
187 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-43 Banda Baberu Achhah 426327 Achhah Local Repairing 09-Oct-2025 11-Oct-2025 Rising main DI K9 -800mm Dia pipe line leakage repairing work in progress
188 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. 426328 Banda Baberu Achhah 426328 Jugrehlee Local Repairing 09-Oct-2025 11-Oct-2025 Rising main DI K9 -800mm Dia pipe line leakage repairing work in progress
189 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-45 Banda Baberu Santar 426375 Santar Local Repairing 09-Oct-2025 11-Oct-2025 Rising main DI K9 -800mm Dia pipe line leakage repairing work in progress
190 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-47 Banda Baberu Para Bihari 426366 Koraree Local Repairing 09-Oct-2025 11-Oct-2025 Rising main DI K9 -800mm Dia pipe line leakage repairing work in progress
191 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-48 Banda Tindwari Khaunda 426174 Khaunda Local Repairing 09-Oct-2025 11-Oct-2025 Rising main DI K9 -800mm Dia pipe line leakage repairing work in progress
192 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-50 Banda Tindwari Dhaunsar 426161 Dhaunsar Local Repairing 09-Oct-2025 11-Oct-2025 Rising main DI K9 -800mm Dia pipe line leakage repairing work in progress
193 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-55 Banda Tindwari Piparahari 426216 Piparahari Local Repairing 09-Oct-2025 11-Oct-2025 Rising main DI K9 -800mm Dia pipe line leakage repairing work in progress
194 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-56 Banda Tindwari Rahuta 426221 Rahuta Local Repairing 09-Oct-2025 11-Oct-2025 Rising main DI K9 -800mm Dia pipe line leakage repairing work in progress
195 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-61 Banda Tindwari Godhani 426227 Godhani Local Repairing 09-Oct-2025 11-Oct-2025 Rising main DI K9 -800mm Dia pipe line leakage repairing work in progress
196 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-62 Banda Baberu Aliha 426361 Aliha Local Repairing 09-Oct-2025 11-Oct-2025 Rising main DI K9 -800mm Dia pipe line leakage repairing work in progress
197 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-63 Banda Baberu Pista 426363 Pista Local Repairing 09-Oct-2025 11-Oct-2025 Rising main DI K9 -800mm Dia pipe line leakage repairing work in progress
198 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-64 Banda Baberu Baroulee Azam 426371 Baroulee Azam Local Repairing 09-Oct-2025 11-Oct-2025 Rising main DI K9 -800mm Dia pipe line leakage repairing work in progress
199 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-67 Banda Tindwari Alona 426219 Alona Local Repairing 09-Oct-2025 11-Oct-2025 Rising main DI K9 -800mm Dia pipe line leakage repairing work in progress
200 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-69 Banda Badokhar Khurd Pachulla 426234 Pachulla Local Repairing 09-Oct-2025 11-Oct-2025 Rising main DI K9 -800mm Dia pipe line leakage repairing work in progress
201 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-70 Banda Badokhar Khurd Mawai Buzurg 426237 Mawai Buzurg Local Repairing 09-Oct-2025 11-Oct-2025 Rising main DI K9 -800mm Dia pipe line leakage repairing work in progress
202 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-72 Banda Badokhar Khurd Palhari 426271 Palhari Local Repairing 09-Oct-2025 11-Oct-2025 Rising main DI K9 -800mm Dia pipe line leakage repairing work in progress
203 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-73 Banda Badokhar Khurd Jaurahi 426252 Jaurahi Local Repairing 09-Oct-2025 11-Oct-2025 Rising main DI K9 -800mm Dia pipe line leakage repairing work in progress
204 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-74 Banda Badokhar Khurd Chhanehara Lalpur 426261 Chhanehara Lalpur Local Repairing 09-Oct-2025 11-Oct-2025 Rising main DI K9 -800mm Dia pipe line leakage repairing work in progress
205 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-75 Banda Badokhar Khurd Bharkhari 426265 Bharkhari Local Repairing 09-Oct-2025 11-Oct-2025 Rising main DI K9 -800mm Dia pipe line leakage repairing work in progress
206 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-76 Banda Badokhar Khurd Barokhar Khurd 426269 Barokhar Khurd Local Repairing 09-Oct-2025 11-Oct-2025 Rising main DI K9 -800mm Dia pipe line leakage repairing work in progress
207 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-77 Banda Badokhar Khurd Bandha Purwa 426296 Bandha Purwa Local Repairing 09-Oct-2025 11-Oct-2025 Rising main DI K9 -800mm Dia pipe line leakage repairing work in progress
208 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-79 Banda Badokhar Khurd Ganchha 426299 Kunwarpur Local Repairing 09-Oct-2025 11-Oct-2025 Rising main DI K9 -800mm Dia pipe line leakage repairing work in progress
209 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-46 Banda Baberu Kayal 426377 Kayal Local Repairing 09-Oct-2025 14-Oct-2025 Rising main DI K9 -800mm Dia pipe line leakage repairing work in progress
210 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-67 Banda Tindwari Alona 426219 Alona Local Repairing 09-Sep-2025 09-Sep-2025 Due to raising main pipe line leak rectification work under progresses
211 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-66 Banda Tindwari Parsaunda 426200 Parsaunda Road Widening[PWD] 10-Apr-2026 30-Apr-2026 pipe damged by PWD, Dia-75, 10mtrs and 20nos HSC
212 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-37 Banda Tindwari Palara 426188 Palara Road Widening[PWD] 10-Apr-2026 30-Apr-2026 23nos HSC damaged by PWD
213 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-53 Banda Tindwari Dohatara 426184 Dohatara Road Widening[PWD] 10-Apr-2026 30-Jan-2026 Distribution pipeline damaged by PWD, Dia-75mm HDPE, 10mtrs
214 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-47 Banda Baberu Para Bihari 426367 Para Bihari Damage Village Internal Works 10-Dec-2025 20-Mar-2026 Pipeline and FHTC damaged by village pradhan during road work
215 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-10 Banda Jaspura Padohara 426105 Padohara Road Widening[PWD] 10-Feb-2026 30-Apr-2026 50 HSC was damaged by the PWD during CC road construction. Despite several follow‑ups, the connections has still not been repaired by them.
216 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-45 Banda Baberu Santar 426375 Santar Local Repairing 10-Jul-2025 Due to Nala construction PWD contractor damage Satar village distribution pipe line.
217 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-3 Banda Badokhar Khurd Mataundh(gramin) 426286 Mataundh(gramin) Road Widening[PWD] 10-May-2025 Due to road widening and nala Construction by PWD main distribution line of 200mm HDPE approx.-700mtr full length damaged with 20nos HSC connection.
218 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-8 Banda Badokhar Khurd Chamraha 426289 Jakhaura Local Repairing 10-Nov-2025 11-Nov-2025 Network issue
219 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-4 Banda Badokhar Khurd Mataundh(gramin) 426286 Mataundh(gramin) Local Repairing 10-Nov-2025 11-Nov-2025 network issue
220 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-23 Banda Jaspura Jaspura 426103 Jaspura Power/Electrical Issue 10-Nov-2025 11-Nov-2025 Due to bad weather condition solar pumps do not work efficient
221 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-22 Banda Jaspura Barehta 426119 Barehta Power/Electrical Issue 10-Nov-2025 11-Nov-2022 power outage
222 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-17 Banda Jaspura Gauri Kalan 426104 Gauri Kalan Power/Electrical Issue 10-Nov-2025 11-Nov-2025 Due to bad weather condition solar pumps do not work efficient
223 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-15 Banda Jaspura Gadariya 426116 Gadariya Local Repairing 10-Nov-2025 11-Nov-2025 network issue
224 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-14 Banda Jaspura Baragaon 426132 Baragaon Local Repairing 10-Nov-2025 11-Nov-2025 Network issue
225 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. 426328 Banda Baberu Achhah 426328 Jugrehlee Local Repairing 10-Oct-2025 14-Oct-2025 Rising main DI K9 -800mm Dia pipe line leakage repairing work in progress
226 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-45 Banda Baberu Santar 426375 Santar Local Repairing 10-Oct-2025 14-Oct-2025 Rising main DI K9 -800mm Dia pipe line leakage repairing work in progress
227 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-62 Banda Baberu Aliha 426361 Aliha Local Repairing 10-Oct-2025 14-Oct-2025 Rising main DI K9 -800mm Dia pipe line leakage repairing work in progress
228 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-63 Banda Baberu Pista 426363 Pista Local Repairing 10-Oct-2025 14-Oct-2025 Rising main DI K9 -800mm Dia pipe line leakage repairing work in progress
229 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-61 Banda Tindwari Godhani 426227 Godhani Local Repairing 10-Oct-2025 14-Oct-2025 Rising main DI K9 -800mm Dia pipe line leakage repairing work in progress
230 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-74 Banda Badokhar Khurd Chhanehara Lalpur 426261 Chhanehara Lalpur Local Repairing 10-Oct-2025 14-Oct-2025 Rising main DI K9 -800mm Dia pipe line leakage repairing work in progress
231 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-73 Banda Badokhar Khurd Jaurahi 426252 Jaurahi Local Repairing 10-Oct-2025 14-Oct-2025 Rising main DI K9 -800mm Dia pipe line leakage repairing work in progress
232 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-72 Banda Badokhar Khurd Palhari 426271 Palhari Local Repairing 10-Oct-2025 14-Oct-2025 Rising main DI K9 -800mm Dia pipe line leakage repairing work in progress
233 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. 426245 Banda Badokhar Khurd Mahokhar 426245 Mahokhar Local Repairing 10-Oct-2025 14-Oct-2025 Rising main DI K9 -800mm Dia pipe line leakage repairing work in progress
234 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-75 Banda Badokhar Khurd Bharkhari 426265 Bharkhari Local Repairing 10-Oct-2025 14-Oct-2025 Rising main DI K9 -800mm Dia pipe line leakage repairing work in progress
235 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-47 Banda Baberu Para Bihari 426366 Koraree Local Repairing 10-Oct-2025 14-Oct-2025 Rising main DI K9 -800mm Dia pipe line leakage repairing work in progress
236 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-76 Banda Badokhar Khurd Barokhar Khurd 426269 Barokhar Khurd Local Repairing 10-Oct-2025 14-Oct-2025 Rising main DI K9 -800mm Dia pipe line leakage repairing work in progress
237 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-77 Banda Badokhar Khurd Bandha Purwa 426296 Bandha Purwa Local Repairing 10-Oct-2025 14-Oct-2025 Rising main DI K9 -800mm Dia pipe line leakage repairing work in progress
238 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-79 Banda Badokhar Khurd Ganchha 426299 Kunwarpur Local Repairing 10-Oct-2025 14-Oct-2025 Rising main DI K9 -800mm Dia pipe line leakage repairing work in progress
239 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-80 Banda Badokhar Khurd Hateti Purwa 426295 Hateti Purwa Local Repairing 10-Oct-2025 14-Oct-2025 Rising main DI K9 -800mm Dia pipe line leakage repairing work in progress
240 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-78 Banda Badokhar Khurd Pandui 426297 Pandui Local Repairing 10-Oct-2025 14-Oct-2025 Rising main DI K9 -800mm Dia pipe line leakage repairing work in progress
241 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-43 Banda Baberu Achhah 426327 Achhah Local Repairing 10-Oct-2025 14-Oct-2025 Rising main DI K9 -800mm Dia pipe line leakage repairing work in progress
242 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-64 Banda Baberu Baroulee Azam 426371 Baroulee Azam Local Repairing 10-Oct-2025 14-Oct-2025 Rising main DI K9 -800mm Dia pipe line leakage repairing work in progress
243 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-53 Banda Tindwari Dohatara 426184 Dohatara Road Widening[PWD] 11-Feb-2026 28-Feb-2026 Distribution pipe line damaged by PWD
244 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-67 Banda Tindwari Alona 426219 Alona Road Widening[PWD] 11-Sep-2025 PWD Dept pipe line damaged K9-350 MM DIA
245 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-14 Banda Jaspura Baragaon 426132 Baragaon Local Repairing 12-Sep-2025 13-Sep-2025 network issue
246 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-15 Banda Jaspura Gadariya 426116 Gadariya Local Repairing 12-Sep-2025 13-Sep-2025 network issue
247 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-17 Banda Jaspura Gauri Kalan 426104 Gauri Kalan Power/Electrical Issue 12-Sep-2025 13-Sep-2025 due to bad weather condition solar pumps not work efficient.
248 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-23 Banda Jaspura Jaspura 426103 Jaspura Power/Electrical Issue 12-Sep-2025 13-Sep-2025 due to bad weather condition solar pumps not work efficient.
249 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-21 Banda Jaspura Jhanjhari 426109 Jhanjhari Local Repairing 12-Sep-2025 13-Sep-2025 At jhanjhari ph-2 new transformer installed work was completed
250 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-4 Banda Badokhar Khurd Mataundh(gramin) 426286 Mataundh(gramin) Local Repairing 12-Sep-2025 13-Sep-2025 Network isuue
251 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-62 Banda Baberu Aliha 426361 Aliha Local Repairing 12-Sep-2025 13-Sep-2025 scada mainteance work was completed
252 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-66 Banda Badokhar Khurd Karahiya 426240 Karahiya Local Repairing 12-Sep-2025 13-Sep-2025 network issue
253 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-66 Banda Badokhar Khurd Lama 426239 Lama Road Widening[PWD] 13-Feb-2026 28-Feb-2026 Pipeline damaged BY PWD
254 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-17 Banda Jaspura Gauri Kalan 426104 Gauri Kalan Power/Electrical Issue 13-Nov-2025 14-Nov-2025 Due to bad weather condition solar pumps do not work efficient
255 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-23 Banda Jaspura Jaspura 426103 Jaspura Power/Electrical Issue 13-Nov-2025 14-Nov-2025 Due to bad weather condition solar pumps do not work efficient
256 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-78 Banda Badokhar Khurd Pandui 426297 Pandui Local Repairing 13-Nov-2025 14-Nov-2025 Network Issue
257 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-14 Banda Jaspura Baragaon 426132 Baragaon Local Repairing 13-Nov-2025 14-Nov-2025 Network issue
258 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-15 Banda Jaspura Gadariya 426116 Gadariya Local Repairing 13-Nov-2025 14-Nov-2025 network isue
259 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-55 Banda Tindwari Niwaich 426210 Niwaich Road Widening[PWD] 14-Feb-2026 28-Feb-2026 Pipeline line damaged by PWD in Niwaich village
260 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-4 Banda Badokhar Khurd Mataundh(gramin) 426286 Mataundh(gramin) Local Repairing 14-Sep-2025 network issue
261 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-15 Banda Jaspura Gadariya 426116 Gadariya Local Repairing 14-Sep-2025 15-Sep-2025 network issue
262 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-17 Banda Jaspura Gauri Kalan 426104 Gauri Kalan Local Repairing 14-Sep-2025 15-Sep-2025 due to bad weather condition solar pumps not work efficient.
263 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-23 Banda Jaspura Jaspura 426103 Jaspura Power/Electrical Issue 14-Sep-2025 15-Sep-2025 due to bad weather condition solar pumps not work efficient.
264 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-4 Banda Badokhar Khurd Mataundh(gramin) 426286 Mataundh(gramin) Local Repairing 14-Sep-2025 15-Sep-2025 network isuue
265 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-33 Banda Tindwari Amli Kaur 426178 Amli Kaur Local Repairing 14-Sep-2025 15-Sep-2025 network issue
266 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-66 Banda Badokhar Khurd Karahiya 426240 Karahiya Local Repairing 14-Sep-2025 15-Sep-2025 network issue
267 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-67 Banda Tindwari Alona 426219 Alona Local Repairing 14-Sep-2025 15-Sep-2025 PWD Dept pipe line damaged work was completed
268 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-14 Banda Jaspura Baragaon 426132 Baragaon Local Repairing 14-Sep-2025 15-Sep-2025 network issue
269 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-17 Banda Jaspura Gauri Kalan 426104 Gauri Kalan Road Widening[PWD] 15-Feb-2026 28-Feb-2026 Distribution pipeline damaged by PWD. in Kumariya dera
270 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-54 Banda Tindwari Chilla 426179 Chilla Road Widening[PWD] 15-Feb-2026 28-Feb-2026 Rising main Pipeline damaged by PWD Near Tara Village
271 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-54 Banda Tindwari Laumar 426181 Laumar Road Widening[PWD] 15-Feb-2026 28-Feb-2026 Rising main pipeline damaged by PWD near TARA village.
272 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-51 Banda Tindwari Mirgahani 426149 Mirgahani Damage Village Internal Works 15-Feb-2026 20-Mar-2026 Distribution pipeline and FHTC damaged by Zilapanchayat drainage work
273 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-66 Banda Badokhar Khurd Lama 426239 Lama Damage Village Internal Works 15-Feb-2026 20-Mar-2026 FHTC and pipe line damged by Village pradhan due to drainage work
274 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-47 Banda Baberu Para Bihari 426367 Para Bihari Damage Village Internal Works 15-Mar-2026 30-Apr-2026 Pipe line and HSC damaged by block level agency during drainage construction.
275 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-33 Banda Tindwari Amli Kaur 426178 Amli Kaur Power/Electrical Issue 15-Sep-2025 16-Sep-2025 power outage
276 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-62 Banda Baberu Aliha 426361 Aliha Power/Electrical Issue 15-Sep-2025 16-Sep-2025 power outage
277 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-66 Banda Badokhar Khurd Karahiya 426240 Karahiya Local Repairing 15-Sep-2025 16-Sep-2025 network issue
278 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-14 Banda Jaspura Baragaon 426132 Baragaon Local Repairing 15-Sep-2025 16-Sep-2025 network issue
279 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-15 Banda Jaspura Gadariya 426116 Gadariya Local Repairing 15-Sep-2025 16-Sep-2025 network issue
280 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-17 Banda Jaspura Gauri Kalan 426104 Gauri Kalan Power/Electrical Issue 15-Sep-2025 16-Sep-2025 due to bad weather condition solar pumps not work efficient.
281 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-23 Banda Jaspura Jaspura 426103 Jaspura Power/Electrical Issue 15-Sep-2025 16-Sep-2025 due to bad weather condition solar pumps not work efficient.
282 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-30 Banda Kamasin Kuchouli 426450 Kuchouli Power/Electrical Issue 15-Sep-2025 16-Sep-2025 Due to bad weather condition solar pumps not work efficient.
283 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-4 Banda Badokhar Khurd Mataundh(gramin) 426286 Mataundh(gramin) Local Repairing 15-Sep-2025 16-Sep-2025 NETWORK ISSUE
284 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-9 Banda Jaspura Madauli Kalan 426135 Madauli Kalan Power/Electrical Issue 15-Sep-2025 16-Sep-2025 due to bad weather condition solar pumps not work efficient.
285 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-38 Banda Baberu Patvan 426335 Patvan Damage Village Internal Works 17-Apr-2026 30-Apr-2026 pipeline dammed by Jilapanchayat work, during Nala construction.
286 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-41 Banda Baberu Arthara 426319 Arthara Road Widening[PWD] 17-Mar-2026 31-Mar-2026 Pipe line damaged by PWD during construction of Colvert
287 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-14 Banda Jaspura Baragaon 426132 Baragaon Local Repairing 17-Nov-2025 18-Nov-2025 Network issue
288 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-15 Banda Jaspura Gadariya 426116 Gadariya Power/Electrical Issue 17-Nov-2025 18-Nov-2025 Network issue
289 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-23 Banda Jaspura Jaspura 426103 Jaspura Power/Electrical Issue 17-Nov-2025 18-Nov-2025 Due to bad weather condition solar pumps do not work efficient
290 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-4 Banda Badokhar Khurd Mataundh(gramin) 426286 Mataundh(gramin) Local Repairing 17-Nov-2025 18-Nov-2025 network issues
291 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-8 Banda Badokhar Khurd Chamraha 426289 Jakhaura Local Repairing 17-Nov-2025 18-Nov-2025 network issues
292 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-50 Banda Tindwari Dhaunsar 426161 Dhaunsar Local Repairing 17-Nov-2025 18-Nov-2025 network issues
293 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-56 Banda Tindwari Rahuta 426221 Rahuta Local Repairing 17-Nov-2025 18-Nov-2025 network issues
294 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-78 Banda Badokhar Khurd Pandui 426297 Pandui Local Repairing 17-Nov-2025 18-Nov-2025 network issues
295 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-56 Banda Tindwari Rahuta 426221 Rahuta Road Widening[PWD] 18-Jul-2025 During PWD road widening they damaged our DI-9 rising main pipe line approx 80 mtr length.
296 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-14 Banda Jaspura Baragaon 426132 Baragaon Power/Electrical Issue 18-Sep-2025 19-Sep-2025 Power outage at due to heavy rain
297 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-17 Banda Jaspura Gauri Kalan 426104 Gauri Kalan Power/Electrical Issue 18-Sep-2025 19-Sep-2025 Due to bad weather condition solar pumps not work efficient
298 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-15 Banda Jaspura Gadariya 426116 Gadariya Power/Electrical Issue 18-Sep-2025 19-Sep-2025 power fluctuations
299 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-23 Banda Jaspura Jaspura 426103 Jaspura Power/Electrical Issue 18-Sep-2025 19-Sep-2025 Due to bad weather condition solar pumps not work efficient
300 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-28 Banda Jaspura Adari 426128 Adari Power/Electrical Issue 18-Sep-2025 19-Sep-2025 Due to bad weather condition solar pumps not work efficient
301 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-4 Banda Badokhar Khurd Mataundh(gramin) 426286 Mataundh(gramin) Local Repairing 18-Sep-2025 19-Sep-2025 network isuue
302 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-33 Banda Tindwari Amli Kaur 426178 Amli Kaur Power/Electrical Issue 18-Sep-2025 19-Sep-2025 network issue
303 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-64 Banda Baberu Baroulee Azam 426371 Baroulee Azam Power/Electrical Issue 18-Sep-2025 19-Sep-2025 power outage at baberu dheat pump house
304 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-66 Banda Badokhar Khurd Karahiya 426240 Karahiya Local Repairing 18-Sep-2025 19-Sep-2025 pipe line leak rectification work under progresses
305 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-6 Banda Badokhar Khurd Durendi 426293 Durendi Road Widening[PWD] 20-Feb-2026 28-Feb-2026 Pipeline and HSC damaged by PWD
306 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-46 Banda Baberu Rayan 426380 Rayan Damage Village Internal Works 20-Jan-2026 20-Mar-2026 Pipeline damaged by electrical department during pole fixing
307 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-4 Banda Badokhar Khurd Mataundh(gramin) 426286 Mataundh(gramin) Road Widening[PWD] 20-Jun-2025 30-Jun-2026 200mm HDPE pipeline damaged by PWD during CC road construction near Hardoni.
308 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-52 Banda Tindwari Nari 426213 Nari Local Repairing 20-Mar-2025 18-Oct-2025 During road widening activities the PWD Department damaged the Nari OHT Inlet pipe line rectification work is currently under way
309 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-52 Banda Tindwari Nari 426213 Nari Road Widening[PWD] 20-Mar-2025 18-Oct-2025 During road widening activities the PWD Department damaged the Nari OHT Inlet pipe line rectification work is currently under way
310 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-64 Banda Baberu Nelathu 426372 Nelathu Road Widening[PWD] 20-Mar-2026 31-Mar-2026 Distribution Pipe line damaged by PWD
311 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-52 Banda Tindwari Nari 426213 Nari Road Widening[PWD] 20-May-2025 During PWD road widening they damaged our DI-9 rising main pipe line approx 6km length.
312 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-14 Banda Jaspura Baragaon 426132 Baragaon Local Repairing 20-Nov-2025 21-Nov-2025 network issue
313 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-15 Banda Jaspura Gadariya 426116 Gadariya Power/Electrical Issue 20-Nov-2025 21-Nov-2025 power outage
314 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-17 Banda Jaspura Gauri Kalan 426104 Gauri Kalan Power/Electrical Issue 20-Nov-2025 21-Nov-2025 Due to bad weather condition solar pumps do not work efficient
315 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-22 Banda Jaspura Barehta 426119 Barehta Power/Electrical Issue 20-Nov-2025 21-Nov-2025 Dvvnl Dept Transformer Rectification work in progreses
316 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-23 Banda Jaspura Jaspura 426103 Jaspura Power/Electrical Issue 20-Nov-2025 21-Nov-2025 Due to bad weather condition solar pumps do not work efficient
317 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-3 Banda Badokhar Khurd Mataundh(gramin) 426286 Mataundh(gramin) Power/Electrical Issue 20-Nov-2025 21-Nov-2025 NETWORK ISSUES
318 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-4 Banda Badokhar Khurd Mataundh(gramin) 426286 Mataundh(gramin) Power/Electrical Issue 20-Nov-2025 21-Nov-2025 NETWORK ISSUES
319 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-5 Banda Badokhar Khurd Goyara Mugali 426284 Goyara Mugali Local Repairing 20-Nov-2025 21-Nov-2025 Network issues
320 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-8 Banda Badokhar Khurd Chamraha 426289 Jakhaura Local Repairing 20-Nov-2025 21-Nov-2025 network issues
321 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-46 Banda Baberu Kayal 426377 Kayal Local Repairing 20-Nov-2025 21-Nov-2025 Flow meter cable rectification work was completed
322 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-52 Banda Tindwari Nari 426213 Nari Road Widening[PWD] 20-Nov-2025 21-Nov-2025 PWD dept damaged pipe line rectification work in progrses
323 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-57 Banda Tindwari Terahi Mafi 426152 Terahi Mafi Local Repairing 20-Nov-2025 21-Nov-2025 network issues
324 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-78 Banda Badokhar Khurd Pandui 426297 Pandui Local Repairing 20-Nov-2025 21-Nov-2025 network issues
325 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-78 Banda Badokhar Khurd Pandui 426297 Pandui Local Repairing 21-Sep-2025 22-Sep-2025 network issue
326 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-66 Banda Badokhar Khurd Karahiya 426240 Karahiya Local Repairing 21-Sep-2025 22-Sep-2025 flow meter cable damaged rectification work was done for your kind information sir
327 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-53 Banda Tindwari Dighwat 426187 Dighwat Road Widening[PWD] 22-Apr-2026 30-Apr-2026 The pipeline has been damaged repeatedly by PWD activities. Each time, the damage was repaired by our team; however, the issue continues to recur.
328 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-15 Banda Jaspura Gadariya 426116 Gadariya Local Repairing 22-Sep-2025 23-Sep-2025 network issue
329 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-17 Banda Jaspura Gauri Kalan 426104 Gauri Kalan Power/Electrical Issue 22-Sep-2025 23-Sep-2025 Due to bad weather condition solar pumps not work efficient
330 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-23 Banda Jaspura Jaspura 426103 Jaspura Power/Electrical Issue 22-Sep-2025 23-Sep-2025 Due to bad weather condition solar pumps not work efficient
331 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-4 Banda Badokhar Khurd Mataundh(gramin) 426286 Mataundh(gramin) Local Repairing 22-Sep-2025 23-Sep-2025 network isuue
332 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-2 Banda Badokhar Khurd Chamraha 426288 Chamraha Tullu Pump 23-Jul-2025 30-Jul-2025 Villagers use tullu pump direct from supply line, due to not getting water some house holders
333 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-52 Banda Tindwari Nari 426213 Nari Road Widening[PWD] 23-Jul-2025 15-Aug-2025 During PWD road widening they damaged our DI-9 rising main pipe line approx 6km length.
334 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-14 Banda Jaspura Baragaon 426132 Baragaon Local Repairing 23-Oct-2025 24-Oct-2025 Network issue
335 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-15 Banda Jaspura Gadariya 426116 Gadariya Power/Electrical Issue 23-Oct-2025 24-Oct-2025 power fluctuvation
336 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-17 Banda Jaspura Gauri Kalan 426104 Gauri Kalan Power/Electrical Issue 23-Oct-2025 24-Oct-2025 Due to bad weather condition solar pumps not work efficien
337 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-23 Banda Jaspura Jaspura 426103 Jaspura Power/Electrical Issue 23-Oct-2025 24-Oct-2025 Due to bad weather condition solar pumps not work efficien
338 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-4 Banda Badokhar Khurd Mataundh(gramin) 426286 Mataundh(gramin) Local Repairing 23-Oct-2025 24-Oct-2025 network issue
339 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-8 Banda Badokhar Khurd Chamraha 426289 Jakhaura Local Repairing 23-Oct-2025 24-Oct-2025 network issue
340 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-52 Banda Tindwari Nari 426213 Nari Local Repairing 23-Oct-2025 24-Oct-2025 network issue
341 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-72 Banda Badokhar Khurd Palhari 426271 Palhari Road Widening[PWD] 25-Jun-2025 30-May-2026 Pipeline damaged by PWD during road widening. approx 1.6km and 60HSC.
342 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-4 Banda Badokhar Khurd Mataundh(gramin) 426286 Mataundh(gramin) Local Repairing 25-Sep-2025 26-Sep-2025 network issue
343 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-14 Banda Jaspura Baragaon 426132 Baragaon Local Repairing 25-Sep-2025 26-Sep-2025 netwotk isuue
344 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-15 Banda Jaspura Gadariya 426116 Gadariya Power/Electrical Issue 25-Sep-2025 26-Sep-2025 network issue
345 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-17 Banda Jaspura Gauri Kalan 426104 Gauri Kalan Power/Electrical Issue 25-Sep-2025 26-Sep-2025 Due to bad weather condition solar pumps not work efficient
346 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-23 Banda Jaspura Jaspura 426103 Jaspura Power/Electrical Issue 25-Sep-2025 26-Sep-2025 Due to bad weather condition solar pumps not work efficient
347 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-62 Banda Baberu Aliha 426361 Aliha Power/Electrical Issue 25-Sep-2025 26-Sep-2025 power outage
348 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-66 Banda Badokhar Khurd Karahiya 426240 Karahiya Power/Electrical Issue 25-Sep-2025 26-Sep-2025 power outage
349 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-17 Banda Jaspura Gauri Kalan 426104 Gauri Kalan Power/Electrical Issue 27-Aug-2025 28-Aug-2025 due to bad weather condition solar pumps not work efficient.
350 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-14 Banda Jaspura Baragaon 426132 Baragaon Power/Electrical Issue 27-Aug-2025 power fluctuations
351 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-45 Banda Baberu Umarahanee 426378 Umarahanee Damage Village Internal Works 27-Jan-2026 20-Mar-2026 Pipeline damaged by village pradhan
352 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-1 Banda Badokhar Khurd Marauli 426278 Marauli Power/Electrical Issue 27-Jul-2025 28-Jul-2025 Due to heavy rain, power outage
353 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-10 Banda Jaspura Padohara 426105 Padohara Power/Electrical Issue 27-Jul-2025 28-Jul-2025 Due to heavy rain, power outage
354 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-13 Banda Jaspura Ichhawar 426139 Ichhawar Local Repairing 27-Jul-2025 28-Jul-2025 Pump repairing work
355 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-15 Banda Jaspura Gadariya 426116 Gadariya Power/Electrical Issue 27-Jul-2025 28-Jul-2025 Due to heavy rain, power fluctuations
356 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-14 Banda Jaspura Baragaon 426132 Baragaon Power/Electrical Issue 27-Jul-2025 28-Jul-2025 power fluctuation due to heavy rain
357 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-17 Banda Jaspura Gauri Kalan 426104 Gauri Kalan Power/Electrical Issue 27-Jul-2025 28-Jul-2025 due to bad weather condition solar pumps not work efficient.
358 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-23 Banda Jaspura Jaspura 426103 Jaspura Power/Electrical Issue 27-Oct-2025 28-Oct-2025 Due to bad weather condition solar pumps not work efficient
359 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-28 Banda Jaspura Adari 426128 Adari Power/Electrical Issue 27-Oct-2025 28-Oct-2025 Due to bad weather condition solar pumps not work efficient
360 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-30 Banda Kamasin Kuchouli 426450 Kuchouli Power/Electrical Issue 27-Oct-2025 28-Oct-2025 Due to bad weather condition solar pumps not work efficient
361 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-4 Banda Badokhar Khurd Mataundh(gramin) 426286 Mataundh(gramin) Local Repairing 27-Oct-2025 28-Oct-2025 Network issue
362 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-8 Banda Badokhar Khurd Chamraha 426289 Jakhaura Local Repairing 27-Oct-2025 28-Oct-2025 NETWORK ISSUE
363 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-78 Banda Badokhar Khurd Pandui 426297 Pandui Local Repairing 27-Oct-2025 28-Oct-2025 Net work issue
364 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-19 Banda Jaspura Narjita 426123 Sikuwa Power/Electrical Issue 27-Oct-2025 28-Oct-2025 Due to bad weather condition solar pumps not work efficient
365 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-9 Banda Jaspura Madauli Kalan 426135 Madauli Kalan Power/Electrical Issue 27-Oct-2025 28-Oct-2025 Due to bad weather condition solar pumps not work efficient
366 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-11 Banda Jaspura Dandamau 426108 Dadamau Power/Electrical Issue 28-Aug-2025 29-Aug-2025 Network issue
367 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-14 Banda Jaspura Baragaon 426132 Baragaon Power/Electrical Issue 28-Aug-2025 29-Aug-2025 network issue
368 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-15 Banda Jaspura Gadariya 426116 Gadariya Power/Electrical Issue 28-Aug-2025 29-Aug-2025 Network isuue
369 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-17 Banda Jaspura Gauri Kalan 426104 Gauri Kalan Power/Electrical Issue 28-Aug-2025 29-Aug-2025 due to bad weather condition solar pumps not work efficient
370 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-47 Banda Baberu Para Bihari 426366 Koraree Power/Electrical Issue 28-Aug-2025 29-Aug-2025 33 KV Electrical line shunt down due to maintenance work purpose
371 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-50 Banda Tindwari Dhaunsar 426161 Dhaunsar Power/Electrical Issue 28-Aug-2025 29-Aug-2025 33 KV Electrical line shunt down due to maintenance work purpose
372 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-50 Banda Tindwari Dhaunsar 426161 Dhaunsar Power/Electrical Issue 28-Aug-2025 29-Aug-2025 33 KV Electrical line shunt down due to maintenance work purpose
373 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-60 Banda Badokhar Khurd Saimara 426247 Saimara Power/Electrical Issue 28-Aug-2025 29-Aug-2025 33 KV Electrical line shunt down due to maintenance work purpose
374 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-63 Banda Baberu Pista 426363 Pista Power/Electrical Issue 28-Aug-2025 29-Aug-2025 33 KV Electrical line shunt down due to maintenance work purpose
375 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-64 Banda Baberu Baroulee Azam 426371 Baroulee Azam Power/Electrical Issue 28-Aug-2025 29-Aug-2025 33 KV Electrical line shunt down due to maintenance work purpose
376 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-66 Banda Badokhar Khurd Karahiya 426240 Karahiya Power/Electrical Issue 28-Aug-2025 29-Aug-2025 33 KV Electrical line shunt down due to maintenance work purpose
377 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-74 Banda Badokhar Khurd Chhanehara Lalpur 426261 Chhanehara Lalpur Power/Electrical Issue 28-Aug-2025 29-Aug-2025 33 KV Electrical line shunt down due to maintenance work purpose
378 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-14 Banda Jaspura Baragaon 426132 Baragaon Power/Electrical Issue 28-Aug-2025 29-Aug-2025 power fluctuations
379 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-43 Banda Baberu Achhah 426327 Achhah Local Repairing 29-Aug-2025 30-Aug-2025 Due to D.I Raising Main Pipe Line Leakage Rectification Work Was Completed
380 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-45 Banda Baberu Santar 426375 Santar Local Repairing 29-Aug-2025 30-Aug-2025 Due to D.I Raising Main Pipe Line Leakage Rectification Work Was Completed
381 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-46 Banda Baberu Kayal 426377 Kayal Local Repairing 29-Aug-2025 30-Aug-2025 Due to D.I Raising Main Pipe Line Leakage Rectification Work Was Completed
382 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-47 Banda Baberu Para Bihari 426367 Para Bihari Local Repairing 29-Aug-2025 30-Aug-2025 Due to D.I Raising Main Pipe Line Leakage Rectification Work Was Completed
383 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-61 Banda Tindwari Godhani 426227 Godhani Local Repairing 29-Aug-2025 30-Aug-2025 Due to D.I Raising Main Pipe Line Leakage Rectification Work Was Completed
384 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-63 Banda Baberu Pista 426363 Pista Local Repairing 29-Aug-2025 30-Aug-2025 Due to D.I Raising Main Pipe Line Leakage Rectification Work Was Completed
385 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-67 Banda Tindwari Khaptiha Kalan 426217 Khaptiha Kalan Local Repairing 29-Aug-2025 30-Aug-2025 Due to D.I Raising Main Pipe Line Leakage Rectification Work Was Completed
386 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-72 Banda Badokhar Khurd Palhari 426271 Palhari Local Repairing 29-Aug-2025 30-Aug-2025 Due to D.I Raising Main Pipe Line Leakage Rectification Work Was Completed
387 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-73 Banda Badokhar Khurd Jaurahi 426251 Dadariya Local Repairing 29-Aug-2025 30-Aug-2025 Due to D.I Raising Main Pipe Line Leakage Rectification Work Was Completed
388 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-73 Banda Badokhar Khurd Jaurahi 426251 Dadariya Local Repairing 29-Aug-2025 30-Aug-2025 Due to D.I Raising Main Pipe Line Leakage Rectification Work Was Completed
389 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-74 Banda Badokhar Khurd Chhanehara Lalpur 426261 Chhanehara Lalpur Local Repairing 29-Aug-2025 30-Aug-2025 Due to D.I Raising Main Pipe Line Leakage Rectification Work Was Completed
390 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-77 Banda Badokhar Khurd Bandha Purwa 426296 Bandha Purwa Local Repairing 29-Aug-2025 30-Aug-2025 Due to D.I Raising Main Pipe Line Leakage Rectification Work Was Completed
391 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-75 Banda Badokhar Khurd Bharkhari 426265 Bharkhari Local Repairing 29-Aug-2025 30-Aug-2025 Due to D.I Raising Main Pipe Line Leakage Rectification Work Was Completed
392 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-77 Banda Badokhar Khurd Bandha Purwa 426296 Bandha Purwa Local Repairing 29-Aug-2025 30-Aug-2025 Due to D.I Raising Main Pipe Line Leakage Rectification Work Was Completed
393 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-79 Banda Badokhar Khurd Ganchha 426299 Kunwarpur Local Repairing 29-Aug-2025 30-Aug-2025 Due to D.I Raising Main Pipe Line Leakage Rectification Work Was Completed
394 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-80 Banda Badokhar Khurd Hateti Purwa 426295 Hateti Purwa Local Repairing 29-Aug-2025 30-Aug-2025 Due to D.I Raising Main Pipe Line Leakage Rectification Work Was Completed
395 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. 426245 Banda Badokhar Khurd Ladakapurwa 426274 Ladaka Purwa Local Repairing 29-Aug-2025 30-Aug-2025 Due to D.I Raising Main Pipe Line Leakage Rectification Work Was Completed
396 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-16 Banda Jaspura Amara 426118 Madauli Khurd Power/Electrical Issue 29-Aug-2025 30-Aug-2025 due to bad weather condition solar pumps not work efficient
397 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-23 Banda Jaspura Jaspura 426103 Jaspura Power/Electrical Issue 29-Aug-2025 30-Aug-2025 due to bad weather condition solar pumps not work efficient
398 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-25 Banda Jaspura Sikahula 426120 Sikahula Power/Electrical Issue 29-Aug-2025 30-Aug-2025 due to bad weather condition solar pumps not work efficient
399 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-4 Banda Badokhar Khurd Mataundh(gramin) 426286 Mataundh(gramin) Power/Electrical Issue 29-Aug-2025 30-Aug-2025 power fluctuations
400 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-15 Banda Jaspura Gadariya 426116 Gadariya Power/Electrical Issue 29-Aug-2025 30-Aug-2025 power fluctuations
401 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-64 Banda Baberu Nelathu 426372 Nelathu Damage Village Internal Works 30-Jan-2026 20-Mar-2026 Distribution pipeline damaged by Zilapa panchayat drainage work
402 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-12 Banda Jaspura Lasada 426126 Lasada Local Repairing 30-Jul-2025 31-Jul-2025 Motor rectification work
403 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-14 Banda Jaspura Baragaon 426132 Baragaon Power/Electrical Issue 30-Jul-2025 31-Jul-2025 Power outage due to heavy rain
404 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-15 Banda Jaspura Gadariya 426116 Gadariya Power/Electrical Issue 30-Jul-2025 31-Jul-2025 Due to heavy rain, power fluctuations
405 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-23 Banda Jaspura Jaspura 426103 Jaspura Power/Electrical Issue 30-Jul-2025 01-Aug-2025 due to bad weather condition solar pumps not work efficient.
406 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-24 Banda Jaspura Rampur 426110 Rampur Power/Electrical Issue 30-Jul-2025 31-Jul-2025 Due to heavy rain, power fluctuations
407 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-29 Banda Jaspura Khaptiha Khurd 426115 Khaptiha Khurd Power/Electrical Issue 30-Jul-2025 31-Jul-2025 Transformer terminal connection Rectification work.
408 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-4 Banda Badokhar Khurd Mataundh(gramin) 426286 Mataundh(gramin) Power/Electrical Issue 30-Jul-2025 31-Jul-2025 Due to heavy rain, power fluctuations
409 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-5 Banda Badokhar Khurd Goyara Mugali 426284 Goyara Mugali Power/Electrical Issue 30-Jul-2025 31-Jul-2025 Due to heavy rain, Network Issue
410 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-9 Banda Jaspura Madauli Kalan 426135 Madauli Kalan Power/Electrical Issue 30-Jul-2025 01-Aug-2025 due to bad weather condition solar pumps not work efficient.
411 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-33 Banda Tindwari Amli Kaur 426178 Amli Kaur Power/Electrical Issue 30-Jul-2025 31-Jul-2025 Due to heavy rain, power fluctuations
412 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-17 Banda Jaspura Gauri Kalan 426104 Gauri Kalan Power/Electrical Issue 31-Aug-2025 30-Aug-2025 due to bad weather condition solar pumps not work efficient
413 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. 426245 Banda Badokhar Khurd Bargahani 426243 Bargahani Power/Electrical Issue 31-Aug-2025 01-Sep-2025 yesterday data could not be updated on the jjm portal due to power outages at wtp
414 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. 426328 Banda Baberu Alampur 426356 Alampur Power/Electrical Issue 31-Aug-2025 01-Sep-2025 yesterday data could not be updated on the jjm portal due to power outages at wtp
415 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-34 Banda Tindwari Lohari 426164 Lohari Power/Electrical Issue 31-Aug-2025 01-Sep-2025 yesterday data could not be updated on the jjm portal due to power outages at wtp
416 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-36 Banda Baberu Badaulee 426343 Badaulee Power/Electrical Issue 31-Aug-2025 01-Sep-2025 yesterday data could not be updated on the jjm portal due to power outages at wtp
417 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-37 Banda Tindwari Barethi Kalan 426195 Barethi Kalan Power/Electrical Issue 31-Aug-2025 01-Sep-2025 yesterday data could not be updated on the jjm portal due to power outages at wtp
418 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-38 Banda Baberu Ban Baroulee 426312 Ban Baroulee Power/Electrical Issue 31-Aug-2025 01-Sep-2025 yesterday data could not be updated on the jjm portal due to power outages at wtp
419 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-39 Banda Baberu Mantha 426313 Mantha Power/Electrical Issue 31-Aug-2025 01-Aug-2025 yesterday data could not be updated on the jjm portal due to power outages at wtp
420 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-40 Banda Baberu Sanda 426305 Sanda Power/Electrical Issue 31-Aug-2025 01-Sep-2025 yesterday data could not be updated on the jjm portal due to power outages at wtp
421 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-42 Banda Baberu Baghela 426344 Baghela Power/Electrical Issue 31-Aug-2025 01-Sep-2025 yesterday data could not be updated on the jjm portal due to power outages at wtp
422 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-43 Banda Baberu Achhah 426327 Achhah Power/Electrical Issue 31-Aug-2025 01-Aug-2025 yesterday data could not be updated on the jjm portal due to power outages at wtp
423 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-43 Banda Baberu Achhah 426327 Achhah Power/Electrical Issue 31-Aug-2025 01-Sep-2025 yesterday data could not be updated on the jjm portal due to power outages at wtp
424 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-43 Banda Baberu Achhah 426327 Achhah Power/Electrical Issue 31-Aug-2025 01-Sep-2025 yesterday data could not be updated on the jjm portal due to power outages at wtp
425 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-45 Banda Baberu Santar 426375 Santar Power/Electrical Issue 31-Aug-2025 01-Sep-2025 yesterday data could not be updated on the jjm portal due to power outages at wtp
426 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-45 Banda Baberu Poon 426325 Poon Power/Electrical Issue 31-Aug-2025 01-Sep-2025 yesterday data could not be updated on the jjm portal due to power outages at wtp
427 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-46 Banda Baberu Kuchendo 426376 Kuchendo Power/Electrical Issue 31-Aug-2025 01-Sep-2025 yesterday data could not be updated on the jjm portal due to power outages at wtp
428 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-53 Banda Tindwari Dohatara 426184 Dohatara Power/Electrical Issue 31-Aug-2025 01-Sep-2025 yesterday data could not be updated on the jjm portal due to power outages at wtp
429 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-54 Banda Tindwari Chilla 426179 Chilla Power/Electrical Issue 31-Aug-2025 01-Sep-2025 yesterday data could not be updated on the jjm portal due to power outages at wtp
430 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-54 Banda Tindwari Chilla 426179 Chilla Power/Electrical Issue 31-Aug-2025 01-Sep-2025 yesterday data could not be updated on the jjm portal due to power outages at wtp
431 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-55 Banda Tindwari Niwaich 426210 Niwaich Power/Electrical Issue 31-Aug-2025 01-Sep-2025 yesterday data could not be updated on the jjm portal due to power outages at wtp
432 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-58 Banda Tindwari Bahinga 426156 Bahinga Power/Electrical Issue 31-Aug-2025 01-Sep-2025 yesterday data could not be updated on the jjm portal due to power outages at wtp
433 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-59 Banda Baberu Ragoulee 426350 Baghanda Power/Electrical Issue 31-Aug-2025 01-Sep-2025 yesterday data could not be updated on the jjm portal due to power outages at wtp
434 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-59 Banda Baberu Ragoulee 426350 Baghanda Power/Electrical Issue 31-Aug-2025 01-Sep-2025 yesterday data could not be updated on the jjm portal due to power outages at wtp
435 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-61 Banda Tindwari Bhujauli 426223 Bhujauli Power/Electrical Issue 31-Aug-2025 01-Sep-2025 yesterday data could not be updated on the jjm portal due to power outages at wtp
436 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-64 Banda Baberu Baroulee Azam 426371 Baroulee Azam Power/Electrical Issue 31-Aug-2025 01-Sep-2025 yesterday data could not be updated on the jjm portal due to power outages at wtp
437 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-59 Banda Baberu Ragoulee 426351 Maduva Power/Electrical Issue 31-Aug-2025 01-Sep-2025 yesterday data could not be updated on the jjm portal due to power outages at wtp
438 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-61 Banda Tindwari Bhujauli 426223 Bhujauli Power/Electrical Issue 31-Aug-2025 01-Sep-2025 yesterday data could not be updated on the jjm portal due to power outages at wtp
439 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-64 Banda Baberu Baroulee Azam 426371 Baroulee Azam Power/Electrical Issue 31-Aug-2025 01-Sep-2025 yesterday data could not be updated on the jjm portal due to power outages at wtp
440 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-66 Banda Tindwari Parsaunda 426201 Bachheura Power/Electrical Issue 31-Aug-2025 01-Sep-2025 yesterday data could not be updated on the jjm portal due to power outages at wtp
441 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-72 Banda Badokhar Khurd Gureh 426276 Gureh Power/Electrical Issue 31-Aug-2025 01-Sep-2025 yesterday data could not be updated on the jjm portal due to power outages at wtp
442 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-72 Banda Badokhar Khurd Gureh 426276 Gureh Power/Electrical Issue 31-Aug-2025 01-Sep-2025 yesterday data could not be updated on the jjm portal due to power outages at wtp
443 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-73 Banda Badokhar Khurd Jaurahi 426251 Dadariya Power/Electrical Issue 31-Aug-2025 01-Sep-2025 yesterday data could not be updated on the jjm portal due to power outages at wtp
444 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-74 Banda Badokhar Khurd Chhanehara Lalpur 426261 Chhanehara Lalpur Power/Electrical Issue 31-Aug-2025 01-Sep-2025 yesterday data could not be updated on the jjm portal due to power outages at wtp
445 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-75 Banda Badokhar Khurd Kurauli 426264 Bakchha Power/Electrical Issue 31-Aug-2025 01-Sep-2025 yesterday data could not be updated on the jjm portal due to power outages at wtp
446 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-75 Banda Badokhar Khurd Bharkhari 426265 Bharkhari Power/Electrical Issue 31-Aug-2025 01-Sep-2025 yesterday data could not be updated on the jjm portal due to power outages at wtp
447 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-77 Banda Badokhar Khurd Bandha Purwa 426296 Bandha Purwa Power/Electrical Issue 31-Aug-2025 01-Sep-2025 yesterday data could not be updated on the jjm portal due to power outages at wtp
448 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-77 Banda Badokhar Khurd Bandha Purwa 426296 Bandha Purwa Power/Electrical Issue 31-Aug-2025 01-Sep-2025 yesterday data could not be updated on the jjm portal due to power outages at wtp
449 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-79 Banda Badokhar Khurd Ganchha 426299 Kunwarpur Power/Electrical Issue 31-Aug-2025 01-Sep-2025 yesterday data could not be updated on the jjm portal due to power outages at wtp
450 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-80 Banda Badokhar Khurd Ganchha 426300 Ganchha Power/Electrical Issue 31-Aug-2025 01-Sep-2025 yesterday data could not be updated on the jjm portal due to power outages at wtp
451 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-1 Banda Badokhar Khurd Marauli 426278 Marauli Power/Electrical Issue 31-Aug-2025 01-Sep-2025 yesterday data could not be updated on the jjm portal due to power outages at wtp
452 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-14 Banda Jaspura Baragaon 426132 Baragaon Power/Electrical Issue 31-Aug-2025 01-Sep-2025 yesterday data could not be updated on the jjm portal due to power outages at wtp
453 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-17 Banda Jaspura Gauri Kalan 426104 Gauri Kalan Power/Electrical Issue 31-Aug-2025 01-Sep-2025 yesterday data could not be updated on the jjm portal due to power outages at wtp
454 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-21 Banda Jaspura Jhanjhari 426109 Jhanjhari Power/Electrical Issue 31-Aug-2025 01-Sep-2025 yesterday data could not be updated on the jjm portal due to power outages at wtp
455 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-23 Banda Jaspura Jaspura 426103 Jaspura Power/Electrical Issue 31-Aug-2025 01-Sep-2025 yesterday data could not be updated on the jjm portal due to power outages at wtp
456 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-28 Banda Jaspura Adari 426128 Adari Power/Electrical Issue 31-Aug-2025 01-Sep-2025 yesterday data could not be updated on the jjm portal due to power outages at wtp
457 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-29 Banda Jaspura Khaptiha Khurd 426115 Khaptiha Khurd Power/Electrical Issue 31-Aug-2025 01-Sep-2025 yesterday data could not be updated on the jjm portal due to power outages at wtp
458 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-3 Banda Badokhar Khurd Mataundh(gramin) 426286 Mataundh(gramin) Power/Electrical Issue 31-Aug-2025 01-Sep-2025 yesterday data could not be updated on the jjm portal due to power outages at wtp
459 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-4 Banda Badokhar Khurd Mataundh(gramin) 426286 Mataundh(gramin) Power/Electrical Issue 31-Aug-2025 01-Sep-2025 yesterday data could not be updated on the jjm portal due to power outages at wtp
460 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-5 Banda Badokhar Khurd Goyara Mugali 426284 Goyara Mugali Power/Electrical Issue 31-Aug-2025 01-Sep-2025 yesterday data could not be updated on the jjm portal due to power outages at wtp
461 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-6 Banda Badokhar Khurd Durendi 426293 Durendi Power/Electrical Issue 31-Aug-2025 01-Sep-2025 yesterday data could not be updated on the jjm portal due to power outages at wtp
462 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-7- Banda Badokhar Khurd Durendi 426293 Durendi Power/Electrical Issue 31-Aug-2025 01-Sep-2025 yesterday data could not be updated on the jjm portal due to power outages at wtp
463 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. 426245 Banda Badokhar Khurd Bargahani 426243 Bargahani Power/Electrical Issue 31-Aug-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
464 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. 426328 Banda Baberu Alampur 426356 Alampur Power/Electrical Issue 31-Aug-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
465 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-51 Banda Tindwari Bhindaura 426168 Bhindaura Power/Electrical Issue 31-Aug-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
466 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-53 Banda Tindwari Dighwat 426187 Dighwat Power/Electrical Issue 31-Aug-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
467 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-54 Banda Tindwari Chilla 426179 Chilla Power/Electrical Issue 31-Aug-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
468 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-55 Banda Tindwari Niwaich 426210 Niwaich Power/Electrical Issue 31-Aug-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
469 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-56 Banda Tindwari Kukuwa Khas 426215 Kukuwa Khas Power/Electrical Issue 31-Aug-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
470 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-58 Banda Tindwari Bahinga 426156 Bahinga Power/Electrical Issue 31-Aug-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
471 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-59 Banda Baberu Ragoulee 426350 Baghanda Power/Electrical Issue 31-Aug-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
472 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-60 Banda Badokhar Khurd Fatpurwa 426248 Fatpurwa Power/Electrical Issue 31-Aug-2025 02-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
473 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-61 Banda Tindwari Bhujauli 426223 Bhujauli Power/Electrical Issue 31-Aug-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
474 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-62 Banda Badokhar Khurd Maudaha 426256 Maudaha Power/Electrical Issue 31-Aug-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
475 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-62 Banda Badokhar Khurd Bilbai 426255 Bilbai Power/Electrical Issue 31-Aug-2025 02-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
476 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-63 Banda Baberu Ghan Saul 426364 Janvara Power/Electrical Issue 31-Aug-2025 01-Feb-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
477 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-64 Banda Baberu Shiv 426370 Mavae Junnardar Power/Electrical Issue 31-Aug-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
478 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-65 Banda Tindwari Mahui 426209 Gohurwa Power/Electrical Issue 31-Aug-2025 02-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
479 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-66 Banda Tindwari Parsaunda 426201 Bachheura Power/Electrical Issue 31-Aug-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
480 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-67 Banda Tindwari Khairei 426218 Khairei Power/Electrical Issue 31-Aug-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
481 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-68 Banda Badokhar Khurd Luktara 426229 Luktara Power/Electrical Issue 31-Aug-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
482 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-69 Banda Badokhar Khurd Chheharao 426231 Chheharao Power/Electrical Issue 31-Aug-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
483 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-70 Banda Badokhar Khurd Chahitara 426235 Chahitara Power/Electrical Issue 31-Aug-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
484 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-71 Banda Badokhar Khurd Chakchatgan 426233 Chakchatgan Power/Electrical Issue 31-Aug-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
485 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-72 Banda Badokhar Khurd Gureh 426276 Gureh Power/Electrical Issue 31-Aug-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
486 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-73 Banda Badokhar Khurd Jaurahi 426252 Jaurahi Power/Electrical Issue 31-Aug-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
487 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-74 Banda Badokhar Khurd Doha 426254 Doha Power/Electrical Issue 31-Aug-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
488 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-75 Banda Badokhar Khurd Kurauli 426264 Bakchha Power/Electrical Issue 31-Aug-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
489 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-76 Banda Badokhar Khurd Barokhar Khurd 426269 Barokhar Khurd Power/Electrical Issue 31-Aug-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
490 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-77 Banda Badokhar Khurd Bandha Purwa 426296 Bandha Purwa Power/Electrical Issue 31-Aug-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
491 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-78 Banda Mahua Madhopur 426622 Madhopur Power/Electrical Issue 31-Aug-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
492 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-79 Banda Badokhar Khurd Ganchha 426299 Kunwarpur Power/Electrical Issue 31-Aug-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
493 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-1 Banda Badokhar Khurd Marauli 426278 Marauli Power/Electrical Issue 31-Aug-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
494 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-14 Banda Jaspura Baragaon 426132 Baragaon Power/Electrical Issue 31-Aug-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
495 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-17 Banda Jaspura Gauri Kalan 426104 Gauri Kalan Power/Electrical Issue 31-Aug-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
496 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-22 Banda Jaspura Barehta 426119 Barehta Power/Electrical Issue 31-Aug-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
497 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-23 Banda Jaspura Jaspura 426103 Jaspura Power/Electrical Issue 31-Aug-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
498 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-23 Banda Jaspura Jaspura 426103 Jaspura Power/Electrical Issue 31-Aug-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
499 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-24 Banda Jaspura Rampur 426110 Rampur Power/Electrical Issue 31-Aug-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
500 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-27 Banda Jaspura Amara 426117 Amara Power/Electrical Issue 31-Aug-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
501 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-28 Banda Jaspura Adari 426128 Adari Power/Electrical Issue 31-Aug-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
502 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-29 Banda Jaspura Khaptiha Khurd 426115 Khaptiha Khurd Power/Electrical Issue 31-Aug-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
503 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-32 Banda Baberu Jalalpur 426341 Gaura Power/Electrical Issue 31-Aug-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
504 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-33 Banda Tindwari Amli Kaur 426178 Amli Kaur Power/Electrical Issue 31-Aug-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
505 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-33 Banda Tindwari Amli Kaur 426178 Amli Kaur Power/Electrical Issue 31-Aug-2025 02-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
506 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-36 Banda Baberu Badaulee 426343 Badaulee Power/Electrical Issue 31-Aug-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
507 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-37 Banda Tindwari Bambiya 426196 Bambiya Power/Electrical Issue 31-Aug-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
508 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-38 Banda Baberu Ban Baroulee 426312 Ban Baroulee Power/Electrical Issue 31-Aug-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
509 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-40 Banda Baberu Sanda 426305 Sanda Power/Electrical Issue 31-Aug-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
510 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-41 Banda Baberu Arthara 426319 Arthara Power/Electrical Issue 31-Aug-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
511 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-43 Banda Baberu Achhah 426327 Achhah Power/Electrical Issue 31-Aug-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
512 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-41 Banda Baberu Tharthuwa 426334 Guroulee Sukla Power/Electrical Issue 31-Aug-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
513 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-43 Banda Baberu Achhah 426327 Achhah Power/Electrical Issue 31-Aug-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
514 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-45 Banda Baberu Santar 426375 Santar Power/Electrical Issue 31-Aug-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
515 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-46 Banda Baberu Kayal 426377 Kayal Power/Electrical Issue 31-Aug-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
516 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-47 Banda Baberu Para Bihari 426366 Koraree Power/Electrical Issue 31-Aug-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
517 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-48 Banda Tindwari Bambiya 426197 Bhadauli Power/Electrical Issue 31-Aug-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
518 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-50 Banda Tindwari Bhujrakh 426160 Bhujrakh Power/Electrical Issue 31-Aug-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
519 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-47 Banda Baberu Murwal 426359 Murwal Damage Village Internal Works 31-Jan-2026 20-Mar-2026 Pipeline and FHTC damaged by village pradhan during village road work