| 1 |
20100572 |
BARAI PARA W/S SCHEME |
20100572/01 |
Ghazipur |
Manihari |
Barai Para |
471745 |
Barai Para |
Road Widening |
12-Feb-2026 |
|
At the time of construction of road drain by PWD department HDPE pipeline damaged of dia 63mm - 250 Mtr. |
| 2 |
20100572 |
BARAI PARA W/S SCHEME |
20100572/01 |
Ghazipur |
Manihari |
Barai Para |
471745 |
Barai Para |
Road Widening |
19-Mar-2026 |
|
The scheme was under O&M, and regular water supply was functioning smoothly up to 18-03-2026. However, on 19-03-2026, the HDPE pipeline of 63 mm diameter (368 Rmt) was damaged by the PWD department during drainage construction work on both sides of the road. As a result, 56 Nos. of FHTCs were damaged, along with 215 Rmt of MDPE pipeline. Due to this damage, we are currently unable to resume regular water supply. If the supply is started, water flows onto the road due to the damaged pipelines. |
| 3 |
20100572 |
BARAI PARA W/S SCHEME |
20100572/01 |
Ghazipur |
Manihari |
Barai Para |
471745 |
Barai Para |
Road Widening |
19-Mar-2026 |
|
The scheme was under trial run phase, and regular water supply was functioning smoothly up to 18-03-2026. However, on 19-03-2026, the HDPE pipeline of 63 mm diameter (368 Rmt) was damaged by the PWD department during drainage construction work on both sides of the road. As a result, 56 Nos. of FHTCs were damaged, along with 215 Rmt of MDPE pipeline. Due to this damage, we are currently unable to resume regular water supply. If the supply is started, water flows onto the road due to the damaged pipelines. |