| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 1732401 | Name of Scheme: Bhutrada PWS | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 8000 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 31-Dec-2024 | Actual Date of Completion (Capex): 20-Dec-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | 200 mm | 48 mtr plain pipe | oht campus | 29.45779 | 77.42574 |
| 2 | 200 mm | 42 mtr strainer | oht campus | 29.45779 | 77.42574 |
| 3 | 300 mm | 60 mtr plain pipe | oht campus | 29.45779 | 77.42574 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | 35 hp pump | 1550 lpm/ 53mtr | oht campus | 29.45779 | 77.4257415 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | existing concrete oht | 400 kl/ 15 mtr | oht campus | 29.45779 | 77.42574 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI k9 PIPE | 150 | 30 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 90 | 0.886 | |
| 2 | HDPE | 75 | 5.823 | |
| 3 | HDPE | 63 | 5.32778 | |
| 4 | HDPE | 110 | 0.598 | |
| 5 | HDPE | 125 | 0.375 | |
| 6 | HDPE | 160 | 0.137 | |
| 7 | HDPE | 180 | 0.131 | |
| 8 | HDPE | 200 | 0.0182 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 1533 |