Project Completion Certificate (Ground Water)
Scheme ID: 20000029 Name of Scheme: JAPRA No. of Villages: 1 No. of Habitation Covered: 5
Total Population Covered: 5078 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 29-Apr-2023 Actual Date of Completion (Capex): 10-Oct-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewells 26.98Mtr/ 117.86Mtr JAPRA 27.446346 80.269591
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 1.1 M³ per Min /45Mtr JAPRA 27.446346 80.269591
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 350KL/ 16Mtr JAPRA 27.471387 80.207207
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. Pipe 200 0.02164
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6, Class PE-100 63 3.868
2 HDPE Pipe PN-6, Class PE-100 75 5.290
3 HDPE Pipe PN-6, Class PE-100 90 1.619
4 HDPE Pipe PN-6, Class PE-100 110 0.423
5 HDPE Pipe PN-6, Class PE-100 125 0.997
6 HDPE Pipe PN-6, Class PE-100 160 1.477
7 HDPE Pipe PN-6, Class PE-100 200 0.524
HSC Connection
Sno. Total Nos.
Other Details
3.09
0.00
3.01
09-Jan-2024
06-May-2025