Project Completion Certificate (Ground Water)
Scheme ID: 20000039 Name of Scheme: KUIYAN No. of Villages: 1 No. of Habitation Covered: 3
Total Population Covered: 2180 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 29-Apr-2023 Actual Date of Completion (Capex): 12-Jun-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewells 18.01Mtr/ 114.39 Mtr KUIYAN 27.575845 80.174257
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 0.5 M³ per Min /45Mtr KUIYAN 27.575845 80.174257
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 150KL/ 12Mtr KUIYAN 27.57579 80.17406
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D. I Pipe 150 0.0184
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6 63 2.503
2 HDPE Pipe PN-6 75 1.945
3 HDPE Pipe PN-6 90 2.167
4 HDPE Pipe PN-6 110 0.221
5 HDPE Pipe PN-6 140 0.332
6 HDPE Pipe PN-6 160 0.012
HSC Connection
Sno. Total Nos.
1 283
Other Details
2.02
0.00
1.98
11-Sep-2023
24-Dec-2024