| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20000040 | Name of Scheme: CHATHIYA DHAFRAPUR | No. of Villages: 2 | No. of Habitation Covered: 4 |
| Total Population Covered: 2030 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 29-Apr-2023 | Actual Date of Completion (Capex): 01-Jun-2023 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewells | 18.03 Mtr/ 101.35 Mtr | CHATHIYA DHAFRAPUR | 27.347737 | 80.428698 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | 0.5 M³ Per Min /45Mtr | CHATHIYA DHAFRAPUR | 27.347737 | 80.428698 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 150KL/ 16Mtr | CHATHIYA DHAFRAPUR | 27.347744 | 80.428474 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D.I. Pipe | 150 | 0.02026 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE Pipe PN-6 | 63 | 3.411 | |
| 2 | HDPE Pipe PN-6 | 75 | 1.909 | |
| 3 | HDPE Pipe PN-6 | 90 | 0.242 | |
| 4 | HDPE Pipe PN-6 | 110 | 1.6 | |
| 5 | HDPE Pipe PN-6 | 140 | 0.195 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 314 |