Project Completion Certificate (Ground Water)
Scheme ID: 20000047 Name of Scheme: ANT SANT No. of Villages: 1 No. of Habitation Covered: 5
Total Population Covered: 5606 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 29-Apr-2023 Actual Date of Completion (Capex): 01-Jan-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 33.99 M/ 117.91 M ANT SANT 27.262798 80.391756
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 1.250 M³ per Min /45Mtr ANT SANT 27.262798 80.391756
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 400 KL/ 20 Mtr ANT SANT 27.263014 80.391893
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D. I. Pipe 200 0.02514
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6, Class PE-100 63 6.2736
2 HDPE Pipe PN-6, Class PE-100 75 3.6027
3 HDPE Pipe PN-6, Class PE-100 90 3.1346
4 HDPE Pipe PN-6, Class PE-100 110 3.0869
5 HDPE Pipe PN-6, Class PE-100 125 0.2988
6 HDPE Pipe PN-6, Class PE-100 160 1.3502
7 HDPE Pipe PN-6, Class PE-100 180 1.5068
8 HDPE Pipe PN-6, Class PE-100 200 0.9773
HSC Connection
Sno. Total Nos.
1 720
Other Details
4.47
0.00
4.24
31-Mar-2023
24-Dec-2024