Project Completion Certificate (Ground Water)
Scheme ID: 20000049 Name of Scheme: CHANDELI No. of Villages: 1 No. of Habitation Covered: 6
Total Population Covered: 4780 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 29-Apr-2023 Actual Date of Completion (Capex): 02-Feb-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 30.02M/ 114.05M CHANDELI 27.597135 80.121025
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 1.100 M³ per Min /45Mtr CHANDELI 27.597135 80.121025
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 350KL/ 14Mtr CHANDELI 27.597023 80.121192
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D. I. Pipe 200 0.02224
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6, Class PE-100 63 7.1385
2 HDPE Pipe PN-6, Class PE-100 75 3.675
3 HDPE Pipe PN-6, Class PE-100 90 6.054
4 HDPE Pipe PN-6, Class PE-100 110 2.021
5 HDPE Pipe PN-6, Class PE-100 125 0.358
6 HDPE Pipe PN-6, Class PE-100 140 0.154
7 HDPE Pipe PN-6, Class PE-100 160 1.261
8 HDPE Pipe PN-6, Class PE-100 200 0.078
HSC Connection
Sno. Total Nos.
1 608
Other Details
3.70
0.00
3.62
01-May-2024
24-Dec-2024