| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20000765 | Name of Scheme: Harar Fatehpur WSS | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 7727 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 31-Dec-2023 | Actual Date of Completion (Capex): 02-Feb-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | 300 MM PLAIN | 120 MTR PLAIN | OHT CAMPUS | 29.55291 | 77.39387 |
| 2 | 200 MM PLAIN | 120 MTR PLAIN | OHT CAMPUS | 29.55291 | 77.39387 |
| 3 | 200 MM SLOTTED | 60 MTR SLOTTED STRAINER | OHT CAMPUS | 29.55291 | 77.39387 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | 17.5 HP | 750 LPM/ 53 MTR HEAD | OHT CAMPUS | 29.55291 | 77.39387 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | CONCRETE | 250 KL/ 12 MTR | OHT CAMPUS | 29.55291 | 77.39387 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI K9 | 150 | 0.06 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 17.06 | 17060 MTR |
| 2 | HDPE | 75 | 1.042 | 1042 MTR |
| 3 | HDPE | 90 | 1.081 | 1081 MTR |
| 4 | HDPE | 110 | 0.562 | 562 MTR |
| 5 | HDPE | 140 | 0.057 | 57 MTR |
| 6 | HDPE | 160 | 0.149 | 149 MTR |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 1375 |