Project Completion Certificate (Ground Water)
Scheme ID: 20000765 Name of Scheme: Harar Fatehpur WSS No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 7727 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2023 Actual Date of Completion (Capex): 02-Feb-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 300 MM PLAIN 120 MTR PLAIN OHT CAMPUS 29.55291 77.39387
2 200 MM PLAIN 120 MTR PLAIN OHT CAMPUS 29.55291 77.39387
3 200 MM SLOTTED 60 MTR SLOTTED STRAINER OHT CAMPUS 29.55291 77.39387
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 17.5 HP 750 LPM/ 53 MTR HEAD OHT CAMPUS 29.55291 77.39387
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 CONCRETE 250 KL/ 12 MTR OHT CAMPUS 29.55291 77.39387
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K9 150 0.06
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 17.06 17060 MTR
2 HDPE 75 1.042 1042 MTR
3 HDPE 90 1.081 1081 MTR
4 HDPE 110 0.562 562 MTR
5 HDPE 140 0.057 57 MTR
6 HDPE 160 0.149 149 MTR
HSC Connection
Sno. Total Nos.
1 1375
Other Details
480.52
430.28
430.28
01-Dec-2024
01-Dec-2024