Project Completion Certificate (Ground Water)
Scheme ID: 20002127 Name of Scheme: Etaye No. of Villages: 2 No. of Habitation Covered: 8
Total Population Covered: 2670 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 22-May-2023 Actual Date of Completion (Capex): 21-Mar-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well -300X150 26.16/212.91 Etaye 25.577668333333335 82.66019
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Pump-15HP 600/47.90 Etaye 25.577668333333335 82.66019
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 175KL-12M Etaye 25.577650000000002 82.66016999999998
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-9 150 0.029
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN-6 160 0.036
2 HDPE PIPE PN-6 140 0.581
3 HDPE PIPE PN-6 110 0.372
4 HDPE PIPE PN-6 90 0.419
5 HDPE PIPE PN-6 75 0.624
6 HDPE PIPE PN-6 63 8.830
HSC Connection
Sno. Total Nos.
1 355
Other Details
2.26
2.09
2.01
21-Mar-2026
22-Mar-2026