| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20008678 | Name of Scheme: Banta Kamalpur | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 2160 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 05-Mar-2023 | Actual Date of Completion (Capex): 01-Dec-2022 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewells | 24.08Mtr/ 96.38Mtr | Banta Kamalpur | 26.404661 | 80.374211 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | 0.5 M³ Per Min /42Mtr | Banta Kamalpur | 26.404661 | 80.374211 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 150KL/ 12Mtr | Banta Kamalpur | 26.404458 | 80.374276 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D.I. Pipe | 150 | 0.02726 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE Pipe PN-6, Class PE-100 | 63 | 2.162 | |
| 2 | HDPE Pipe PN-6, Class PE-100 | 75 | 3.148 | |
| 3 | HDPE Pipe PN-6, Class PE-100 | 90 | 0.383 | |
| 4 | HDPE Pipe PN-6, Class PE-100 | 110 | 0.340 | |
| 5 | HDPE Pipe PN-6, Class PE-100 | 125 | 0.363 | |
| 6 | HDPE Pipe PN-6, Class PE-100 | 140 | 0.029 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 334 |