Project Completion Certificate (Ground Water)
Scheme ID: 20008680 Name of Scheme: Hardiha No. of Villages: 6 No. of Habitation Covered: 9
Total Population Covered: 4430 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 07-Jan-2022 Actual Date of Completion (Capex): 30-May-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL WORK 145 HARDIHA JALLAPUR 26.4074496 83.00432562
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMRSIBLE PUMP 43.7 HARDIHA JALLAPUR 26.4074496 83.00432562
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 ZINC ALUMINIUM 300/14 HARDIHA JALLAPUR 26.4074496 83.00432562
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K9 200 30 YES
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 10805 YES
2 HDPE 90 963 YES
3 HDPE 90 1315 YES
4 HDPE 110 1293 YES
5 HDPE 140 1812 YES
6 HDPE 160 1133 YES
7 HDPE 200 105 YES
HSC Connection
Sno. Total Nos.
1 450
Other Details
309.27
309.27
309.27
27-Jan-2025
28-Jan-2025