| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20008736 | Name of Scheme: Jalalpur Sabakpur | No. of Villages: 2 | No. of Habitation Covered: 4 |
| Total Population Covered: 4808 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 07-Jul-2023 | Actual Date of Completion (Capex): 30-Jun-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 30/52.62 | Jallalpur Sabukpur | 26.518661 | 82.75332824 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | VT Pump | 1000 | Jallalpur Sabukpur | 26.518661 | 82.75332824 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI K-9 | 200 | 30 | COMPLETED |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PN-6 | 63 | 19.705 | |
| 2 | HDPE PN-6 | 75 | 3.091 | |
| 3 | HDPE PN-6 | 90 | 2.334 | |
| 4 | HDPE PN-6 | 110 | 1.818 | |
| 5 | HDPE PN-6 | 140 | 1.44 | |
| 6 | HDPE PN-6 | 200 | 0.19 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 718 |