| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20008823 | Name of Scheme: Daredeha | No. of Villages: 2 | No. of Habitation Covered: 2 |
| Total Population Covered: 4095 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 07-Jul-2023 | Actual Date of Completion (Capex): 11-Feb-2026 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 24 /50.96 | Dare Deeha | 26.41296445 | 82.37836338 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | VT Pump -1 | 950 LPM | Dare Deeha | 26.41296445 | 82.37836338 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 250 KL / 16 mtr | Dare Deeha | 26.41296445 | 82.37836338 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI K-9 | 200 | 18 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PN-6 | 63 | 9.386 | |
| 2 | HDPE PN-6 | 75 | 1.97 | |
| 3 | HDPE PN-6 | 90 | 1.628 | |
| 4 | HDPE PN-6 | 110 | 1.088 | |
| 5 | HDPE PN-6 | 140 | 1.89 | |
| 6 | HDPE PN-6 | 160 | 0.224 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |