Project Completion Certificate (Ground Water)
Scheme ID: 20009529 Name of Scheme: BEL SCHEME No. of Villages: 2 No. of Habitation Covered: 10
Total Population Covered: 5078 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 09-Apr-2023 Actual Date of Completion (Capex): 10-Jun-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 23.94 M / 128.85 M BEL 27.930117 80.648082
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 1100 LPM / 45 M BEL 27.930117 80.648082
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 300 Kl / 15M BEL 27.930117 80.648082
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. Pipe ?-7 150 0.022
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 160 0.3264
2 HDPE Pipe PN-6: Class PE-100 140 0.8123
3 HDPE Pipe PN-6: Class PE-100 110 1.253
4 HDPE Pipe PN-6: Class PE-100 90 2.3415
5 HDPE Pipe PN-6: Class PE-100 75 0.867
6 HDPE Pipe PN-6: Class PE-100 63 11.1621
HSC Connection
Sno. Total Nos.
1 822
Other Details
2.65
3.16
3.16
09-Sep-2023
20-Nov-2024