| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20009558 | Name of Scheme: Sonbarasa Gram Panchayat Water Supply Scheme | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 2075 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 31-Dec-2024 | Actual Date of Completion (Capex): 26-Jul-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 17/118.9 | Sonbarsha | 27.045883 | 83.424392 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | VT Pump | 450 LPM/39 Mtr | Sonbarsha | 27.045883 | 83.424392 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI K-7 | 100 | .006 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 3.841 | |
| 2 | HDPE | 75 | .826 | |
| 3 | HDPE | 90 | .284 | |
| 4 | HDPE | 110 | .103 | |
| 5 | HDPE | 140 | .144 | |
| 6 | HDPE | 160 | .017 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 335 |