Project Completion Certificate (Ground Water)
Scheme ID: 20009647 Name of Scheme: LAGUCHA No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 5112 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 09-Apr-2023 Actual Date of Completion (Capex): 15-Aug-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 42.2 m / 107.88 M LAGUCHA 27.827441 80.827802
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 1100 LPM / 45 M LAGUCHA 27.827441 80.827802
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 300 KL/ 15 M LAGUCHA 27.827441 80.827802
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. Pipe ?-7 125 0.0345
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 200 0.3736
2 HDPE Pipe PN-6: Class PE-100 160 0.0694
3 HDPE Pipe PN-6: Class PE-100 140 0.8292
4 HDPE Pipe PN-6: Class PE-100 110 0.9149
5 HDPE Pipe PN-6: Class PE-100 90 0.8758
6 HDPE Pipe PN-6: Class PE-100 63 5.6511
HSC Connection
Sno. Total Nos.
1 899
Other Details
2.52
2.84
2.84
15-Aug-2023
19-Nov-2024