| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20009677 | Name of Scheme: SULTANPUR | No. of Villages: 1 | No. of Habitation Covered: 4 |
| Total Population Covered: 2444 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 09-May-2023 | Actual Date of Completion (Capex): 23-Jan-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | 200 MM x 150 MM | 27.17 / 116.5 | Sultanpur | 25.394252 | 83.043965 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible Pump (10 HP) | 510 / 37 | Sultanpur | 25.394252 | 83.043965 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 150 / 12 | Sultanpur | 25.394252 | 83.043965 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 100 | 30 | - |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 3768.00 | - |
| 2 | HDPE | 75 | 560.00 | - |
| 3 | HDPE | 90 | 209.00 | - |
| 4 | HDPE | 110 | 121.00 | - |
| 5 | HDPE | 160 | 99.00 | - |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 368 |