| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20009809 | Name of Scheme: PACHRUKHI Gram Panchayat Water Supply Scheme | No. of Villages: 1 | No. of Habitation Covered: 11 |
| Total Population Covered: 3440 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 30-Jul-2024 | Actual Date of Completion (Capex): 30-Jul-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 15 Mtr/ 135.86 Mtr | Pachrukhi | 27.091096 | 83.236854 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible Pump | 300LPM/39 Mtr | Pachrukhi | 27.091096 | 83.236854 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 100 KL/ 12 Mtr | Pachrukhi | 27.091096 | 83.236854 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 100 | 0.0271 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 5.23 | |
| 2 | HDPE | 75 | .257 | |
| 3 | HDPE | 90 | .446 | |
| 4 | HDPE | 110 | 1.91 | |
| 5 | HDPE | 140 | .533 | |
| 6 | HDPE | 160 | .919 | |
| 7 | HDPE | 200 | .337 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 530 |