Scheme ID: 20010582 Name of Scheme: Nipaniya W/S No. of Villages: 2 No. of Habitation Covered: 4
Total Population Covered: 2350 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 14-Jun-2023 Actual Date of Completion (Capex): 05-Apr-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewells 24Mtr/ 119.22Mtr NIPANIA 27.645598 80.21844
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 0.053 M3/Min /45Mtr NIPANIA 27.645598 80.21844
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 150KL/ 16Mtr NIPANIA 27.645598 80.21844
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. Pipe 150 0.02566
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6 Class PE-100 63 1.4495
2 HDPE Pipe PN-6 Class PE-100 75 1.4246
3 HDPE Pipe PN-6 Class PE-100 90 3.2381
4 HDPE Pipe PN-6 Class PE-100 110 0.196
5 HDPE Pipe PN-6 Class PE-100 125 0.844
6 HDPE Pipe PN-6 Class PE-100 140 1.4423
7 HDPE Pipe PN-6 Class PE-100 160 0.050
HSC Connection
Sno. Total Nos.
1 450
Other Details
2.43
2.10
2.10
06-Jul-2023
30-Nov-2024