Project Completion Certificate (Ground Water)
Scheme ID: 20010589 Name of Scheme: HARAIYA No. of Villages: 4 No. of Habitation Covered: 14
Total Population Covered: 5001 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 22-May-2023 Actual Date of Completion (Capex): 16-Feb-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 24.2 /55.2 Haraiya 26.43898969 82.75336848
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Pump -1 1100 Haraiya 26.43898969 82.75336848
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 300KL/16mtr Haraiya 26.43898969 82.75336848
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-9 200 0.2
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PN-6 63 9.653
2 HDPE PN-6 75 1.587
3 HDPE PN-6 90 1.308
4 HDPE PN-6 110 1.238
5 HDPE PN-6 140 1.24
6 HDPE PN-6 160 0.388
7 HDPE PN-6 200 1.180
HSC Connection
Sno. Total Nos.
1 596
Other Details
3.09
3.68
2.95
09-Jan-2026
16-Feb-2026