Project Completion Certificate (Ground Water)
Scheme ID: 20010672 Name of Scheme: SAIDPUR BHAU SCHEME No. of Villages: 1 No. of Habitation Covered: 3
Total Population Covered: 4945 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 09-Apr-2023 Actual Date of Completion (Capex): 10-Jan-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewells 33 M / 105 M Saidapur Bhau 27.987113 80.69902
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 1000 LMP / 45 M Saidapur Bhau 27.987113 80.69902
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 300 KL / 15 M Saidapur Bhau 27.987113 80.69902
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. Pipe 125 0.03
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 160 mm dia HDPE Pipe PN-6: Class PE-100 160 0.272
2 140 mm dia HDPE Pipe PN-6: Class PE-100 140 1.069
3 110 mm dia HDPE Pipe PN-6: Class PE-100 110 1.128
4 90 mm dia HDPE Pipe PN-6: Class PE-100 90 1.002
5 63 mm dia HDPE Pipe PN-6: Class PE-100 63 7.2302
HSC Connection
Sno. Total Nos.
1 750