Project Completion Certificate (Ground Water)
Scheme ID: 20010697 Name of Scheme: BAN BUDHELI SCHEME No. of Villages: 2 No. of Habitation Covered: 4
Total Population Covered: 3644 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 09-Apr-2023 Actual Date of Completion (Capex): 05-Mar-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 30 M / 101 M BAN BUDHELI 28.06651 80.351571
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 750 LPM / 44 M BAN BUDHELI 28.06651 80.351571
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 225 KL / 14M BAN BUDHELI 28.06651 80.351571
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. Pipe ?-7 100 0.030
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 140 0.146
2 HDPE Pipe PN-6: Class PE-100 110 0.878
3 HDPE Pipe PN-6: Class PE-100 90 0.2495
4 HDPE Pipe PN-6: Class PE-100 63 4.8639
HSC Connection
Sno. Total Nos.
1 330
Other Details
2.08
1.94
1.94
05-Jun-2024
19-Nov-2024