Project Completion Certificate (Ground Water)
Scheme ID: 20010704 Name of Scheme: HINDOLNA SCHEME No. of Villages: 2 No. of Habitation Covered: 4
Total Population Covered: 3795 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 09-Apr-2023 Actual Date of Completion (Capex): 10-Nov-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 34.15 M / 108.90 M Hindolna 28.136771 80.67205
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 850 LMP / 43 M Hindolna 28.136771 80.67205
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 225 KL / 43 M Hindolna 28.136771 80.67205
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. Pipe 150 0.016
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 160 mm dia HDPE Pipe PN-6: Class PE-100 160 0.119
2 140 mm dia HDPE Pipe PN-6: Class PE-100 140 0.472
3 110 mm dia HDPE Pipe PN-6: Class PE-100 110 2.004
4 90 mm dia HDPE Pipe PN-6: Class PE-100 90 1.1603
5 75 mm dia HDPE Pipe PN-6: Class PE-100 75 0.2517
6 63 mm dia HDPE Pipe PN-6: Class PE-100 63 12.704
HSC Connection
Sno. Total Nos.
1 483
Other Details
253.37
0.00
263.68
10-Nov-2023
19-Nov-2024