| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20010845 | Name of Scheme: MOHAMMADPUR BHAJA VILLAGE WATER SCHEME | No. of Villages: 2 | No. of Habitation Covered: 2 |
| Total Population Covered: 2248 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 15-May-2023 | Actual Date of Completion (Capex): 01-Jul-2023 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 15.3/72.15 | Nawadia Bhagat | 28°16'44.9"N | 79°44'46.9"E |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible Pump | 28/36 | Nawadia Bhagat | 28°16'44.9"N | 79°44'46.9"E |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | Over Head Tank | 150/12 | Nawadia Bhagat | 28°16'45.4"N | 79°44'46.4"E |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 125 | 28 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE Pipe | 63 | 2.948 | |
| 2 | HDPE Pipe | 75 | .47 | |
| 3 | HDPE Pipe | 90 | .482 | |
| 4 | HDPE Pipe | 125 | .208 | |
| 5 | HDPE Pipe | 140 | 1.034 | |
| 6 | HDPE Pipe | 160 | .205 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 412 |