Project Completion Certificate (Ground Water)
Scheme ID: 20010884 Name of Scheme: Luduhi G P Water Supply Scheme No. of Villages: 2 No. of Habitation Covered: 6
Total Population Covered: 1844 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 09-Feb-2024 Actual Date of Completion (Capex): 01-Apr-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Strainer (m) 24 TW 26.073749 83.627782
2 Plain Pipe (m) 179 TW 26.073749 83.627782
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 400/46 TW 26.073749 83.627782
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC 100/12 OHT 26.073881 83.627791
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 100 50
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PN6 PE100 63 8.3
2 HDPE PN6 PE100 75 1.2
3 HDPE PN6 PE100 90 0.7
4 HDPE PN6 PE100 110 0.12
5 HDPE PN6 PE100 140 0.12
HSC Connection
Sno. Total Nos.
1 264
Other Details
2.34
2.09
0.00
01-Apr-2025
02-Apr-2025