| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20010897 | Name of Scheme: AHMADPURI URF AMANPURI | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 2364 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 31-Dec-2024 | Actual Date of Completion (Capex): 11-Feb-2023 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 25.6 Mtr / 96.43 Mtr | AHMADPURI URF AMANPURI | 28.940618 | 77.959884 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | 500 LPM / 50 Mtr | AHMADPURI URF AMANPURI | 28.940618 | 77.959884 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 150 Kl / 12 M | AHMADPURI URF AMANPURI | 28.940618 | 77.959884 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 150 | 0.019 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 5.014 | |
| 2 | HDPE | 90 | 0.386 | |
| 3 | HDPE | 110 | 0.181 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 439 |