Project Completion Certificate (Ground Water)
Scheme ID: 20010902 Name of Scheme: GEJHA No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 3540 Base Year: 2022 Intermediate Year: 2019 Design Year: 2052
Date of Completion (As per Contract): 20-Jul-2024 Actual Date of Completion (Capex): 31-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 33.61 Mtr / 103.57 Mtr GEJHA 28.919494 77.559382
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 700 LPM / 50 Mtr GEJHA 28.919494 77.559382
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 200 Kl / 14 M GEJHA 28.919494 77.559382
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.0276
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 6.274
2 HDPE 90 0.418
3 HDPE 110 0.211
4 HDPE 125 0.171
5 HDPE 140 0.079
HSC Connection
Sno. Total Nos.
1 755
Other Details
3.17
3.17
2.48
13-Dec-2024
14-Dec-2024