Scheme ID: 20010916 Name of Scheme: SATWAI No. of Villages: 2 No. of Habitation Covered: 1
Total Population Covered: 3992 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 16-Jul-2023 Actual Date of Completion (Capex): 14-Mar-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 29.7 Mtr/86.51 Mtr SATWAI 29.007485 77.546187
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 800 LPM/ 50 Mtr SATWAI 29.007485 77.546187
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 225 Kl/ 12 M SATWAI 29.007485 77.546187
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.02468
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 6.030
2 HDPE 90 0.845
3 HDPE 110 0.239
4 HDPE 125 0.398
HSC Connection
Sno. Total Nos.
1 674
Other Details
3.23
3.23
2.50
01-Aug-2023
13-Dec-2024