Project Completion Certificate (Ground Water)
Scheme ID: 20010918 Name of Scheme: BHOLA No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 6162 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 18-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 42.24 Mtr / 102.13 Mtr BOHLA 29.012648 77.573056
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 1300 LPM / 50 Mtr BOHLA 29.012648 77.573056
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 350 Kl / 14 M BOHLA 29.012648 77.573056
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 200 0.0246
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 4.984
2 HDPE 90 0.929
3 HDPE 110 0.528
4 HDPE 125 0.489
5 HDPE 140 0.456
6 HDPE 180 0.226
HSC Connection
Sno. Total Nos.
1 887
Other Details
3.18
3.18
2.93
05-Nov-2024
06-Nov-2024