Project Completion Certificate (Ground Water)
Scheme ID: 20010927 Name of Scheme: BASTORA NORANG No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 3022 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 25-Sep-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 33.14 Mtr / 102.71 Mtr BASTORA NARANG 29.112036 78.047771
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 650 LPM / 48 Mtr BASTORA NARANG 29.112036 78.047771
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 175 Kl / 12 M BASTORA NARANG 29.112036 78.047771
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.0285
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 5.912
2 HDPE 90 0.210
3 HDPE 110 0.137
4 HDPE 125 0.235
5 HDPE 140 0.169
HSC Connection
Sno. Total Nos.
1 490
Other Details
2.84
2.84
2.21
14-Feb-2025
15-Feb-2025