Project Completion Certificate (Ground Water)
Scheme ID: 20010929 Name of Scheme: KUNEHRA No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 3257 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 15-Sep-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 35.6 Mtr / 97.93 Mtr KUNHERA 29.213274 78.048938
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 700 LPM / 48 Mtr KUNHERA 29.213274 78.048938
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 200 Kl / 12 M KUNHERA 29.213274 78.048938
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.0249
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 3.886
2 HDPE 90 0.533
3 HDPE 125 1.811
4 HDPE 140 1.404
HSC Connection
Sno. Total Nos.
1 396
Other Details
3.14
3.14
2.37
02-Feb-2024
16-Sep-2024