Project Completion Certificate (Ground Water)
Scheme ID: 20011008 Name of Scheme: JITHAULI No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2845 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 16-Mar-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 34.38 Mtr / 91.41 Mtr JITHOLI 28.919009 77.779396
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 600 LPM / 50 Mtr JITHOLI 28.919009 77.779396
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 175 Kl / 12 M JITHOLI 28.919009 77.779396
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.015
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 6.784 “The cost and quantity indicated are up to SLSSC approval; revised cost and quantity shall be finalized after SLSSC approval of revised DPR.”
2 HDPE 90 0.420 “The cost and quantity indicated are up to SLSSC approval; revised cost and quantity shall be finalized after SLSSC approval of revised DPR.”
3 HDPE 110 0.264 “The cost and quantity indicated are up to SLSSC approval; revised cost and quantity shall be finalized after SLSSC approval of revised DPR.”
4 HDPE 125 0.507 “The cost and quantity indicated are up to SLSSC approval; revised cost and quantity shall be finalized after SLSSC approval of revised DPR.”
5 HDPE 160 0.589 “The cost and quantity indicated are up to SLSSC approval; revised cost and quantity shall be finalized after SLSSC approval of revised DPR.”
HSC Connection
Sno. Total Nos.
1 457
Other Details
2.80
2.80
2.21
01-Aug-2023
07-Oct-2024