Project Completion Certificate (Ground Water)
Scheme ID: 20011047 Name of Scheme: Lalpur Gosain village water supply scheme No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 3418 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 29-Sep-2023 Actual Date of Completion (Capex): 18-Oct-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 tubewell 54.26/96.38 lalpur gosain 29.189698 78.73743
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 submersible pump 500/44 lalpur gosain 29.189698 78.73743
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 oht 150/14 lalpur gosain 29.189698 78.73743
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 k-7 di pipe 100 0.025 ok
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN-6: CLASS PE-100 90 0.350 OK
2 HDPE PIPE PN-6: CLASS PE-100 75 0.166 0.166
3 HDPE PIPE PN-6: CLASS PE-100 63 4.000 OK
4 HDPE PIPE PN-6: CLASS PE-100 110 0.038 OK
5 HDPE PIPE PN-6: CLASS PE-100 140 0.076 OK
6 HDPE PIPE PN-6: CLASS PE-100 160 0.00
HSC Connection
Sno. Total Nos.
1 350
Other Details
1.79
0.00
1.78
16-Jan-2025