Project Completion Certificate (Ground Water)
Scheme ID: 20011051 Name of Scheme: KHERI KALAN No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2146 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 24-Feb-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 31.5 Mtr / 92.91 Mtr KHERI KALAN 29.114754 77.476677
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 500 LPM / 48 Mtr KHERI KALAN 29.114754 77.476677
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 150 Kl / 12 M KHERI KALAN 29.114754 77.476677
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.177
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 2.650
2 HDPE 90 0.330
3 HDPE 110 0.147
4 HDPE 125 0.158
5 HDPE 140 0.245
HSC Connection
Sno. Total Nos.
1 396
Other Details
2.07
2.07
1.61
12-Jul-2023
13-Dec-2024