Scheme ID: 20011061 Name of Scheme: MOHDPUR DHUMI No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 3565 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 17-May-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 29 Mtr / 79.9 Mtr MOHDINPUR DHUMI 28.977611 77.482728
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 800 LPM / 56 Mtr MOHDINPUR DHUMI 28.977611 77.482728
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 225 Kl / 18 M MOHDINPUR DHUMI 28.977611 77.482728
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 200 0.0239
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 6.416
2 HDPE 90 0.791
3 HDPE 110 0.327
4 HDPE 125 0.263
5 HDPE 140 0.253
6 HDPE 140 0.253
7 HDPE 160 0.592
HSC Connection
Sno. Total Nos.
1 616
Other Details
3.40
3.40
2.64
03-Oct-2023
06-Nov-2024