Project Completion Certificate (Ground Water)
Scheme ID: 20011064 Name of Scheme: DIMOLI No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2543 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 05-Mar-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 24.08 M / 103.24 M Dimoli 28°54'38.1"N 77°35'56.9"E
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 150 Kl / 12 M Dimoli 28°54'38.1"N 77°35'56.9"E
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 4.069
2 HDPE 90 0.131
3 HDPE 110 0.153
4 HDPE 125 0.221
5 HDPE 140 0.088
HSC Connection
Sno. Total Nos.
1 491
Other Details
2.35
2.35
1.79
16-Jul-2023