| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20011086 | Name of Scheme: Saroura GP Water Supply Scheme | No. of Villages: 1 | No. of Habitation Covered: 3 |
| Total Population Covered: 2037 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 16-Jul-2023 | Actual Date of Completion (Capex): 21-Jul-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 18 (m) / 57 (m) | Saroura | 26.498007 | 81.078102 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible Pump | 600 (Mtr.) | Saroura | 26.498007 | 81.078102 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | Elevated Storage Reservoir | 150 (KL) / 12 (Mtr.) | Saroura | 26.498007 | 81.078102 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI-K9 | 150 | 0.011 | |
| 2 | DI-K9 | 100 | 0.010 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 2.19 | |
| 2 | HDPE | 75 | 1.768 | |
| 3 | HDPE | 90 | 3.608 | |
| 4 | HDPE | 110 | 0.160 | |
| 5 | HDPE | 125 | 0.960 | |
| 6 | HDPE | 140 | 0.209 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 410 |