Project Completion Certificate (Ground Water)
Scheme ID: 20011150 Name of Scheme: BANRAHI No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 1568 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 11-Feb-2023 Actual Date of Completion (Capex): 06-Apr-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 18.08,123.39 Banrahi 26.7777 83.4958
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 24/39 Banrahi 26.7777 83.4958
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Overhead Tank-1 100/12 Banrahi 26.7777 83.4958
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.035 Pipe Laying Completed
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 1.258
2 HDPE 75 1.395
3 HDPE 90 0.407
4 HDPE 110 0.415
5 HDPE 140 0.235
HSC Connection
Sno. Total Nos.
1 228
Other Details
1.79
0.00
1.85
05-Apr-2024
09-Dec-2024