Scheme ID: 20011172 Name of Scheme: SARRA No. of Villages: 1 No. of Habitation Covered: 5
Total Population Covered: 3940 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 05-Mar-2023 Actual Date of Completion (Capex): 24-Sep-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewells 24.03Mtr/ 118.87Mtr SARRA 27.333596 80.073224
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 0.8 M³ per Min /45Mtr SARRA 27.333596 80.073224
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 250KL/ 20Mtr SARRA 27.32099 80.064704
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. Pipe 150 0.02741
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6, Class PE-100 63 3.650
2 HDPE Pipe PN-6, Class PE-100 75 2.858
3 HDPE Pipe PN-6, Class PE-100 90 2.417
4 HDPE Pipe PN-6, Class PE-100 110 2.699
5 HDPE Pipe PN-6, Class PE-100 125 0.126
6 HDPE Pipe PN-6, Class PE-100 140 1.704
7 HDPE Pipe PN-6, Class PE-100 160 0.071
HSC Connection
Sno. Total Nos.
1 552
Other Details
3.56
0.00
3.09
23-Dec-2023
25-Dec-2024