Project Completion Certificate (Ground Water)
Scheme ID: 20011205 Name of Scheme: Bhadarpur Rajpoot Water Supply Scheme No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 3841 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 29-Sep-2023 Actual Date of Completion (Capex): 10-Dec-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 54.26MTR/96.38MTR BHADARPUR RAJPUT 28.781411 78.696837
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 200LPM/43MTR BHADARPUR RAJPUT 28.781411 78.696837
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 75KL/10MTR BHADARPUR RAJPUT 28.78131 78.696924
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7 DI PIPE 150 0.029
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN-6: CLASS PE-100 90 0.587
2 HDPE PIPE PN-6: CLASS PE-100 75 0.876
3 HDPE PIPE PN-6: CLASS PE-100 63 6.765
4 HDPE PIPE PN-6: CLASS PE-100 110 0.207
5 HDPE PIPE PN-6: CLASS PE-100 140 0.311
6 HDPE PIPE PN-6: CLASS PE-100 160 0.289
HSC Connection
Sno. Total Nos.
1 296
Other Details
1.28
1.31
1.31
20-Mar-2024
21-Mar-2024