| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20011220 | Name of Scheme: JANGETHI | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 5364 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 31-Dec-2024 | Actual Date of Completion (Capex): 02-Feb-2023 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 31.37 Mtr / 120.91 Mtr | JANGETHI | 29.043622 | 77.637362 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | 1050 LPM / 52 Mtr | JANGETHI | 29.043622 | 77.637362 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 300 Kl / 14 M | JANGETHI | 29.043622 | 77.637362 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 200 | 0.0196 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 8.249 | |
| 2 | HDPE | 90 | 0.173 | |
| 3 | HDPE | 110 | 0.546 | |
| 4 | HDPE | 125 | 0.078 | |
| 5 | HDPE | 140 | 0.105 | |
| 6 | HDPE | 160 | 0.146 | |
| 7 | HDPE | 180 | 0.101 | |
| 8 | HDPE | 200 | 0.223 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |