Project Completion Certificate (Ground Water)
Scheme ID: 20011227 Name of Scheme: PEPLA No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2911 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 02-Mar-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 21.04 Mtr / 116.23 Mtr PEPLA 28.993666 77.607462
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 600 LPM / 56 Mtr PEPLA 28.993666 77.607462
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 175 Kl / 18 M PEPLA 28.993666 77.607462
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.01970
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 4.214
2 HDPE 90 0.167
3 HDPE 110 0.053
4 HDPE 125 0.210
5 HDPE 160 0.236
HSC Connection
Sno. Total Nos.
1 552
Other Details
2.65
2.65
2.09
19-Jul-2023
10-Mar-2025