Project Completion Certificate (Ground Water)
Scheme ID: 20011235 Name of Scheme: KUSHAWALI No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 5911 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 20-May-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 38.88 Mtr / 99.09 Mtr KUSHAWALI 29.189382 77.630347
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 1200 LPM / 56 Mtr KUSHAWALI 29.189382 77.630347
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 350 Kl / 18 M KUSHAWALI 29.189382 77.630347
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 200 0.0327
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 11.828
2 HDPE 75 0.586
3 HDPE 90 0.27
4 HDPE 110 0.215
5 HDPE 140 0.075
6 HDPE 160 0.758
7 HDPE 200 0.638
HSC Connection
Sno. Total Nos.
1 1075
Other Details
4.77
4.77
3.81
09-Oct-2023
07-Oct-2024